Skip to Main Content
IBM Sustainability Software - Ideas Portal


This portal is to open public enhancement requests against the products and services belonging to IBM Sustainability Software. To view all of your ideas submitted to IBM, create and manage groups of Ideas, or create an idea explicitly set to be either visible by all (public) or visible only to you and IBM (private), use the IBM Unified Ideas Portal (https://ideas.ibm.com).


Shape the future of IBM!

We invite you to shape the future of IBM, including product roadmaps, by submitting ideas that matter to you the most. Here's how it works:

Search existing ideas

Start by searching and reviewing ideas and requests to enhance a product or service. Take a look at ideas others have posted, and add a comment, vote, or subscribe to updates on them if they matter to you. If you can't find what you are looking for,

Post your ideas
  1. Post an idea.

  2. Get feedback from the IBM team and other customers to refine your idea.

  3. Follow the idea through the IBM Ideas process.


Specific links you will want to bookmark for future use

Welcome to the IBM Ideas Portal (https://www.ibm.com/ideas) - Use this site to find out additional information and details about the IBM Ideas process and statuses.

IBM Unified Ideas Portal (https://ideas.ibm.com) - Use this site to view all of your ideas, create new ideas for any IBM product, or search for ideas across all of IBM.

ideasibm@us.ibm.com - Use this email to suggest enhancements to the Ideas process or request help from IBM for submitting your Ideas.

ADD A NEW IDEA

Pinned ideas

PINNED Power BI capability alignment between Desktop vs embedded solution
Requesting Customer: Fraser Property but this would benefit all customers using Envizi Power BI capability Business Impact: The Frasers Property Team have recently explored the use of the embeded PowerBI functionality and have found that there are...
PINNED Enable inventory reservation automatic cron task for specific site
Advantage : Enable the cron for specific site which is necessary. Summary: In Maximo, we have more than 50 Active sites. When we try to enable inventory reservation automatic cron task for specific site, There is no Cron Parameters are available....

All ideas

Showing 2734

Provide a current IBM Java 8 JRE on Fix Central

Clarity reports lists "IBM Java 8 and future fix packs" as supported. Fix Central currently lists IBM JRE 8.0.6.5. This JRE is outdated and subject to a long list of vulnerabilities (CVEs). We request that the latest IBM Java 8.0.7.x JRE be tested...
almost 3 years ago in IBM Engineering - Requirements Management DOORS/DOORS Web Access 0 Future consideration

Rhapsody Model checker : User defined checks separated from Built In Checks

User defined checks are inserted in between the existing checks. Reference: User_defined_checks_separated_from_Built_In_Checks.png
about 4 years ago in IBM Engineering - Systems Design Rhapsody/RMM / Modeling and UI 2 Future consideration

Rhapsody Model checker : Java API to export the result to excel

There should be possibility to export the model checker results to excel sheet via Java API.
about 4 years ago in IBM Engineering - Systems Design Rhapsody/RMM / Modeling and UI 1 Future consideration

TS007555513 : 7.6.1.2 - Newly-added Specification attributes are not appearing automatically in Asset Template

As per discussion over the IBM case TS007555513 requested for enhancement request. Steps to Replicate in Preview Site: 1. Select an Asset template with Classification - Eg: CD8769 2. Modify that classification and add new attribute 3. Refresh asse...
almost 3 years ago in IBM MAS - Manage (Base) 0 Future consideration

Remove Redundant Crafts from Assignment View in Graphical Assignment

As per case TS006958852, we have been requested to raise an RFE to recommend that a change be made to remove redundant crafts from the Graphical Assignment, Assignment View. At the moment if a craft is referred to on a Work Order, the craft will a...
almost 3 years ago in IBM MAS - Scheduler 0 Future consideration

Ability to modify actual start/finish date in RTC planning or to have Configuration to Use Custom Attributes as Start and End Date

We are using the RTC Plan and Gantt Chart for Planning Gantt Chart Uses Start Date and End Date based on the work Item State Changed to plot the schedule now. Currently We are not able to modify the Start Date of Task to update the Gantt Chart in ...
over 1 year ago in IBM Engineering - Workflow Management / Planning 1 Future consideration

Show State icons for CCM Tickets in RM Link section

In ELM there icons used for linked CCM-artifacts in RM/QM are confusing. for the case I used in CCM the "scrum2.process" and in RM the "full_safe_50.process" and made no changes to the processes. I have a few CCM-artifacts in different states open...
over 1 year ago in IBM Engineering - Requirements Management DOORS Next / Integrations 0 Future consideration

Duplicating an ad-hoc report: Need to enable the Share/Public field

Scenario: I have a shared/public ad-hoc report that I've duplicated via the Duplicate action in the Report Administration application.When I look at the ad-hoc report configuration by editing the report, I see that the report isn't flagged as Shar...
almost 3 years ago in IBM MAS - Manage (Base) / System Admin Config/Security 1 Future consideration

Improve RMM Picker

The RMM Picker has not the same functionality like RDM.e.g. search&filter is missing
over 5 years ago in IBM Engineering - Systems Design Rhapsody/RMM / Web Client 0 Future consideration

Update the last TCR when creating a TCER

When large enterprise ETM deployments have projected data scale growth exceeding the maximum capacity of ETM, one solution is to reduce the number of test artifacts created in ETM. As TCRs are one of the most abundant test artifact types, customer...
over 1 year ago in IBM Engineering - Test Management / Test Execution 0 Future consideration