Skip to Main Content
IBM Sustainability Software - Ideas Portal


This portal is to open public enhancement requests against the products and services belonging to IBM Sustainability Software. To view all of your ideas submitted to IBM, create and manage groups of Ideas, or create an idea explicitly set to be either visible by all (public) or visible only to you and IBM (private), use the IBM Unified Ideas Portal (https://ideas.ibm.com).


Shape the future of IBM!

We invite you to shape the future of IBM, including product roadmaps, by submitting ideas that matter to you the most. Here's how it works:

Search existing ideas

Start by searching and reviewing ideas and requests to enhance a product or service. Take a look at ideas others have posted, and add a comment, vote, or subscribe to updates on them if they matter to you. If you can't find what you are looking for,

Post your ideas
  1. Post an idea.

  2. Get feedback from the IBM team and other customers to refine your idea.

  3. Follow the idea through the IBM Ideas process.


Specific links you will want to bookmark for future use

Welcome to the IBM Ideas Portal (https://www.ibm.com/ideas) - Use this site to find out additional information and details about the IBM Ideas process and statuses.

IBM Unified Ideas Portal (https://ideas.ibm.com) - Use this site to view all of your ideas, create new ideas for any IBM product, or search for ideas across all of IBM.

ideasibm@us.ibm.com - Use this email to suggest enhancements to the Ideas process or request help from IBM for submitting your Ideas.

ADD A NEW IDEA

Pinned ideas

PINNED Enable inventory reservation automatic cron task for specific site
Advantage : Enable the cron for specific site which is necessary. Summary: In Maximo, we have more than 50 Active sites. When we try to enable inventory reservation automatic cron task for specific site, There is no Cron Parameters are available....
PINNED Power BI capability alignment between Desktop vs embedded solution
Requesting Customer: Fraser Property but this would benefit all customers using Envizi Power BI capability Business Impact: The Frasers Property Team have recently explored the use of the embeded PowerBI functionality and have found that there are...

All ideas

Showing 5799 of 5799

View and Complete Assignments on Work Order

Some organizations need to assign multiple resources to complete a WO. They will create assignments for each labor or crew and that labor or crew needs to be able to complete their assignment without completing the overall task/WO. In order to do ...
about 2 years ago in IBM MAS - Mobile 1 Future consideration

Improve usability / messaging for users when attempting to "save" personal GC with "Missing Configuration" items.

Would like to see a usability improvement for users taking an action that would result in saving their personal GC with "Missing Configuration" items, which the system prevents. Currently, it is not very clear that this situation is why the system...
5 months ago in IBM Engineering - Foundation/Common Services / Global Configuration Management 3 Not under consideration

Unlock 'Aircraft' and 'Equipment or Aircraft' field in Work Order Tracking for unscheduled maintenance.

When manually generating a work order (within the Work Order Tracking app) the 'Aircraft' and 'Equipment or Aircraft' fields are read-only. This makes it difficult to create ad-hoc work orders for unscheduled maintenance. Currently these fields ar...
5 months ago in IBM MAS - Aviation 1 Is a defect

ETM REST API to list available fields for test artifacts

There should be a REST API to list available fields for each test artifact. Here is the customers description from a support case " I need an Rest API which gives me the list of fields available in any test artifact, i.e., test plan having title, ...
5 months ago in IBM Engineering - Test Management / Unassigned 1 Future consideration

Unique handling of links in filter 'Link changes' during delivery and comparison

This is related to TS016372244 and TS016488144. Feedback from IBM Development Team, and it is working as designed: "As we know, when a user creates an incoming link in Component A from Component B, that link is stored in Component B. In my tests, ...
5 months ago in IBM Engineering - Requirements Management DOORS Next / Usability 0 Future consideration

provision to Hide/Show Data in DNG based on access control

provision to Hide/Show Data in DNG based on access control
about 2 years ago in IBM Engineering - Requirements Management DOORS Next / Administration 0 Future consideration

DNG ReqIF Import shall import SPEC-OBJECTS with the same ReqIF ID as reused artefacts (as the same Base Artefact)

Description DOORS Next has a concept for artefact reuse. A "Base Artefact" can be reused in different contexts, meaning for example in different modules or in different places in the same module. These artefacts are still all the same artefact, me...
about 2 years ago in IBM Engineering - Requirements Management DOORS Next / Feature 1 Future consideration

ETM Excel Importer allow DNG Links to propagate from Test Script to Test Case

We would like the ETM Excel Importer to support DNG requirements links propagating from the Test Script to the Test Case. If a team creates a Test Script manually in ETM and links those steps to a requirement in DNG, the result is that the link pr...
over 2 years ago in IBM Engineering - Test Management / Excel & Word Import 0 Future consideration

OSLC allow setvaluemode header with BULK

When using POST oslc/os/someOS X-method-override: BULK allow the use of setvaluemode in the meta "_meta":{ "setvaluemode":1 }
over 2 years ago in IBM MAS - Manage (Base) / Integration 3 Future consideration

Count Books using the Select Type of CNTFREQ should not select items where the Count Frequency is zero

In the Count Books application when the Select Type is set to CNTFREQ I think it safe to ignore items where the Count Frequency (INVENTORY.CCF) is zero which is the default for items. If it is zero, then the item will always be due a count, when t...
over 1 year ago in IBM MAS - Manage (Base) / Supply Chain 0 Future consideration