Skip to Main Content
IBM Sustainability Software - Ideas Portal


This portal is to open public enhancement requests against the products and services belonging to IBM Sustainability Software. To view all of your ideas submitted to IBM, create and manage groups of Ideas, or create an idea explicitly set to be either visible by all (public) or visible only to you and IBM (private), use the IBM Unified Ideas Portal (https://ideas.ibm.com).


Shape the future of IBM!

We invite you to shape the future of IBM, including product roadmaps, by submitting ideas that matter to you the most. Here's how it works:

Search existing ideas

Start by searching and reviewing ideas and requests to enhance a product or service. Take a look at ideas others have posted, and add a comment, vote, or subscribe to updates on them if they matter to you. If you can't find what you are looking for,

Post your ideas
  1. Post an idea.

  2. Get feedback from the IBM team and other customers to refine your idea.

  3. Follow the idea through the IBM Ideas process.


Specific links you will want to bookmark for future use

Welcome to the IBM Ideas Portal (https://www.ibm.com/ideas) - Use this site to find out additional information and details about the IBM Ideas process and statuses.

IBM Unified Ideas Portal (https://ideas.ibm.com) - Use this site to view all of your ideas, create new ideas for any IBM product, or search for ideas across all of IBM.

ideasibm@us.ibm.com - Use this email to suggest enhancements to the Ideas process or request help from IBM for submitting your Ideas.

ADD A NEW IDEA

Pinned ideas

PINNED Enable inventory reservation automatic cron task for specific site
Advantage : Enable the cron for specific site which is necessary. Summary: In Maximo, we have more than 50 Active sites. When we try to enable inventory reservation automatic cron task for specific site, There is no Cron Parameters are available....
PINNED Power BI capability alignment between Desktop vs embedded solution
Requesting Customer: Fraser Property but this would benefit all customers using Envizi Power BI capability Business Impact: The Frasers Property Team have recently explored the use of the embeded PowerBI functionality and have found that there are...

All ideas

Showing 5644

Ability to print the pdf copy of the completed Inspection form

Ability to generate PDF report of the Inspection form and results which can be attached to the Work Order as a linked document.Would like to have the same look and feel like the inspection form, also would like to trigger the pdf report from the W...
about 3 years ago in IBM MAS - Manage (Base) 6 Future consideration

Force user to set a new password, triggered by customization

Because of company mailing policy, the [Reset Password] button does not work, and we solve password reset with customization tools. However the newly set password - with addUser (szDoorsName, szPassword, ""); OR u.password = szPassword; on the fir...

Exporting BIRT Reports to Excel .xlsx format

Currently BIRT report exports only to older .xls format and most of the Federal Clients have upgrade to Microsoft 365 and blocked users from opening older version of Excel spreadsheets. This is causing users to open Exported BIRT reports in Excel ...
almost 2 years ago in IBM TRIRIGA Reporting 2 Planned for future release

Undo (Crtl + z) last operation by client

While editing requirements or even doing more complex operations like multi attribute editing you might find out after the last edit, that it wasn't a good idea. Instead of simply using Crtl+Z like in e.g. MS Office Products or Mural or... you wou...
about 1 year ago in IBM Engineering - Requirements Management DOORS Next / Feature 0 Future consideration

Allow custom coloring of the entire Quick Planner card

In the EWM native planning feature, a Kanban plan view allows a user to configure colors for the kanban cards. In QuickPlanner, you can add colored tags, but there is no way to set the whole card to a certain color based on user defined conditions...
9 months ago in IBM Engineering - Workflow Management / Planning 2 Future consideration

Ability to block automated creation of the Accounts

When we are loading the transactional data using the Universal Connector, the Accounts are created automatically if they didn't exist prior. We would like to be able to block this behaviour, because we would like to be in full control of the Accou...
9 months ago in IBM Envizi - ESG Suite / Data Connectors & Integrations 2 Not under consideration

Add ability to track ISO certifications

We track location ratings such as LEED and Energy Star and would like to track ISO certifications by location
about 1 month ago in IBM Envizi - ESG Suite / Building Ratings & Benchmarks 0 Under review

All email link need to redirect to GC contexte rather than local stream

All email send by QM (and I guess RM, but our today issue is related to QM) need consistency in link used. Exemple : After declaring a Formal review , user receive an email ("New Review")=> this first email link to a GC stream Next, user receiv...
2 months ago in IBM Engineering - Test Management / Email Notification 0 Future consideration

in modules prevent base artifact linking via project admin setting

In the system engineering all customers working in DNG with in the module mode. The default requirement engineer works inside a module and is not aware of the background settings in DNG, eg the artifacts are stored in a module folder and there is ...
over 1 year ago in IBM Engineering - Requirements Management DOORS Next / Usability 2 Future consideration

Queue SMTP Emails when SMTP Server is Unavailable

There are various scenarios in Maximo where email is sent explicitly from the various MXServer.sendEmail() methods. For example, the PM WOGEN cron task. If the email fails to send to the SMTP server (such as the SMTP server is down) it's gone fore...
over 3 years ago in IBM MAS - Manage (Base) 2 Planned for future release