Skip to Main Content
IBM Sustainability Software - Ideas Portal


This portal is to open public enhancement requests against the products and services belonging to IBM Sustainability Software. To view all of your ideas submitted to IBM, create and manage groups of Ideas, or create an idea explicitly set to be either visible by all (public) or visible only to you and IBM (private), use the IBM Unified Ideas Portal (https://ideas.ibm.com).


Shape the future of IBM!

We invite you to shape the future of IBM, including product roadmaps, by submitting ideas that matter to you the most. Here's how it works:

Search existing ideas

Start by searching and reviewing ideas and requests to enhance a product or service. Take a look at ideas others have posted, and add a comment, vote, or subscribe to updates on them if they matter to you. If you can't find what you are looking for,

Post your ideas
  1. Post an idea.

  2. Get feedback from the IBM team and other customers to refine your idea.

  3. Follow the idea through the IBM Ideas process.


Specific links you will want to bookmark for future use

Welcome to the IBM Ideas Portal (https://www.ibm.com/ideas) - Use this site to find out additional information and details about the IBM Ideas process and statuses.

IBM Unified Ideas Portal (https://ideas.ibm.com) - Use this site to view all of your ideas, create new ideas for any IBM product, or search for ideas across all of IBM.

ideasibm@us.ibm.com - Use this email to suggest enhancements to the Ideas process or request help from IBM for submitting your Ideas.

ADD A NEW IDEA

All ideas

Showing 5799 of 5799

The application contains several unnecessary and invisible tab-steps

There are several empty spaces between when tabbed the focus goes there
over 5 years ago in IBM TRIRIGA Application Platform 2 Not under consideration

We request to add the properties of Multiplicity to Pin and Parameter

A parameter is a specification of an argument used to pass information into or out of an invocation of a behavioral feature. Generalizations • “MultiplicityElement (from Kernel)” • “TypedElement (from Kernel)” Business Justification: 1) Compliance...
over 5 years ago in IBM Engineering - Systems Design Rhapsody/RMM / Modeling and UI 3 Future consideration

Interfaces available for contracting at the ports

A port allows the contracting of the interfaces. Currently all newterm Elements that has the string "Interface" in their name is allowed to be contraced.This doesnt seem the right way to determine which modelElements can be contracted or not. This...
over 5 years ago in IBM Engineering - Systems Design Rhapsody/RMM / Modeling and UI 1 Future consideration

Need a method to verify and validate data imported from Excel using the RQM Excel Importer tool

Need a method to ensure data imported from excel went to the intended fields in RQM and that nothing was truncated in any fields, required fields have values, the rich text came over correctly, etc.
over 5 years ago in IBM Engineering - Test Management / Administration 1 Not under consideration

Increase the size of the Manual Test Step Comments, currently it is limited to 250 characters

Comments on Test Steps are limited to 250 characters. Our electrical Validation users would like it increased to whatever maximum size can be provided.
over 5 years ago in IBM Engineering - Test Management / Usability 2 Not under consideration

Reduce the number of confirmation dialog to one When moving Multiple Requirements

1. Select 3 requirements in Rhapsody browser view. Refer the attachment.2. Add these requirements as sub requirements by drag and drop. Now the Rhapsody will popup 3 confirmation dialogs. If 'n' number of requirements are moved then Rhapsody will ...
over 5 years ago in IBM Engineering - Systems Design Rhapsody/RMM / Modeling and UI 2 Future consideration

Create customized Execution States in RQM

Would like to have the ability to create new "Execution States" in RQM and be able to configure them on how they are to behave and be interpreted by the system. They need to be recognized at the Test Case level and at the individual steps of a Tes...
over 5 years ago in IBM Engineering - Test Management / Usability 1 Not under consideration

Inverse traceability matrix

It would be desirable to have a report for the inverse traceability for whatever elements is being traced in a report. If we build a traceability matrix for requirements, from top to bottom, (check how many low level requirements satisfy a high le...
over 5 years ago in IBM Engineering - Systems Design Rhapsody/RMM / Reports 1 Future consideration

Additional Icons for DOORS NG Workflows

Currently for DOORS NG there is only a very limited number of icons available to Assign to Workflow States and Actions. This is quite limited compared to:1. The icon list available for DOORS NG Artifact Types2. The icon list available for RTC Work...
over 5 years ago in IBM Engineering - Requirements Management DOORS Next / Feature 3 Not under consideration

Calendar : By Week

Extend the Calendar in a way that the user can see the calendar week according to the ISO 8601.
over 5 years ago in IBM TRIRIGA Application Platform 1 Planned for future release