Skip to Main Content
IBM Sustainability Software - Ideas Portal


This portal is to open public enhancement requests against the products and services belonging to IBM Sustainability Software. To view all of your ideas submitted to IBM, create and manage groups of Ideas, or create an idea explicitly set to be either visible by all (public) or visible only to you and IBM (private), use the IBM Unified Ideas Portal (https://ideas.ibm.com).


Shape the future of IBM!

We invite you to shape the future of IBM, including product roadmaps, by submitting ideas that matter to you the most. Here's how it works:

Search existing ideas

Start by searching and reviewing ideas and requests to enhance a product or service. Take a look at ideas others have posted, and add a comment, vote, or subscribe to updates on them if they matter to you. If you can't find what you are looking for,

Post your ideas
  1. Post an idea.

  2. Get feedback from the IBM team and other customers to refine your idea.

  3. Follow the idea through the IBM Ideas process.


Specific links you will want to bookmark for future use

Welcome to the IBM Ideas Portal (https://www.ibm.com/ideas) - Use this site to find out additional information and details about the IBM Ideas process and statuses.

IBM Unified Ideas Portal (https://ideas.ibm.com) - Use this site to view all of your ideas, create new ideas for any IBM product, or search for ideas across all of IBM.

ideasibm@us.ibm.com - Use this email to suggest enhancements to the Ideas process or request help from IBM for submitting your Ideas.

ADD A NEW IDEA

IBM Engineering - Test Management

Showing 155

In ETM in a copied Test Case the linked items to EWM (CCM and SCM) are not copied

Current behavior: In EWM ETM if a Test Case is copied the link to EWM SCM linked files and to work items are not available in the copied Test Case, as it is for links to requirements. Requested change: Include the links to the linked files and wor...
8 months ago in IBM Engineering - Test Management / Usability 0 Future consideration

Show additional/more information for Related Files at mouse over.

Current behavior: When hoovering over the linked files in the ETM Test Cases no summary is shown. When you have your mouse over the Validates Requirements in ETM you get a short summary about the linked requirement. Requested change: If you put th...
8 months ago in IBM Engineering - Test Management / Usability 0 Future consideration

The reportable (or OSLC) REST API shall provide a complete list of attachments of a test artifact

I can add an attachment either a) by direct upload of a file in the attachment section b) of by the insert attachment function within a rich text section of a test artifact. Both attachments are listed in the attachment section, in a form a) 300...
about 2 years ago in IBM Engineering - Test Management / Integrations 0 Future consideration

Link Validity configurable per attribute (Test case)

Closely related to https://ideas.ibm.com/ideas/ENGRMDN-I-2. This is very similar to the functionality in DOORS Next which will be introduced in 7.0.3. Scenario: Test engineers have to adapt specific test case attributes, which do not have any impa...
9 months ago in IBM Engineering - Test Management / Test Execution 0 Future consideration

Allow to override merge Test Artifacts in "Approved" state

We have the following setup:1. We have a stream (Stream A) where in the Test Artifacts are created and baselined.2. We do a merge operation from Stream A to Stream B.3. We also have the Pre-Condition "Disallow Saving of Result with State Approved ...
9 months ago in IBM Engineering - Test Management / Usability 0 Future consideration

ETM: Adapt predefined setting for Estimate and Time Spend

We would like to change the predefined setting in ETM for the following fields: - Estimate (in Test Case) - Time Spent (in Test Case Execution Record) -> Currently the tool takes 8h as 1d, 5d as 1w. Is it possible to define 24h as 1d, 7d as 1w,...
over 1 year ago in IBM Engineering - Test Management / Administration 0 Future consideration

Add an automatic version attribute which increments with the artifact workflow

We would like to have a new "Version" attribute in test artifacts which increments itself automatically with the workflow. For instance, each time a test artifact status is changed from "Approved" back to "Draft" with the action "Reopen", the vers...
over 1 year ago in IBM Engineering - Test Management / Integrations 1 Future consideration

Excel Importer should have an option to concatenate TCER with iteration when use urn:com.ibm.rqm:testphase: as same as it can in ETM

When users want to create TCER that has name concatenated with iteration, it can be done in ETM by single check. Test Case > Generate Execution Record > Add the iteration as a suffix to execution record names But it can't be done as simply i...
10 months ago in IBM Engineering - Test Management / Excel & Word Import 0 Future consideration

Limit for max number of test steps in a Test Suite

It should be possible for an administrator to configure max number of test steps in a Test Suite and/or in a Test Case. Currently users can create complex Test Cases with hundreds or thousands of manual test steps. This leads to 504 Gateway Time-o...
over 1 year ago in IBM Engineering - Test Management / Test Execution 0 Future consideration

Test Suite Execution Result Should list the event details when result is changed by user ADMIN ( System Generated Role) with a message in TSEResult

When scheduling a manual execution for the Test Suite by selecting the schedule check box. And execution is not completed( it is left in Progress) and let the session expire Test Suite Result changes the result by ADMIN ( System User)>> A we...
over 1 year ago in IBM Engineering - Test Management / Test Execution 0 Future consideration