Skip to Main Content
IBM Sustainability Software - Ideas Portal


This portal is to open public enhancement requests against the products and services belonging to IBM Sustainability Software. To view all of your ideas submitted to IBM, create and manage groups of Ideas, or create an idea explicitly set to be either visible by all (public) or visible only to you and IBM (private), use the IBM Unified Ideas Portal (https://ideas.ibm.com).


Shape the future of IBM!

We invite you to shape the future of IBM, including product roadmaps, by submitting ideas that matter to you the most. Here's how it works:

Search existing ideas

Start by searching and reviewing ideas and requests to enhance a product or service. Take a look at ideas others have posted, and add a comment, vote, or subscribe to updates on them if they matter to you. If you can't find what you are looking for,

Post your ideas
  1. Post an idea.

  2. Get feedback from the IBM team and other customers to refine your idea.

  3. Follow the idea through the IBM Ideas process.


Specific links you will want to bookmark for future use

Welcome to the IBM Ideas Portal (https://www.ibm.com/ideas) - Use this site to find out additional information and details about the IBM Ideas process and statuses.

IBM Unified Ideas Portal (https://ideas.ibm.com) - Use this site to view all of your ideas, create new ideas for any IBM product, or search for ideas across all of IBM.

ideasibm@us.ibm.com - Use this email to suggest enhancements to the Ideas process or request help from IBM for submitting your Ideas.

ADD A NEW IDEA

Pinned ideas

PINNED Enable inventory reservation automatic cron task for specific site
Advantage : Enable the cron for specific site which is necessary. Summary: In Maximo, we have more than 50 Active sites. When we try to enable inventory reservation automatic cron task for specific site, There is no Cron Parameters are available....
PINNED Power BI capability alignment between Desktop vs embedded solution
Requesting Customer: Fraser Property but this would benefit all customers using Envizi Power BI capability Business Impact: The Frasers Property Team have recently explored the use of the embeded PowerBI functionality and have found that there are...

All ideas

Showing 2885

Support for Visual Studio 2019

Rhapsody should support Visual Studio 2019, both as an IDE and a CG environment.
almost 4 years ago in IBM Engineering - Systems Design Rhapsody/RMM / Integrations and APIs 0 Future consideration

GWW - Default Crew Assignment Dates

Graphical Work Week - Crew Assignment dialog has a Start Date and End Date which could be defaulted. Start Date from the beginning of the current displayed work week.End Date from the End Date on the Work List.
almost 4 years ago in IBM MAS - Scheduler 0 Future consideration

GWW - No need for Spanner icon in Description field

In the Graphical Work Week application there is a flattened work list, no hierarchy. The description field shows a bit indented and the spanner icon, perhaps an overhang from code brought from Graphical Assignment. This takes up valuable horizonta...
almost 4 years ago in IBM MAS - Scheduler 0 Future consideration

GWW - Create an assignment for a specific craft

There is no ability to be able to create a new assignment for a particular craft or crew type. You can assign to a Labor or Crew. If you use Create Assignment then this duplicates the current assignment but doesn't allow you to specify a craft or ...
almost 4 years ago in IBM MAS - Scheduler 2 Future consideration

An installed equipment with U/S status is not checked by the BDI

In the current version of MFA 7.6.8.2, the BDI service does not raise an error or warning or alert when an equipment installed on a position in the hierarchy of an aircraft is in out of service status (unserviceable, nor ready or others synonymous).
almost 4 years ago in IBM MAS - Aviation 1 Future consideration

Ability to manually specify End Date and automatically Calculate Start Date of a Project in Graphical Scheduling

If you manage construction projects in Graphical Scheduling, you may have a work order hierarchy with a parent and many levels of children and tasks. I want to specify the end date of the entire project and automatically calculate what date the pr...
almost 4 years ago in IBM MAS - Scheduler 0 Future consideration

Unique Management of Resource ID on Artifacts Previously Removed from Module

Presently, in a configuration managed ERM project area when a user removes an artifact from a module and then later adds the same artifact (same ID) to the same module, a new resource ID is created within the module.This is a problem when multiple...
almost 2 years ago in IBM Engineering - Requirements Management DOORS Next / Feature 0 Future consideration

Allow for inactivation of inventory items regardless of PO status

Currently users are required to close all associated PO's before they can inactivate/obsolete an item. If user wishes to inactivate item the PO can't be received later but this is little to no impact. Also, if all PO's are closed, any items on tho...
almost 2 years ago in IBM MAS - Manage (Base) 1 Future consideration

Required Approvals Precondition to include Resolution of WI

Hello Team, Currently we can configure the "Required Approvals" precondition based on the State of the Work Item (Eg: Closed) and not based on the Resolution (Eg: Solved/Invalid/Duplicate). For example, in scenarios where users want to check for A...
almost 2 years ago in IBM Engineering - Workflow Management / Work Items 1 Future consideration

GitLab RTC connector - preconditions should also work for web hooks

The formerly used Git/RTC Plugin used so called "pre and post commit hooks" based on python code which needed to be configured on the GitLab host itself. The advantage on this solution is that preconditions on EWM side can be configured to work. E...
almost 4 years ago in IBM Engineering - Workflow Management / Integrations 6 Future consideration