Skip to Main Content
IBM Sustainability Software - Ideas Portal


This portal is to open public enhancement requests against the products and services belonging to IBM Sustainability Software. To view all of your ideas submitted to IBM, create and manage groups of Ideas, or create an idea explicitly set to be either visible by all (public) or visible only to you and IBM (private), use the IBM Unified Ideas Portal (https://ideas.ibm.com).


Shape the future of IBM!

We invite you to shape the future of IBM, including product roadmaps, by submitting ideas that matter to you the most. Here's how it works:

Search existing ideas

Start by searching and reviewing ideas and requests to enhance a product or service. Take a look at ideas others have posted, and add a comment, vote, or subscribe to updates on them if they matter to you. If you can't find what you are looking for,

Post your ideas
  1. Post an idea.

  2. Get feedback from the IBM team and other customers to refine your idea.

  3. Follow the idea through the IBM Ideas process.


Specific links you will want to bookmark for future use

Welcome to the IBM Ideas Portal (https://www.ibm.com/ideas) - Use this site to find out additional information and details about the IBM Ideas process and statuses.

IBM Unified Ideas Portal (https://ideas.ibm.com) - Use this site to view all of your ideas, create new ideas for any IBM product, or search for ideas across all of IBM.

ideasibm@us.ibm.com - Use this email to suggest enhancements to the Ideas process or request help from IBM for submitting your Ideas.

ADD A NEW IDEA

Clear

Ideas

Showing 31 of 7035

Can MAS auto adjust to the width of the screen used?

All our end users are complaining that they have to scroll both up and down and sideways. Often the buttons in need of pushing to get to the next page or next record or even required fields in need of populating are hidden outside of view. The aut...
3 months ago in IBM MAS - Oil & Gas / HSE 0 Planned for future release

Auto-lock the Lock number when PTW / isolation certificate status changes to Isolation Complete

Auto-lock the Lock number when PTW / Isolation Certificate status changes to Isolation Complete. Currently users have to lock the lock number manually by clicking on the lock check box, it should be auto checked the field "PLUSGPTWLCKTGOP.LOCKAPPL...
3 months ago in IBM MAS - Oil & Gas / HSE 2 Planned for future release

De-isolation is not allowed if another PTW is using the same location as an isolation point

If 2 independent permit to works are using the same location as an isolation point in Lock Out Tag Out Operations, the isolation cannot be removed until the work in both permits is completed. System is giving below error while try to de-isolate an...
3 months ago in IBM MAS - Oil & Gas / HSE 4 Under review

Baseline at module level in DNG like in Doors

Module-level baselines in DNG gives finer control and flexibility in versioning, especially useful for large, complex projects with multiple contributors. Also it will be helpful for below reasons Fine-Grained Version Control Easier Impact Analysi...
5 months ago in IBM Engineering - Requirements Management DOORS/DOORS Web Access / Baselines 1 Not under consideration

PTW Duplication option is only populating few fields only from the Original record

PTW Duplication option is populating few fields only from the Original record. Below fields to consider for copying on duplication: Basic Information: Description: PLUSGPERMITWORK.DESCRIPTION Work Scope: PLUSGPERMITWORK.DETAILS_LONGDESCRIPTION Loc...
3 months ago in IBM MAS - Oil & Gas / HSE 2 Planned for future release

Emissions Monitoring and Carbon Footprint Optimization

Why This Idea Is Useful Regulatory Compliance Oil & Gas companies face increasingly stringent emissions regulations globally Provides automated compliance with frameworks like EPA regulations, EU Emissions Trading System, and emerging carbon b...
6 months ago in IBM MAS - Oil & Gas / HSE 1 Planned for future release

Enhance Baseline Compare to use other Attributes

We have a customised Baseline compare which allows Export of comparison to an Attribute in the Module (highlights changes from BL 1 to BL2) Allows comparison of other text Attributes (e.g. comments) which can be exported to Word or csv
over 2 years ago in IBM Engineering - Requirements Management DOORS/DOORS Web Access / Baselines 0 Future consideration

Add a Simple Pre Job Brief / Toolbox talk capability that isn't through the permit that works on Mobile

Not all work orders require a permit but may require a toolbox talk before work begins. Maximo should have the ability to record a toolbox talk that is associated directly to the work order or independent of the work order. This should be availabl...
about 1 year ago in IBM MAS - Oil & Gas / HSE 0 Planned for future release

Allow adding existing baselines to new baseline sets to approach a more comprehensive 'emulation' of the concept of versions.

In practise, baselines are more than 'freeze once', 'store away' snapshots of module data / states. Baseline sets are used to capture a defined state of entities described in one or multiple modules. It is not the case, that always the current ver...
almost 2 years ago in IBM Engineering - Requirements Management DOORS/DOORS Web Access / Baselines 0 Future consideration

(optionally) Store filter and view settings with a baseline

Baselines store data. But they do not store the views and filters and their settings at the time the baseline was taken / current data. This creates issues down the line when views and filters change or get removed. It would be preferable to store...
about 2 years ago in IBM Engineering - Requirements Management DOORS/DOORS Web Access / Baselines 0 Future consideration