Skip to Main Content
IBM Sustainability Software - Ideas Portal


This portal is to open public enhancement requests against the products and services belonging to IBM Sustainability Software. To view all of your ideas submitted to IBM, create and manage groups of Ideas, or create an idea explicitly set to be either visible by all (public) or visible only to you and IBM (private), use the IBM Unified Ideas Portal (https://ideas.ibm.com).


Shape the future of IBM!

We invite you to shape the future of IBM, including product roadmaps, by submitting ideas that matter to you the most. Here's how it works:

Search existing ideas

Start by searching and reviewing ideas and requests to enhance a product or service. Take a look at ideas others have posted, and add a comment, vote, or subscribe to updates on them if they matter to you. If you can't find what you are looking for,

Post your ideas
  1. Post an idea.

  2. Get feedback from the IBM team and other customers to refine your idea.

  3. Follow the idea through the IBM Ideas process.


Specific links you will want to bookmark for future use

Welcome to the IBM Ideas Portal (https://www.ibm.com/ideas) - Use this site to find out additional information and details about the IBM Ideas process and statuses.

IBM Unified Ideas Portal (https://ideas.ibm.com) - Use this site to view all of your ideas, create new ideas for any IBM product, or search for ideas across all of IBM.

ideasibm@us.ibm.com - Use this email to suggest enhancements to the Ideas process or request help from IBM for submitting your Ideas.

ADD A NEW IDEA

Pinned ideas

PINNED Power BI capability alignment between Desktop vs embedded solution
Requesting Customer: Fraser Property but this would benefit all customers using Envizi Power BI capability Business Impact: The Frasers Property Team have recently explored the use of the embeded PowerBI functionality and have found that there are...
PINNED Enable inventory reservation automatic cron task for specific site
Advantage : Enable the cron for specific site which is necessary. Summary: In Maximo, we have more than 50 Active sites. When we try to enable inventory reservation automatic cron task for specific site, There is no Cron Parameters are available....

All ideas

Showing 2734

Ability for the Gantt to automatically refresh without user action

Giving the flexibility to configure the gantt to automatically refresh and fix dependencies once an underlying schedule task is updated so that users do not have to manually update a task and refresh the gantt after every change
almost 6 years ago in IBM TRIRIGA Capital Projects Management 4 Future consideration

The upgrade log should indicate whether the rs/db folder and rs/conf folders were copied or not.

When you upgrade JRS in a side-dy-side configuration the rs/db folder and rs/conf folders will not be copied to the destination folders when they already exist. The rs_upgrade_migration_rs_updateConfigurationFiles.log does not indicate that the fo...
over 1 year ago in IBM Engineering - Reporting / Report Builder 1 Future consideration

Add "removed from source" information to overview of changes in comparison

When comparing 2 streams, artifacts that were removed from a module (not finally deleted) are not shown in that written form (on the table on the left - see "table" and table_2"). This removal is visible: only "visually" in compare window from DNX...
over 1 year ago in IBM Engineering - Requirements Management DOORS Next / Usability 0 Future consideration

500 image per page option

An active plant can get more than 1000 new images in a data set in day, and having to click through more than 10 pages for a single day is a hassle. It also makes it difficult to compare results across the entire day. An additional option for 500 ...
almost 3 years ago in IBM MAS - Visual Inspection 0 Future consideration

Change bounding box color for failed inspections

Currently, all inspected objects have a green box, whether the inspection was a pass or fail. Having this box be a different color would make it easier to tell at a glance which inspections were considered a failure.
almost 3 years ago in IBM MAS - Visual Inspection 0 Future consideration

'Replace in' and 'Replace with' options on RWS in eclipse should be placed away from each other

In Eclipse, When we right click for the options on Repository workspace, we have an option of "Replace in" and "Replace with". As "Replace in" and "Replace with" options are close to each other and makes little difference while reading them Instea...
almost 3 years ago in IBM Engineering - Workflow Management / Source Control 1 Future consideration

SCM Check-in and Deliver option does not provide option to link to a change request on another RTC server

Use case: Change sets from one RTC server to be linked to Change request from another RTC server. When "Check-in & Deliver" option is selected for checking in pending changes in the Eclipse Client, in the associate work item menu, it does not ...
almost 3 years ago in IBM Engineering - Workflow Management / Usability 1 Future consideration

Document Update: destroy the reactive instance (delete should never be called directly)

Add "Call Destroy() method for destroying the reactive instance (delete should never be called directly)" to Code generation in Rhapsody documentation.This is already described at , but this is for C, not C++.
over 4 years ago in IBM Engineering - Systems Design Rhapsody/RMM / Code and Execution 1 Future consideration

Request for displaying all enumeration values in graph X-axis regardless whether any artifact has this value assigned or not

Currently the enumeration value (literal) which is not assigned by any artifacts is not displayed in the graph x-axis. Need to display all regardless whether any artifact has this value assigned or not.
almost 6 years ago in IBM Engineering - Reporting / Unassigned 3 Future consideration

Allow for the deletion of the last remain line on a PO with a revision created by the MIF using IFace tables.

Currently when POs are revised with the MIF, Maximo does not allow the deletion of the last line. Since PO revisions are handled by the MIF as lines in the incoming revision are compared against current lines, it is assumed that if a PO comes in w...
about 3 years ago in IBM MAS - Manage (Base) / Integration 0 Future consideration