Skip to Main Content
IBM Sustainability Software - Ideas Portal


This portal is to open public enhancement requests against the products and services belonging to IBM Sustainability Software. To view all of your ideas submitted to IBM, create and manage groups of Ideas, or create an idea explicitly set to be either visible by all (public) or visible only to you and IBM (private), use the IBM Unified Ideas Portal (https://ideas.ibm.com).


Shape the future of IBM!

We invite you to shape the future of IBM, including product roadmaps, by submitting ideas that matter to you the most. Here's how it works:

Search existing ideas

Start by searching and reviewing ideas and requests to enhance a product or service. Take a look at ideas others have posted, and add a comment, vote, or subscribe to updates on them if they matter to you. If you can't find what you are looking for,

Post your ideas
  1. Post an idea.

  2. Get feedback from the IBM team and other customers to refine your idea.

  3. Follow the idea through the IBM Ideas process.


Specific links you will want to bookmark for future use

Welcome to the IBM Ideas Portal (https://www.ibm.com/ideas) - Use this site to find out additional information and details about the IBM Ideas process and statuses.

IBM Unified Ideas Portal (https://ideas.ibm.com) - Use this site to view all of your ideas, create new ideas for any IBM product, or search for ideas across all of IBM.

ideasibm@us.ibm.com - Use this email to suggest enhancements to the Ideas process or request help from IBM for submitting your Ideas.

ADD A NEW IDEA

My ideas

Showing 6070

A column which shows the end date of an iteration in a plan is needed

A discipline should plan their Realize WIs (e.g. PADITs) according to the need of the parent ChM or PADIT Item (e.g. Feature Request)For the planning, the discipline team (e.g. SW MMI) uses a plan (e.g. Sprint Backlog). In this plan theIteration n...
about 4 years ago in IBM Engineering - Workflow Management / Planning 4 Future consideration

Resolve E-mail listener conflict Service Provider and core Maximo

As discussed in case TS003772549 there is a conflict between the Service Provider add on and core Maximo/ICD functionality which occurs in the e-mail listener process. This has also been registered under APAR no. IJ28630. Switching on the standard...
about 4 years ago in IBM MAS - Service Provider 1 Future consideration

Package binary fields in reports exports

When exporting a report in TRIRIGA if you have a binary field with a file attached in a record, it wont be included in the report output, when exporting you are only able to see what it looks like an id but not the actual content, it would be grea...
over 1 year ago in IBM TRIRIGA Reporting 3 Not under consideration

Allow guest user to select Site ID to provide downstream filtering for Assets and Locations on Service Request

Operations folks and vendors should be able to enter a service requests in Maximo without having to have a log in id. The first question they should be asked is what site the request is for so that way when they select Location/Asset, not every Lo...
over 2 years ago in IBM MAS - Mobile 0 Future consideration

Provide ability to define global settings in the graphite designer e.g. table row type = compact

the application will allow administrators to define a table's row type as compact. adminstrators may want to set this globally across all their apps. currently administrators have to edit each of the tables in the applications
over 2 years ago in IBM MAS - Manage (Base) / Asset/Work Management 0 Future consideration

Update Change Set Access

Change Sets can be modified by anyone in DNG. Typically, this is controlled in that only by sharing the URL to the Change Set can someone obtain access to a Change Set. However, if you link a Change Set to a RTC Work Ticket, any user can access th...
over 5 years ago in IBM Engineering - Requirements Management DOORS Next / Feature 2 Not under consideration

DNG String Attribute Edition Mode - Default Unselect the content

When you edit a string attribute (not "Primary Text"), if this one contents a text, the value is entire selected by default : you must click one time to unselect the text you must click a send time to go a the end of the text After 2 clicks, you c...
over 2 years ago in IBM Engineering - Requirements Management DOORS Next / Feature 1 Future consideration

To improve performnace of RQM OSLC links in RMM web with GC context

Links created on the QM side will appear in RMM after 3 - 4 minutes. After many time refreshing and opening the element in the new tab links are visible. Improve performance of RQM OSLC links in RMM web are needed.
over 2 years ago in IBM Engineering - Systems Design Rhapsody/RMM / Server 7 Not under consideration

Extend Foundation so it supports arbitrary/customizable links, not just the predefined OSLC ones

IBM DOORS Next IBM RMM IBM ETM IBM EWM When we integrate external tool applications with ELM, we will have the need for additional OSLC link types which shall be customizable and extendable. Examples to trace SW artefacts to artefacts in Jazz: Sof...
over 1 year ago in IBM Engineering - Foundation/Common Services / Integrations 0 Future consideration

User Documentation of CustomView

The User Documentation of CustomView currently does not cover some important facts: When multiple CustomViews are active , the formatting of diagrams depends on the order in which they are processed by Rhapsody; (i.e.) a model element will be form...
over 1 year ago in IBM Engineering - Systems Design Rhapsody/RMM / Rhapsody Client 1 Planned for future release