Skip to Main Content
IBM Sustainability Software - Ideas Portal


This portal is to open public enhancement requests against the products and services belonging to IBM Sustainability Software. To view all of your ideas submitted to IBM, create and manage groups of Ideas, or create an idea explicitly set to be either visible by all (public) or visible only to you and IBM (private), use the IBM Unified Ideas Portal (https://ideas.ibm.com).


Shape the future of IBM!

We invite you to shape the future of IBM, including product roadmaps, by submitting ideas that matter to you the most. Here's how it works:

Search existing ideas

Start by searching and reviewing ideas and requests to enhance a product or service. Take a look at ideas others have posted, and add a comment, vote, or subscribe to updates on them if they matter to you. If you can't find what you are looking for,

Post your ideas
  1. Post an idea.

  2. Get feedback from the IBM team and other customers to refine your idea.

  3. Follow the idea through the IBM Ideas process.


Specific links you will want to bookmark for future use

Welcome to the IBM Ideas Portal (https://www.ibm.com/ideas) - Use this site to find out additional information and details about the IBM Ideas process and statuses.

IBM Unified Ideas Portal (https://ideas.ibm.com) - Use this site to view all of your ideas, create new ideas for any IBM product, or search for ideas across all of IBM.

ideasibm@us.ibm.com - Use this email to suggest enhancements to the Ideas process or request help from IBM for submitting your Ideas.

ADD A NEW IDEA

Clear

Ideas

Showing 22 of 7033

freeze the header and first 3 columns like the function available in Excel

We have many requests for freeze the header and first 3 columns our Maximo Asset Management. When there are a lot of rows and columns, the column titles and AssetNum are not visible when scrolling, which makes it difficult to use. Freeze the hea...
almost 4 years ago in IBM MAS - Utilities 1 Not under consideration

The Routes Path Selector will show a Route Stop with no descriptions or target location when the Path Selector is used to select a target location

If the Path Selector (Linear) is used to select a target location, you will receive an error message “BMXAA3616E – Select an asset or location for this route stop.”. It seems that the original design did not consider that a target location would b...
almost 3 years ago in IBM MAS - Manage (Base) / Linear 0 Future consideration

Condition Monitoring Work Order Generation should work the same way as it does for the Cron Task LinearMeasurementWoGenCronTask to eliminate the inconsistency

Maximo Linear allows you to record multiple Gauge or Characteristics meter readings (measurements or observations) taken over a short duration of time. Some of these meter readings may be over the action limits. When using the action Generate Work...
about 3 years ago in IBM MAS - Manage (Base) / Linear 0 Future consideration

Data Restriction Doesn't Effectively Applied to Linear Graphical View

Dear Sir/Madam, Our transportation client has different departments managing different type of assets, all base on same linear chainage. We set data restriction on different user groups to view different asset type, but linear graphical view fails...
over 3 years ago in IBM MAS - Manage (Base) / Linear 0 Not under consideration

CUE - Contractor Pricing Should allow outside labor costs to vary with the filter values just as internal labor

Currently there is no easy way to support estimating outside labor costs when the field conditions change. For example, when digging in rocky soil, the filter values can be used to add additional cost for the additional labor required for this sit...
about 13 years ago in IBM MAS - Utilities 1 Not under consideration

Language Enable Compound Value List Tables

System: Compound Value List Header and List TablesActors: System Administrators & End Users In a multi-language enterprise installation where compound value lists are used users can only see base language descriptions of field entries since th...
over 9 years ago in IBM MAS - Utilities 0 Not under consideration

CU Estimating – Compatible Units Sub-Tab / Excessive Entry Required for Station, etc. (18392 033 000 / 20110908-05)

Prior to T&D 7.1.1, the Compatible Units sub-tab consisted of a Work Sets table and a Compatible Units table. When adding a row to the Compatible Units table, the Station and Work Set would default to the values from the highlighted row on the...
about 14 years ago in IBM MAS - Utilities 3 Not under consideration

Enabling the "View Status History" funnctionality for non calibration assets

When the Status of an Asset is changed, it is not writing to the Asset Status table - View Status History is blank. The "View Status History" functionality does not appear to be enabled for non calibration assets.
almost 12 years ago in IBM MAS - Utilities 1 Functionality already exists

Track Joint Use poles and billing

Utilities need to track joint use attachments and billing charges for their poles and for their attachments to other poles.
about 13 years ago in IBM MAS - Utilities 2 Future consideration

Ejecutar Estimación UC en JVM separada del proceso de usuario.

Procesos de estimación con muchas UC genera errores tipo out of memory cuando tiene más de 1500 unidades constructivas asociadas. Nosotros les proponemos a ustedes separar el proceso de estimación de UC de Maximo de los procesos de UI (en JVM sepa...
about 13 years ago in IBM MAS - Utilities 4 Not under consideration