Skip to Main Content
IBM Sustainability Software - Ideas Portal


This portal is to open public enhancement requests against the products and services belonging to IBM Sustainability Software. To view all of your ideas submitted to IBM, create and manage groups of Ideas, or create an idea explicitly set to be either visible by all (public) or visible only to you and IBM (private), use the IBM Unified Ideas Portal (https://ideas.ibm.com).


Shape the future of IBM!

We invite you to shape the future of IBM, including product roadmaps, by submitting ideas that matter to you the most. Here's how it works:

Search existing ideas

Start by searching and reviewing ideas and requests to enhance a product or service. Take a look at ideas others have posted, and add a comment, vote, or subscribe to updates on them if they matter to you. If you can't find what you are looking for,

Post your ideas
  1. Post an idea.

  2. Get feedback from the IBM team and other customers to refine your idea.

  3. Follow the idea through the IBM Ideas process.


Specific links you will want to bookmark for future use

Welcome to the IBM Ideas Portal (https://www.ibm.com/ideas) - Use this site to find out additional information and details about the IBM Ideas process and statuses.

IBM Unified Ideas Portal (https://ideas.ibm.com) - Use this site to view all of your ideas, create new ideas for any IBM product, or search for ideas across all of IBM.

ideasibm@us.ibm.com - Use this email to suggest enhancements to the Ideas process or request help from IBM for submitting your Ideas.

ADD A NEW IDEA

All ideas

Showing 2839

Decouple Admin role and SRM role

We would like to be able to allow our country leaders to customise their own SRM frameworks - but we wouldn't want them to be system admins. Currently, only system admins can create custom frameworks.
8 months ago in IBM Envizi - ESG Suite / ESG Reporting Frameworks 3 Future consideration

ReqIF obfuscator for diagnostics

During ReqIf import we ran into multiple issues. The logs and demonstration did not provide enough information for support to solve the issue. Support require a copy of the ReqIF file. Since the data has classified information we cannot do so. It ...
over 1 year ago in IBM Engineering - Requirements Management DOORS Next / Feature 0 Future consideration

Provision to copy baseline link from the dialogue box shown after baseline creation

When a baseline is crated ,we get a dialogue box saying "Baseline is created successfully." If we can also have an option to copy baseline link from there ,it saves much time. Useful when we provide Baseline links for reviews Note: Currently ,we h...
over 1 year ago in IBM Engineering - Requirements Management DOORS Next / Usability 0 Future consideration

Improve Workflow Designer to all allow disablement of out of data processes

Workflow designer is very inconsistent with allowing process to be disabled, even when the main process revision that they are attached to is disabled. This was reported to IBM on the referenced case as a problem with Application Designer, and the...
almost 4 years ago in IBM MAS - Manage (Base) 1 Future consideration

Custom bind variables

It would be helpful if we could define custom bind variables in Maximo. Examples: &FIRSTNAME& &ISINTERACTIVE& &ENVNAME& (i.e. the Maximo environment name; not the same thing as the existing :&HOSTNAME& variable). Us...
about 3 years ago in IBM MAS - Manage (Base) / System Admin Config/Security 3 Future consideration

Cross-component ReqIF

DOORS Next can export a component with its internal links to a ReqIF file. But it can't export two DOORS Next, and more importantly : the links between these two components. This enhancement could allow users to use ReqIF to export DOORS documents...
almost 2 years ago in IBM Engineering - Requirements Management DOORS Next / Usability 1 Future consideration

Approval date for each users in JRS report.

Show in JRS report date when each user put their resolution in approval. Our customers need approval report in which want to see date when each user put their resolution in approval (approved or rejected).For example, WIs with id 120, 125 and two ...
about 3 years ago in IBM Engineering - Workflow Management / Reporting 3 Future consideration

Installation should select latest version of compiler

Just now the installer leaves a factoryC++.prp file with many versions of VS listed, but doesn't even default to the latest...even when it know which versions of VS are installed. This should be selectable at install time.
8 months ago in IBM Engineering - Systems Design Rhapsody/RMM / Rhapsody Client 1 Future consideration

Need a tool or feature to fix type system inconsistencies

LQE RB Reports don't resolve when RDF URI Conflicts exist within ELM Properties. During Report Creation Time, conflicts appear on the screen for report builders. These conflicts should never be allowed to coexist in the same ELM instance. No provi...
8 months ago in IBM Engineering - Requirements Management DOORS Next / Administration 1 Future consideration

Provide a feature about an option to change default behavior of embedded resources as minimizing / maximizing in each artifacts in a module

Provide a feature about an option to change default behavior of embedded/wrapped resources for minimizing / maximizing in each artifacts in a module. Embedded/wrapped resources are displayed as maximized when opening a module.It takes a lot of tim...
over 1 year ago in IBM Engineering - Requirements Management DOORS Next / Usability 0 Future consideration