Skip to Main Content
IBM Sustainability Software - Ideas Portal


This portal is to open public enhancement requests against the products and services belonging to IBM Sustainability Software. To view all of your ideas submitted to IBM, create and manage groups of Ideas, or create an idea explicitly set to be either visible by all (public) or visible only to you and IBM (private), use the IBM Unified Ideas Portal (https://ideas.ibm.com).


Shape the future of IBM!

We invite you to shape the future of IBM, including product roadmaps, by submitting ideas that matter to you the most. Here's how it works:

Search existing ideas

Start by searching and reviewing ideas and requests to enhance a product or service. Take a look at ideas others have posted, and add a comment, vote, or subscribe to updates on them if they matter to you. If you can't find what you are looking for,

Post your ideas
  1. Post an idea.

  2. Get feedback from the IBM team and other customers to refine your idea.

  3. Follow the idea through the IBM Ideas process.


Specific links you will want to bookmark for future use

Welcome to the IBM Ideas Portal (https://www.ibm.com/ideas) - Use this site to find out additional information and details about the IBM Ideas process and statuses.

IBM Unified Ideas Portal (https://ideas.ibm.com) - Use this site to view all of your ideas, create new ideas for any IBM product, or search for ideas across all of IBM.

ideasibm@us.ibm.com - Use this email to suggest enhancements to the Ideas process or request help from IBM for submitting your Ideas.

ADD A NEW IDEA

All ideas

Showing 2081

Configurable display of non-working time in Graphical Scheduler

Could a configurable property be added to control the display of shading in the Graphical Gantt view for Scheduler. In some cases the zoom factor on a schedule causes the shading of the non-working time to overwhelm the colorization of the task ba...
over 3 years ago in IBM MAS - Scheduler 1 Not under consideration

Initial Link Validity is Suspect

Unfortunately this is the expected behaviour when setting link validity. Both for it's initial setting and any subsequent changes. "The system automatically sets links to Suspect when artifact contents change." I understand this would be very frus...
over 3 years ago in IBM Engineering - Requirements Management DOORS Next / Feature 0 Not under consideration

Add ability to delete meter readings in Edit Meter Reading History

Users are requesting the ability to delete erroneous meter readings in Edit Meter Reading History. They are unable to modify the meter reading date and therefore need the ability to delete bad records. A conference call was held 10/9/13 with Ed Jo...
about 11 years ago in IBM MAS - Manage (Base) / Integration 2 Not under consideration

Space Assessment App - UX look & Feel

UI on iPad is not perfect. Slight adjustments should be made to align text, prevent text from overflowin into graphic area
over 7 years ago in IBM TRIRIGA Space Management 2 Not under consideration

Ability to add Pre-conditions to all testcases simultaneously

Currently, in RQM, we have to add pre-condition to testcases -> one testcase at a time -> by opening the testcase in a separate tab and add precondition informationIf the Test Plan has 40 testcases and all testcases have same precondition, i...
almost 4 years ago in IBM Engineering - Test Management / Usability 2 Not under consideration

Ability to see testcase details in the same pane as the test case list view

Currently, in RQM, we have testcases listed in list view. To review testcase information like pre-condition, test steps and expected results, we have to open the testcase in a separate tab or separate view and we can review all the information for...
almost 4 years ago in IBM Engineering - Test Management / Usability 1 Not under consideration

Report Builder should provide command line adapter script's argument and command using the LQE datasource

When using LQE or LQE scoped by configuration, Report Builder should provide a command line adapter's command and argument fields as attributes of QM Test Script
almost 4 years ago in IBM Engineering - Test Management / Reporting 0 Not under consideration

VSD's translucent images is not displayed normally after uploading.

The customer using for define, trace, analyze, and manage requirements while collaboration with each company. This translucent markings in circuit documents written by in VISIO are very useful for recognizing important areas for designers. But cur...
almost 4 years ago in IBM Engineering - Requirements Management DOORS Next / Feature 0 Not under consideration

Allow inserting test step in test script after last step

During manual test execution it is possible to insert additional test script steps. But this is no longer possible, if you set the step result state (e.g. passed) on the LAST step. Currently you have FIRST to insert the step, THEN go back to previ...
almost 4 years ago in IBM Engineering - Test Management / Test Execution 0 Not under consideration

Global search in toolbar

Users would like the ability for a ticket and change search on the toolbar at the top of ICD I had prev logged an sr 15635
over 7 years ago in IBM MAS - Maximo IT 3 Not under consideration