Skip to Main Content
IBM Sustainability Software - Ideas Portal


This portal is to open public enhancement requests against the products and services belonging to IBM Sustainability Software. To view all of your ideas submitted to IBM, create and manage groups of Ideas, or create an idea explicitly set to be either visible by all (public) or visible only to you and IBM (private), use the IBM Unified Ideas Portal (https://ideas.ibm.com).


Shape the future of IBM!

We invite you to shape the future of IBM, including product roadmaps, by submitting ideas that matter to you the most. Here's how it works:

Search existing ideas

Start by searching and reviewing ideas and requests to enhance a product or service. Take a look at ideas others have posted, and add a comment, vote, or subscribe to updates on them if they matter to you. If you can't find what you are looking for,

Post your ideas
  1. Post an idea.

  2. Get feedback from the IBM team and other customers to refine your idea.

  3. Follow the idea through the IBM Ideas process.


Specific links you will want to bookmark for future use

Welcome to the IBM Ideas Portal (https://www.ibm.com/ideas) - Use this site to find out additional information and details about the IBM Ideas process and statuses.

IBM Unified Ideas Portal (https://ideas.ibm.com) - Use this site to view all of your ideas, create new ideas for any IBM product, or search for ideas across all of IBM.

ideasibm@us.ibm.com - Use this email to suggest enhancements to the Ideas process or request help from IBM for submitting your Ideas.

ADD A NEW IDEA

My ideas: IBM Engineering - Requirements Management DOORS Next

Showing 932 of 5833

Bulk edit of more than 200 DNG artifacts

DNG does not allow to select more than 200 DNG artifacts at a time and edit them.Request: Make number configurable.
over 3 years ago in IBM Engineering - Requirements Management DOORS Next / Usability 3 Not under consideration

Change format of automated emails

The automated emails contain the artifact name and any comment or message fields. These fields may have export control information in our case and because this is a SaaS application, we have a concern that the email may be routed through 3rd party...
9 months ago in IBM Engineering - Requirements Management DOORS Next / Feature 0 Future consideration

Support all DNG attributs and relations

Important parts of DNG information stucture is missing when trying to make reports in Report Builder LQE - Tags (Shared) - Artifact Format - Artifact Type (There is a Type attribut with garbage) - Modified by - A link from Base artifact to all Mod...
9 months ago in IBM Engineering - Requirements Management DOORS Next 3 Future consideration

Provide option to add image caption

There should be an option to add image caption. We are embedding multiple images (wrapper resources/artifacts) within a requirement (test artifact). While exporting to Word or PDF, there is no way to add the figure captions automatically based on ...
2 months ago in IBM Engineering - Requirements Management DOORS Next / Feature 0 Future consideration

Resizing images in DOORS Next

Enhancement request: Allow possibility of resizing an image inserted in an artifact. Currently the picture can not be resized neither in the module view, when editing the artifact, nor when opening the artifact for editing.
over 1 year ago in IBM Engineering - Requirements Management DOORS Next / Feature 0 Future consideration

[ERM] Link ID outside GC Context display incorrectly

As Requirement Manager, I am facing the following issue: Links that are created in a specific global configuration are displayed correctly in the active link configuration but incorrectly in the inactive link configuration. Further, edit operation...
2 months ago in IBM Engineering - Requirements Management DOORS Next / Usability 0 Future consideration

Use Date/Time formats when exporting Date/Time attributes in Excel

When a user export a view containing user-defined attributes of type Date (or Time or Date-Time), these attributes are not recognized as a date format in Excel, but as plain text. If you export the Excel table from Report Builder, then the Date at...
10 months ago in IBM Engineering - Requirements Management DOORS Next / Feature 2 Future consideration

DNG Link to EWM File object

I want to be able to link to files in the repository instead of work items in the DNG link settings (eg Effects Requirement / Affected By). Please see attached file. This is good for user DNG+EWM who want asociate with one requirement and one file.
over 2 years ago in IBM Engineering - Requirements Management DOORS Next / Feature 1 Future consideration

When comparing configurations in DOORS Next provide a way for the user to specifiy attributes to ignore. Also need an option to ignore white space.

It will be very helpful to be able to ignore attribures such as Last Modified and Status as well as ignoring white space differences.
10 months ago in IBM Engineering - Requirements Management DOORS Next / Usability 0 Future consideration

Our Use Case is to link from a Software Requirement written in Doors next to a Rhapsody Element (outgoing link: traces).

According A-Spice the linking should be as following:System Requirement <-- System Design <-- Software Requirement. Our Requirements are written down as artifacts in Doors Next. Our Design is modeled in Rhapsody. So there is a need to link a...
over 1 year ago in IBM Engineering - Requirements Management DOORS Next / Feature 1 Future consideration