Skip to Main Content
IBM Sustainability Software - Ideas Portal


This portal is to open public enhancement requests against the products and services belonging to IBM Sustainability Software. To view all of your ideas submitted to IBM, create and manage groups of Ideas, or create an idea explicitly set to be either visible by all (public) or visible only to you and IBM (private), use the IBM Unified Ideas Portal (https://ideas.ibm.com).


Shape the future of IBM!

We invite you to shape the future of IBM, including product roadmaps, by submitting ideas that matter to you the most. Here's how it works:

Search existing ideas

Start by searching and reviewing ideas and requests to enhance a product or service. Take a look at ideas others have posted, and add a comment, vote, or subscribe to updates on them if they matter to you. If you can't find what you are looking for,

Post your ideas
  1. Post an idea.

  2. Get feedback from the IBM team and other customers to refine your idea.

  3. Follow the idea through the IBM Ideas process.


Specific links you will want to bookmark for future use

Welcome to the IBM Ideas Portal (https://www.ibm.com/ideas) - Use this site to find out additional information and details about the IBM Ideas process and statuses.

IBM Unified Ideas Portal (https://ideas.ibm.com) - Use this site to view all of your ideas, create new ideas for any IBM product, or search for ideas across all of IBM.

ideasibm@us.ibm.com - Use this email to suggest enhancements to the Ideas process or request help from IBM for submitting your Ideas.

ADD A NEW IDEA

All ideas

Showing 5796 of 5796

Partner logo on SRM module

We currently have our own logo on the whole of Envizi, but when we go into SRM it shows the IBM Envizi logo. This gives customers a poor and disjointed experience. This will benefit the customer experience and ensure a smooth UX and UI
12 months ago in IBM Envizi - ESG Suite / ESG Reporting Frameworks 0 Future consideration

When user click the inspection result link in the work order, it is expected the inspection form is opened in a new tab but not overwrite the current work order one

Since there is no "Easy" way for user back to the work order after completed the inspection form. Pop up the inspection form in a new tab will be easier for user to view work order and inspection form in parallel .
9 months ago in IBM MAS - Manage (Base) / Asset/Work Management 0 Planned for future release

OSLC links in ETM to DNG shall be gc configuration context sensitive

Hello dear IBM Team, this idea originates from my support ticket TS016025963 . My request is, that links between an ETM artifact and a DNG artifact are not visible in the ETM GUI if the user is not looking at the data within the proper configurati...
5 months ago in IBM Engineering - Test Management / Configuration Manager 2 Not under consideration

Adding additional variance comparison periods to the Power Reports as standard

Currently you are only able to compare the current year with the prior year. It would also be useful to us and I am sure other end users of the Envizi system to be able to compare this quarter with the current quarter and month on month comparisons.
5 months ago in IBM Envizi - ESG Suite / Base Platform 2 Future consideration

Navigate between workorders without back to list

The ideia is to develop some way to navigate between workorder records click on a sign to move to next workorder in the sequence or swiping between each other inside the record.
almost 2 years ago in IBM MAS - Mobile 0 Future consideration

Extended Drilldown - Show Path to Top - loses focus on current selected Location

Extended Drilldown does not work in the same fashion as the standard drilldown when using "Show Path to Top". Focus is lost from the original location and all paths are opened so that the user can no longer identify the location currently selected...
over 3 years ago in IBM MAS - Manage (Base) 2 Future consideration

Please add the function to check the list of users whose license is in the warning state.

If the license set for a user is not appropriate, a warning will appear on the user's detail screen in MAS - Suite Administration - Users, stating "License upgrade required". If there are many registered users, it is not practical to open each use...
over 2 years ago in IBM MAS - Common Services 1 Planned for future release

Make the common permission properties editable in 1 location

User Permission change to Attributes at the Project Level for Multi-Component Projects User defined permissions to artifacts and attributes are managed at the Project scope till Configuration Enabled then at the Stream scope per component. When pr...
about 1 month ago in IBM Engineering - Requirements Management DOORS Next / Usability 0 Future consideration

Functional Safety Baseline Integrity Assurance

ELM could be used in support of Functional Safety Development Applications but only after qualifying the system and its Enterprise usage to 3rd Party Certification Body. As this comes at great expense to the ELM Customer and having just received t...
about 1 month ago in IBM Engineering - Requirements Management DOORS Next / Usability 3 Future consideration

Integrating BIM with Maximo

We have a solution for one of our projects to integrate Maximo with BIM model. So, the normal way is to use Revit Model with COBie sheet to achieve custom implementation but unfortunately our client doesn't need to work with COBie sheet. Why we do...
about 1 month ago in IBM MAS - Manage (Base) 0 Under review