Skip to Main Content
IBM Sustainability Software - Ideas Portal


This portal is to open public enhancement requests against the products and services belonging to IBM Sustainability Software. To view all of your ideas submitted to IBM, create and manage groups of Ideas, or create an idea explicitly set to be either visible by all (public) or visible only to you and IBM (private), use the IBM Unified Ideas Portal (https://ideas.ibm.com).


Shape the future of IBM!

We invite you to shape the future of IBM, including product roadmaps, by submitting ideas that matter to you the most. Here's how it works:

Search existing ideas

Start by searching and reviewing ideas and requests to enhance a product or service. Take a look at ideas others have posted, and add a comment, vote, or subscribe to updates on them if they matter to you. If you can't find what you are looking for,

Post your ideas
  1. Post an idea.

  2. Get feedback from the IBM team and other customers to refine your idea.

  3. Follow the idea through the IBM Ideas process.


Specific links you will want to bookmark for future use

Welcome to the IBM Ideas Portal (https://www.ibm.com/ideas) - Use this site to find out additional information and details about the IBM Ideas process and statuses.

IBM Unified Ideas Portal (https://ideas.ibm.com) - Use this site to view all of your ideas, create new ideas for any IBM product, or search for ideas across all of IBM.

ideasibm@us.ibm.com - Use this email to suggest enhancements to the Ideas process or request help from IBM for submitting your Ideas.

ADD A NEW IDEA

My votes

Showing 3019

Consider Resource / Crew Assignment when control the Resource load and Availability in Graphical Scheduling

How it works today During the Planning/Scheduling phase, Graphical Scheduling is used to decide whether work orders can be executed based on resource and crew availability. The Graphical Scheduling calculates availability by dealing with Calendar/...
10 months ago in IBM MAS - Scheduler 1 Future consideration

Introduce an organization-level setting to consolidate all material needs into a single inventory usage document for work orders with multiple tasks

Current Behavior: When creating a work order with tasks under the Plans tab and associating materials with these tasks, the system currently handles inventory usage as follows: If materials are not linked to any task, all material needs are consol...
3 months ago in IBM MAS - Manage (Base) / Asset/Work Management 0 Future consideration

Include a Keyword in an other Keyword

In RQM (ETM) 7.0.3, there isn't the ability to have a keyword put inside another keyword. Is this functionality now possible on a newer release or planned for a future release? It will be very useful.
3 months ago in IBM Engineering - Test Management / Test Execution 0 Future consideration

Adding Field that requires no answer in Question list of Inspections

It can be handy to add a comment between questions that needs no answer, this is not possble at the moment.
7 months ago in IBM MAS - Manage (Base) / Asset/Work Management 0 Future consideration

Suggest to the Rhapsody user that they should update the unit if they attempt to lock a unit that is not up to date

When a user locks a unit, Rhapsody is not forcing (or suggesting) the user to first update their model before locking. Many people are locking without updating the model, and this leads to conflicts because they are making updates on an older vers...
over 1 year ago in IBM Engineering - Systems Design Rhapsody/RMM / Modeling and UI 1 Future consideration

Show a warning when requests to DNG exceeds a certain threshold.

Rhapsody should show a performance warning in the UI when loading requirements from DNG. This warning should alert the user to the problem and advise them to check with the DNG administrator.
4 months ago in IBM Engineering - Systems Design Rhapsody/RMM / Rhapsody Client 2 Future consideration

Enable possibility to send e-mails from other domains (use case: external users

Use Case: In our Maximo environment we collaborate with external users (suppliers, customers). However, the current setup does not allow those external users to send outbound e-mails from Maximo (create communication, scheduled reports). Those ext...
8 months ago in IBM MAS - Manage (Base) / System Admin Config/Security 1 Future consideration

Need to be able to set Logger configuration back to default

In the Logger configuration we can change the logging level of each logger. After having done the debug, it would useful to reset all the changes back the default/original setting. Should have a button on the top to reset.
9 months ago in IBM Engineering - Requirements Management DOORS Next / Administration 0 Future consideration

Inventory Issues and Transfers --> Ability to jump to work order when issuing from the issues RBA.

Currently there is no way to search for or "select" a WO -- user has to know the value
about 1 month ago in IBM MAS - Manage (Base) / Asset/Work Management 0 Future consideration

PO to NOT default to STD but to be blank and required so user has to choose PO type

Purchase Order Requests --> Would like purchase order type on a manually created PO to NOT default to STD but to be blank and required so user has to choose PO type based on the need of the request.
about 1 month ago in IBM MAS - Manage (Base) / Asset/Work Management 0 Future consideration