Skip to Main Content
IBM Sustainability Software - Ideas Portal


This portal is to open public enhancement requests against the products and services belonging to IBM Sustainability Software. To view all of your ideas submitted to IBM, create and manage groups of Ideas, or create an idea explicitly set to be either visible by all (public) or visible only to you and IBM (private), use the IBM Unified Ideas Portal (https://ideas.ibm.com).


Shape the future of IBM!

We invite you to shape the future of IBM, including product roadmaps, by submitting ideas that matter to you the most. Here's how it works:

Search existing ideas

Start by searching and reviewing ideas and requests to enhance a product or service. Take a look at ideas others have posted, and add a comment, vote, or subscribe to updates on them if they matter to you. If you can't find what you are looking for,

Post your ideas
  1. Post an idea.

  2. Get feedback from the IBM team and other customers to refine your idea.

  3. Follow the idea through the IBM Ideas process.


Specific links you will want to bookmark for future use

Welcome to the IBM Ideas Portal (https://www.ibm.com/ideas) - Use this site to find out additional information and details about the IBM Ideas process and statuses.

IBM Unified Ideas Portal (https://ideas.ibm.com) - Use this site to view all of your ideas, create new ideas for any IBM product, or search for ideas across all of IBM.

ideasibm@us.ibm.com - Use this email to suggest enhancements to the Ideas process or request help from IBM for submitting your Ideas.

ADD A NEW IDEA

All ideas

Showing 2831

Inventory Receiving (RBA) - Provide an image of the item being received

To help verify that the item being received is the correct one, it would be useful to navigate from the Item in the Receiving screen to be able to see the Item’s image as you can do in desktop Maximo. This would only be the case in the Role Based ...
about 1 year ago in IBM MAS - Mobile 1 Future consideration

Add the ability to tie two (or more) stats to a date in current (not historical) reporting

Report Builder is limited on the attributes it can take on a historical report; it's possible to use more attributes on a current mode. IBM Engineers often recommend the use of fields (like tags) when proving out a concept or supplementing the too...
about 1 year ago in IBM Engineering - Reporting 3 Future consideration

API supported for downstream integration

TRIRIGA should support OAUTH for webservices downstream integration.
over 5 years ago in IBM TRIRIGA Application Platform 2 Future consideration

In 4K display the user interface icons are too small. User not able to work with the tool.

Hello Team, Rhapsody 9.0.1 issue which clutters the User interface and contents overlapping. In 4K display the user interface icons are too small. User not able to work with the tool. If we reduces the resolution of the display, it is working
almost 3 years ago in IBM Engineering - Systems Design Rhapsody/RMM / Modeling and UI 1 Future consideration

Include formal gates and input/output parameters to sequence diagram references

Hello, according to UML specification (2.5.1) interactions can have formal gates (Figure_17.1_UMLSpecification.png). They would allow messages from and to the diagram frame, see Figure_17.4_UmlSpecification.png and Figure_17.14_UmlSpecification.pn...
9 months ago in IBM Engineering - Systems Design Rhapsody/RMM / Modeling and UI 1 Future consideration

DNG : EXCEL export of artifact contents linked with other artifacts - Option to remove URI

- in DNG, create a first artifact with, in the content : This contents refers another artifact with "Add Link". This link is : - create a second artifact with, in the content : This artifact is linked with another one, but in XLSX export the resul...
almost 2 years ago in IBM Engineering - Requirements Management DOORS Next / Feature 0 Future consideration

Provide an XLSX export for BIRT reports that does not break into multiple tabs.

Many customers want to export BIRT reports to XLSX. Unfortunately the current xlsx export option places the output across multiple tabs. Please provide a mechanism to turn this off.
almost 3 years ago in IBM MAS - Manage (Base) 1 Future consideration

Import Export Tries to Process Excel File

Enhancement request is needed to improve the validation. See also PMR TS010289537 In short term would improving this error message add value (via a defect) BMXAA5804E - Import of data in file BulkInvoiceTesting_NOTCSVFILE.xlsx was unsuccessful....
about 2 years ago in IBM MAS - Manage (Base) 0 Future consideration

Maximo Mobile application allows you to control/track a mobile technician

Hello colleagues. Three customers have already contacted us with the requirement that the Maximo Mobile application allows you to control/track a mobile technician. Namely. To stop the timer of the work order when the mobile technician moves away ...
9 months ago in IBM MAS - Mobile 0 Future consideration

Technician (RBA) - Difficult to enter future Schedule Dates when creating a new work order - remove the schedule finish it is superfluous.

There is a problem asking for both Schedule Start and Schedule Finish dates when creating a new work order in the Technician application because date fields get defaulted which means that if you change the Schedule Start to a future date/time you ...
4 months ago in IBM MAS - Mobile 0 Future consideration