Skip to Main Content
IBM Sustainability Software - Ideas Portal


This portal is to open public enhancement requests against the products and services belonging to IBM Sustainability Software. To view all of your ideas submitted to IBM, create and manage groups of Ideas, or create an idea explicitly set to be either visible by all (public) or visible only to you and IBM (private), use the IBM Unified Ideas Portal (https://ideas.ibm.com).


Shape the future of IBM!

We invite you to shape the future of IBM, including product roadmaps, by submitting ideas that matter to you the most. Here's how it works:

Search existing ideas

Start by searching and reviewing ideas and requests to enhance a product or service. Take a look at ideas others have posted, and add a comment, vote, or subscribe to updates on them if they matter to you. If you can't find what you are looking for,

Post your ideas
  1. Post an idea.

  2. Get feedback from the IBM team and other customers to refine your idea.

  3. Follow the idea through the IBM Ideas process.


Specific links you will want to bookmark for future use

Welcome to the IBM Ideas Portal (https://www.ibm.com/ideas) - Use this site to find out additional information and details about the IBM Ideas process and statuses.

IBM Unified Ideas Portal (https://ideas.ibm.com) - Use this site to view all of your ideas, create new ideas for any IBM product, or search for ideas across all of IBM.

ideasibm@us.ibm.com - Use this email to suggest enhancements to the Ideas process or request help from IBM for submitting your Ideas.

ADD A NEW IDEA

Pinned ideas

PINNED Enable inventory reservation automatic cron task for specific site
Advantage : Enable the cron for specific site which is necessary. Summary: In Maximo, we have more than 50 Active sites. When we try to enable inventory reservation automatic cron task for specific site, There is no Cron Parameters are available....

IBM MAS - Manage (Base)

Showing 820 of 5123

Functionality to combine the PMWOGEN instance-based log separation with a daily log rotation

There is a requirement to have separate logs for PM WOGEN cron task instances that generate WOs of various types or for various departments. There is also a requirement to rotate those logs daily. Current Maximo OOB functionality does not allow th...
4 months ago in IBM MAS - Manage (Base) 0 Planned for future release

Allow drilldown (location / asset / item / Maintenance plan) to more than 1 level with item

Recently it was not possible to see item in the drilldown, IBM added first level for items which is very usefull. There is only a last effort to add info for items below items and navigate in all the structure up to the last level of item.
5 months ago in IBM MAS - Manage (Base) 4 Future consideration

Add ability to update ABC Type, Reorder Point and Economic Order Quantity from the results of running Inventory Reports

There used to be 6 reports which updated the database, and these were removed for 7.6.1.3 and MAS Manage 8.3 when updating to BIRT 4.8 - a security risk with Database Access is given as the reason. A pair of reports each updated ABC Type, ROP and ...
9 months ago in IBM MAS - Manage (Base) / Supply Chain 0 Planned for future release

Life Sciences requirement: Ability to Enter Multiple Tolerances on Assets

Metrology users would benefit from an ability to define multiple tolerances for an instrument (asset) record.
about 1 month ago in IBM MAS - Manage (Base) 0 Under review

Life Sciences requirement: Ability to Enter Multiple Instrument Ranges to Assets

Metrology users would benefit from an ability to define multiple ranges for an instrument (asset) record.
about 1 month ago in IBM MAS - Manage (Base) 0 Under review

Work Orders (RBA) - Communication Log to indicate the number of attachments

If a work order has a lot of communication records, then you may be interested in a communication with an attachment, but it is not possible to discover which communication log record has an attachment without opening each with the View full messa...
about 1 month ago in IBM MAS - Manage (Base) / Asset/Work Management 0 Under review

Life Sciences requirement: End of Calendar Month Due Date Calculation

Calculating work order due date as an end of calendar month supports business requirements, however a system-wide flag (mxe.pm.enforceMaximumDayOfMonthContinuity) does not provide needed flexibility. Ability to manage this functionality at a site ...
3 months ago in IBM MAS - Manage (Base) 2 Not under consideration

Allow search search attribute only by the alnvalue.

Actually, the attribute search only filters the list if the attribute field is populated which is non sense compare to most of GMAO comparable on market. The strenght of attribute search must not depend on the attribute field.
5 months ago in IBM MAS - Manage (Base) 5 Future consideration

Capture the JVM Name in Synchronous API Tracking instead of only server name

With MAS, the synchronous API tracking is going to show only the server name which will be something like MXServer for all JVMs. That makes it impossible to correlate to the specific JVM that handled the traffic. For example, if I have 6 UI pods, ...
17 days ago in IBM MAS - Manage (Base) / Integration 0 Under review

Configuration Management/Deployment (DBCs) for MAS SaaS

This request is based on some discussions with the SRE team related to how configuration management for large Maximo implementations in MAS SaaS can be improved and automated, leveraging the same way extensions are done in the system (i.e.: via DB...
7 months ago in IBM MAS - Manage (Base) 1 Future consideration