Skip to Main Content
IBM Sustainability Software - Ideas Portal


This portal is to open public enhancement requests against the products and services belonging to IBM Sustainability Software. To view all of your ideas submitted to IBM, create and manage groups of Ideas, or create an idea explicitly set to be either visible by all (public) or visible only to you and IBM (private), use the IBM Unified Ideas Portal (https://ideas.ibm.com).


Shape the future of IBM!

We invite you to shape the future of IBM, including product roadmaps, by submitting ideas that matter to you the most. Here's how it works:

Search existing ideas

Start by searching and reviewing ideas and requests to enhance a product or service. Take a look at ideas others have posted, and add a comment, vote, or subscribe to updates on them if they matter to you. If you can't find what you are looking for,

Post your ideas
  1. Post an idea.

  2. Get feedback from the IBM team and other customers to refine your idea.

  3. Follow the idea through the IBM Ideas process.


Specific links you will want to bookmark for future use

Welcome to the IBM Ideas Portal (https://www.ibm.com/ideas) - Use this site to find out additional information and details about the IBM Ideas process and statuses.

IBM Unified Ideas Portal (https://ideas.ibm.com) - Use this site to view all of your ideas, create new ideas for any IBM product, or search for ideas across all of IBM.

ideasibm@us.ibm.com - Use this email to suggest enhancements to the Ideas process or request help from IBM for submitting your Ideas.

ADD A NEW IDEA

Pinned ideas

PINNED Enable inventory reservation automatic cron task for specific site
Advantage : Enable the cron for specific site which is necessary. Summary: In Maximo, we have more than 50 Active sites. When we try to enable inventory reservation automatic cron task for specific site, There is no Cron Parameters are available....

IBM MAS - Manage (Base)

Showing 940 of 5644

Improvement: Bar Charts on Start centre to Drill on Bar and Open Results in Application

On Start Centres when you go to a Portlet. You can change your view to “Set Chart Options” So for example. On the Team Work Tab. Go to “Work Scheduled and Assigned” and Go to “Set Chart Options” And Display the Chart. This then gives you a bar Cha...
over 1 year ago in IBM MAS - Manage (Base) 1 Future consideration

Remove Non-breaking spaces from Excel downloads for true accuracy

Whenever the download to Excel option is used in Maximo the resulting Excel files contains NON-BREAKING SPACE(U+00A0) instead of the value in the database which is SPACE(U+0020). This means that the values in Excel are not accurate and cause probl...
over 1 year ago in IBM MAS - Manage (Base) / Asset/Work Management 1 Not under consideration

Dynamic Job Plans should allow to enter job plan duration that is less than 1 minute.

There are some inspections that last only few seconds but overall it takes minutes to complete them all because there is hundreds of them in a batch. If they get one minute each then total time is much longer than real inspection time. For example...
over 1 year ago in IBM MAS - Manage (Base) / Asset/Work Management 1 Not under consideration

Requesting New Supervisor Report; similar to CPTOOL replacement. See details.

A report needs to be created for condition monitoring so sups can pull and review the reads entered. With the flexibility of being able to view by line, date, WO, person without having to go to each point directly. Something similar to the "CPTOOL...
10 months ago in IBM MAS - Manage (Base) 1 Not under consideration

Ability to assign multiple WO's when results are greater than 200 rows.

In SoCal Gas Maximo Classic, users cannot select multiple work orders if their search results exceed 200 work orders. This is a request to remove that limitation and allow end user to select as many work orders as desired.
10 months ago in IBM MAS - Manage (Base) 2 Functionality already exists

Possiblity of report Pagination in newer version of MAS

Possibility of report Pagination in newer version of MAS so that during export of report, it should be clearly understandable.
10 months ago in IBM MAS - Manage (Base) 1 Needs more information

Crew Type Standard Hourly Rate automatically updating upon Craft Rate update

Hourly Rate in Crew Type is not getting calculated properly after changing the Standard rate in Individual Craft Record. Ideally Maximo should calculate that once the standard rate has been changed in craft app. Based your answer, you think that t...
10 months ago in IBM MAS - Manage (Base) 0 Needs more information

Support network drive and non-HTTP URLs for large (>500MB) attachments

Attachments only support URLS for HTTP and HTTPS links only. Some files are so large(i.e. video files) that it is unworkable to upload/download by users. It takes so long to upload the connection times out. It takes equally long to download the fi...
over 1 year ago in IBM MAS - Manage (Base) / System Admin Config/Security 1 Not under consideration

Need workcenter guest login back in MAS

We need guest login back in MAS (similar to Workcenter guest login in EAM 7.6.1.3. This will be used so non-maximo users can login and create a Service Request ticket.
10 months ago in IBM MAS - Manage (Base) 0 Planned for future release

The translation of "asset" in Japanese

The organization that defines the guidelines for asset management in Japan has changed the translation of Asset from "資産" to "アセット". https://webdesk.jsa.or.jp/books/W11M0090/?bunsyo_id=JIS%20Q%2055002:2021 I would like to update the translation of...
10 months ago in IBM MAS - Manage (Base) / Asset/Work Management 0 Future consideration