Skip to Main Content
IBM Sustainability Software - Ideas Portal


This portal is to open public enhancement requests against the products and services belonging to IBM Sustainability Software. To view all of your ideas submitted to IBM, create and manage groups of Ideas, or create an idea explicitly set to be either visible by all (public) or visible only to you and IBM (private), use the IBM Unified Ideas Portal (https://ideas.ibm.com).


Shape the future of IBM!

We invite you to shape the future of IBM, including product roadmaps, by submitting ideas that matter to you the most. Here's how it works:

Search existing ideas

Start by searching and reviewing ideas and requests to enhance a product or service. Take a look at ideas others have posted, and add a comment, vote, or subscribe to updates on them if they matter to you. If you can't find what you are looking for,

Post your ideas
  1. Post an idea.

  2. Get feedback from the IBM team and other customers to refine your idea.

  3. Follow the idea through the IBM Ideas process.


Specific links you will want to bookmark for future use

Welcome to the IBM Ideas Portal (https://www.ibm.com/ideas) - Use this site to find out additional information and details about the IBM Ideas process and statuses.

IBM Unified Ideas Portal (https://ideas.ibm.com) - Use this site to view all of your ideas, create new ideas for any IBM product, or search for ideas across all of IBM.

ideasibm@us.ibm.com - Use this email to suggest enhancements to the Ideas process or request help from IBM for submitting your Ideas.

ADD A NEW IDEA

All ideas

Showing 2831

Allow for the deletion of the last remain line on a PO with a revision created by the MIF using IFace tables.

Currently when POs are revised with the MIF, Maximo does not allow the deletion of the last line. Since PO revisions are handled by the MIF as lines in the incoming revision are compared against current lines, it is assumed that if a PO comes in w...
about 3 years ago in IBM MAS - Manage (Base) / Integration 0 Future consideration

Enhancement request for proper documentation Model Synchronization profile

Documentation Model Synchronization profile:This is a good feature to have in Rhapsody At present there is only one short documentation in in the below link :https://www.ibm.com/support/knowledgecenter/hr/SSB2MU_8.4.0/com.ibm.rhp.uml.diagrams.doc/...
over 4 years ago in IBM Engineering - Systems Design Rhapsody/RMM / Documentation 1 Future consideration

Enhancement request for Operations in an interface should be 'virtual' by default

while adding function to interface class, all functions are marked as abstract not virtual.
over 4 years ago in IBM Engineering - Systems Design Rhapsody/RMM / Modeling and UI 1 Future consideration

Discard auto fill for asset field when newly creating PM work order against location

We are using MAS 8.7 and currently for any Work Order generated from PM, if the PM has only Location associated and that Location has single Asset then that Asset is copied to the Work Order. If the PM has multiple Assets within hierarchy then Par...
over 1 year ago in IBM MAS - Manage (Base) / Asset/Work Management 0 Future consideration

Add the ability to load multiple aircraft maintenance program in a single file

The Initialize Maintenance Program action in Aircraft application is used to load a file containing maintenance program data for a single aircraft. Users will benefit from an action that alows them to load a single file that includes maintenance p...
over 4 years ago in IBM MAS - Aviation 1 Future consideration

Support Cross Business Application SSO(forceAuthn =false in liberty option) using JAS with SAML integration.

This is RFE for Jazz FoundationCurrently CLM Products do not support Cross Business Application SSO(forceAuthn =false) when JAS integrates SAML as IDP/SP. It is because the below documentation does not mention forceAuthn=false so CLM Products supp...
over 6 years ago in IBM Engineering - Foundation/Common Services / Unassigned 1 Future consideration

Cannot create Links to Requirement Artifacts from external applications

Within DNG, we cannot create Links from WF/RMM/TM to Requirement Artifacts if1. the current local Configuration is a Baseline2. the current Stream requires a Change Set while we haven't created/selected one Workaround is to switch to WF, RMM, TM a...
over 1 year ago in IBM Engineering - Requirements Management DOORS Next / Integrations 0 Future consideration

ReqIF Import shall take Artifact States into account

In DNG, when performing a ReqIF import, the workflow states are currently not taken into account, What's more, the initial state of an artifact is not assigned for newly created artifacts. Requests: DNG shall assign the initial states of newly cre...
over 1 year ago in IBM Engineering - Requirements Management DOORS Next / Integrations 0 Future consideration

Create centralised process to create BINNUM for inventory balances

It would be nice to have a central repository to create and connect BINNUM to storerooms. In most warehouses there is a fixed physicaly rack system so having the BINNUM set up against the storeroom ensures uniformity of structure. If the BINNUM ob...
over 1 year ago in IBM MAS - Manage (Base) 1 Future consideration

When using the Print Service with the Related Records tool enabled to show multiple pins on the map, the PDF that is printed should show all the pins

As a use case, I may create a work order with 25 line segments in the multi asset location CI table of the work order because I am planning to maintain vegetation on all spans as part of a work package. Each of these assets are linked with ESRI fe...
over 1 year ago in IBM MAS - Spatial / Spatial 0 Future consideration