Skip to Main Content
IBM Sustainability Software - Ideas Portal


This portal is to open public enhancement requests against the products and services belonging to IBM Sustainability Software. To view all of your ideas submitted to IBM, create and manage groups of Ideas, or create an idea explicitly set to be either visible by all (public) or visible only to you and IBM (private), use the IBM Unified Ideas Portal (https://ideas.ibm.com).


Shape the future of IBM!

We invite you to shape the future of IBM, including product roadmaps, by submitting ideas that matter to you the most. Here's how it works:

Search existing ideas

Start by searching and reviewing ideas and requests to enhance a product or service. Take a look at ideas others have posted, and add a comment, vote, or subscribe to updates on them if they matter to you. If you can't find what you are looking for,

Post your ideas
  1. Post an idea.

  2. Get feedback from the IBM team and other customers to refine your idea.

  3. Follow the idea through the IBM Ideas process.


Specific links you will want to bookmark for future use

Welcome to the IBM Ideas Portal (https://www.ibm.com/ideas) - Use this site to find out additional information and details about the IBM Ideas process and statuses.

IBM Unified Ideas Portal (https://ideas.ibm.com) - Use this site to view all of your ideas, create new ideas for any IBM product, or search for ideas across all of IBM.

ideasibm@us.ibm.com - Use this email to suggest enhancements to the Ideas process or request help from IBM for submitting your Ideas.

ADD A NEW IDEA

Clear

Ideas

Showing 32 of 7035

interactive 3D Model of the aircraft for structural damage and repair

Welcome to the 21st century: It would be very nice to have an interactive 3D Model of the aircraft for the tracking of structural damage and repair. This should be usable in the mobile version as well. Highlight would be to take pictures and the s...
almost 3 years ago in IBM MAS - Aviation 1 Future consideration

Allow Inventory Usage from a storeroom to a Salvage location

If an equipment is in a Storeroom and must be move to a SALVAGE location, it is not possible to do it directly with an Inventory Usage.
over 5 years ago in IBM MAS - Aviation 1 Future consideration

The Routes Path Selector will show a Route Stop with no descriptions or target location when the Path Selector is used to select a target location

If the Path Selector (Linear) is used to select a target location, you will receive an error message “BMXAA3616E – Select an asset or location for this route stop.”. It seems that the original design did not consider that a target location would b...
almost 3 years ago in IBM MAS - Manage (Base) / Linear 0 Future consideration

Manage model based equipments through an OMP

We have to manage complex equipment managed in configuration via models application. In model application we have to manage Aircraft variations as Rafale Air, Rafale Marine, Rafale bi-place and Mono-place. We also have to manage GSE (Ground Suppor...
almost 6 years ago in IBM MAS - Aviation 1 Future consideration

Keep the focus of the selected operation after a sign off

Work Order Tracking application Actual tab. Select an operation. Enter a Sign off. After the dialog is closed, the focus is not on the selected operation. But it is on another operation. The MS-Word document is containing the step by step.
about 3 years ago in IBM MAS - Aviation 1 Is a defect

Condition Monitoring Work Order Generation should work the same way as it does for the Cron Task LinearMeasurementWoGenCronTask to eliminate the inconsistency

Maximo Linear allows you to record multiple Gauge or Characteristics meter readings (measurements or observations) taken over a short duration of time. Some of these meter readings may be over the action limits. When using the action Generate Work...
about 3 years ago in IBM MAS - Manage (Base) / Linear 0 Future consideration

Data Restriction Doesn't Effectively Applied to Linear Graphical View

Dear Sir/Madam, Our transportation client has different departments managing different type of assets, all base on same linear chainage. We set data restriction on different user groups to view different asset type, but linear graphical view fails...
over 3 years ago in IBM MAS - Manage (Base) / Linear 0 Not under consideration

Work packages, Ability to run Apply Customer Agreement many times against the same WP

Work packages, Ability to run Apply Customer Agreement many times against the same WP.Bombardier needs to be able to run the Apply Customer Agreement against the same WP many times.
over 4 years ago in IBM MAS - Aviation 1 Future consideration

Inventory Usage: Roll down the assetnum from the shipment creation to the inventory usage if the quantity is 1

On an inventory usage, if the equipment is selected during the shipment creation, the information isn't rolled down to the inventory usage.
about 5 years ago in IBM MAS - Aviation 1 Future consideration

Define Partnumber as Configuration Managed=yes for non rotable

Now we have installed MAXIMO for Aviation 7.6.8.1 with ifix 1. We would like to have this request under consideration for future versions of the product.Allow the definition on Parts Numbers within ‘Part Number Master Application' as Configuration...
over 5 years ago in IBM MAS - Aviation 2 Future consideration