Skip to Main Content
IBM Sustainability Software - Ideas Portal


This portal is to open public enhancement requests against the products and services belonging to IBM Sustainability Software. To view all of your ideas submitted to IBM, create and manage groups of Ideas, or create an idea explicitly set to be either visible by all (public) or visible only to you and IBM (private), use the IBM Unified Ideas Portal (https://ideas.ibm.com).


Shape the future of IBM!

We invite you to shape the future of IBM, including product roadmaps, by submitting ideas that matter to you the most. Here's how it works:

Search existing ideas

Start by searching and reviewing ideas and requests to enhance a product or service. Take a look at ideas others have posted, and add a comment, vote, or subscribe to updates on them if they matter to you. If you can't find what you are looking for,

Post your ideas
  1. Post an idea.

  2. Get feedback from the IBM team and other customers to refine your idea.

  3. Follow the idea through the IBM Ideas process.


Specific links you will want to bookmark for future use

Welcome to the IBM Ideas Portal (https://www.ibm.com/ideas) - Use this site to find out additional information and details about the IBM Ideas process and statuses.

IBM Unified Ideas Portal (https://ideas.ibm.com) - Use this site to view all of your ideas, create new ideas for any IBM product, or search for ideas across all of IBM.

ideasibm@us.ibm.com - Use this email to suggest enhancements to the Ideas process or request help from IBM for submitting your Ideas.

ADD A NEW IDEA

Reports

Showing 4

Setting scope for the RPE document Generation

Description : Currently if you use RPE for report generation in Rhapsody, you would see that the report is generated for the whole model. This RFE calls for possibility to set scope for the RPE reports. The RPE report shall be Generated based on t...
about 3 years ago in IBM Engineering - Systems Design Rhapsody/RMM / Reports 1 Future consideration

[Gateway] Doors baselines analysis/synchronization should be skipped

In a Gateway project, processing of Doors modules takes some time during Gateway analysis and Add high level requirements operations.Especially when Doors modules are big/many.A good improvement would be the following proposal:Gateway should analy...
about 3 years ago in IBM Engineering - Systems Design Rhapsody/RMM / Reports 1 Future consideration

Enhancement request Getting parent element details in Rhapsody model manager with REST API

We are working on getting details of Rhapsody elements though APIBelow is the API I am using to get the same. GEThttps://servername/am/reporting/rhapsody/ArchitectureElement?projectId=_UUID&oslc_config.context=ConfigurationURL Using this I can...
5 months ago in IBM Engineering - Systems Design Rhapsody/RMM / Reports 1 Future consideration

Inverse traceability matrix

It would be desirable to have a report for the inverse traceability for whatever elements is being traced in a report. If we build a traceability matrix for requirements, from top to bottom, (check how many low level requirements satisfy a high le...
almost 5 years ago in IBM Engineering - Systems Design Rhapsody/RMM / Reports 1 Future consideration