Skip to Main Content
IBM Sustainability Software - Ideas Portal


This portal is to open public enhancement requests against the products and services belonging to IBM Sustainability Software. To view all of your ideas submitted to IBM, create and manage groups of Ideas, or create an idea explicitly set to be either visible by all (public) or visible only to you and IBM (private), use the IBM Unified Ideas Portal (https://ideas.ibm.com).


Shape the future of IBM!

We invite you to shape the future of IBM, including product roadmaps, by submitting ideas that matter to you the most. Here's how it works:

Search existing ideas

Start by searching and reviewing ideas and requests to enhance a product or service. Take a look at ideas others have posted, and add a comment, vote, or subscribe to updates on them if they matter to you. If you can't find what you are looking for,

Post your ideas
  1. Post an idea.

  2. Get feedback from the IBM team and other customers to refine your idea.

  3. Follow the idea through the IBM Ideas process.


Specific links you will want to bookmark for future use

Welcome to the IBM Ideas Portal (https://www.ibm.com/ideas) - Use this site to find out additional information and details about the IBM Ideas process and statuses.

IBM Unified Ideas Portal (https://ideas.ibm.com) - Use this site to view all of your ideas, create new ideas for any IBM product, or search for ideas across all of IBM.

ideasibm@us.ibm.com - Use this email to suggest enhancements to the Ideas process or request help from IBM for submitting your Ideas.

ADD A NEW IDEA

Pinned ideas

PINNED Power BI capability alignment between Desktop vs embedded solution
Requesting Customer: Fraser Property but this would benefit all customers using Envizi Power BI capability Business Impact: The Frasers Property Team have recently explored the use of the embeded PowerBI functionality and have found that there are...
PINNED Enable inventory reservation automatic cron task for specific site
Advantage : Enable the cron for specific site which is necessary. Summary: In Maximo, we have more than 50 Active sites. When we try to enable inventory reservation automatic cron task for specific site, There is no Cron Parameters are available....

All ideas

Showing 2734

MAXADMIN to delete schedules

MAXADMIN users should have the ability to delete schedules and work lists from Graphical Scheduling / Assignment.
almost 7 years ago in IBM MAS - Scheduler 3 Future consideration

DOORS Next doesn't have easily found documentation from the IBM list of products page.

It's incredibly difficult to find the documentation for DOORS Next for the average user. You have to go through ELM to find it. We've been told, after several name changes that Rational DOORS Next Generation (RDNG & DNG) would now be called, "...
over 1 year ago in IBM Engineering - Requirements Management DOORS Next / Documentation 1 Future consideration

Configmap and MongoCfg CR to be automatically updated when mongodb certificate is renew

Mongodb now is manage by cert-manager that can be renew before the mongodb expiry, however when the certificate renew, it will not update the Configmap and MongoCfg CR for Manage
over 1 year ago in IBM MAS - Common Services 1 Future consideration

A value of value property is to be set from the typed proxy port when adding it to a block

When user adds a typed proxy port by interface block to a block, user would like to set the value of value property of the proxy port.
over 3 years ago in IBM Engineering - Systems Design Rhapsody/RMM / Modeling and UI 0 Future consideration

OSLC links should get resolved automatically after selecting the correct GC (Global Configuration) in Rhapsody with RMM

When we open the model in Rhapsody (with RMM), after selecting a GC context, initially all the DNG/RQM links are shown as hyperlinks (unresolved). They are getting resolved upon right clicking on the link and selecting "Resolve". This is not a sho...
about 5 years ago in IBM Engineering - Systems Design Rhapsody/RMM / Rhapsody Client 0 Future consideration

Secondary assignments to space should not count towards the occupancy

Currently IBM TRIRIGA indicates “A person or asset might be associated to only one primary location or space, but might be associated to many secondary locations or spaces.” When IBM TRIRIGA assigns a person to a secondary location, it also adds i...
over 8 years ago in IBM TRIRIGA Space Management 4 Future consideration

The Date and time type of attributes shall be consistent in supporting the behavior seen on the GUI in the export and query functionality

Existing behavior: RTC allows us to display the full Date and time format or just the dates as per the need on the GUI. However, when we query OR group on it, it takes the full date and time format. Expected Behavior: The behavior shall be consist...
over 1 year ago in IBM Engineering - Workflow Management / Planning 1 Future consideration

Setting scope for the RPE document Generation

Description : Currently if you use RPE for report generation in Rhapsody, you would see that the report is generated for the whole model. This RFE calls for possibility to set scope for the RPE reports. The RPE report shall be Generated based on t...
over 3 years ago in IBM Engineering - Systems Design Rhapsody/RMM / Reports 1 Future consideration

Add a "Compare snapshots" feature

With Design Manager web access 5.0.2, when you select a workspace in the Configuration Management page, DM offers features to:- compare with base snapshot- compare with flow target. The same is not possible with snapshots. Performing a compare bet...
over 8 years ago in IBM Engineering - Systems Design Rhapsody/RMM / Web Client 3 Future consideration

Attributes on local components and streams

Attributes on local components and streams requested.
about 5 years ago in IBM Engineering - Foundation/Common Services / Global Configuration Management 4 Future consideration