Skip to Main Content
IBM Sustainability Software - Ideas Portal


This portal is to open public enhancement requests against the products and services belonging to IBM Sustainability Software. To view all of your ideas submitted to IBM, create and manage groups of Ideas, or create an idea explicitly set to be either visible by all (public) or visible only to you and IBM (private), use the IBM Unified Ideas Portal (https://ideas.ibm.com).


Shape the future of IBM!

We invite you to shape the future of IBM, including product roadmaps, by submitting ideas that matter to you the most. Here's how it works:

Search existing ideas

Start by searching and reviewing ideas and requests to enhance a product or service. Take a look at ideas others have posted, and add a comment, vote, or subscribe to updates on them if they matter to you. If you can't find what you are looking for,

Post your ideas
  1. Post an idea.

  2. Get feedback from the IBM team and other customers to refine your idea.

  3. Follow the idea through the IBM Ideas process.


Specific links you will want to bookmark for future use

Welcome to the IBM Ideas Portal (https://www.ibm.com/ideas) - Use this site to find out additional information and details about the IBM Ideas process and statuses.

IBM Unified Ideas Portal (https://ideas.ibm.com) - Use this site to view all of your ideas, create new ideas for any IBM product, or search for ideas across all of IBM.

ideasibm@us.ibm.com - Use this email to suggest enhancements to the Ideas process or request help from IBM for submitting your Ideas.

ADD A NEW IDEA

Pinned ideas

PINNED Enable inventory reservation automatic cron task for specific site
Advantage : Enable the cron for specific site which is necessary. Summary: In Maximo, we have more than 50 Active sites. When we try to enable inventory reservation automatic cron task for specific site, There is no Cron Parameters are available....
PINNED Power BI capability alignment between Desktop vs embedded solution
Requesting Customer: Fraser Property but this would benefit all customers using Envizi Power BI capability Business Impact: The Frasers Property Team have recently explored the use of the embeded PowerBI functionality and have found that there are...

All ideas

Showing 2077

Changing the asset folder from within module isn't an actual function that will move them, please change this

One cannot use the function within a module to change the assets folder location. It's not an actual function like one would assume for moving folder locations. It doesn't move the artifacts to the location you select. It's basically just an attri...
over 3 years ago in IBM Engineering - Requirements Management DOORS Next / Usability 0 Not under consideration

Work Center Counts Issue

In Work Center Counts tab, it seems to be a bug in the column of the due date from the color change prospective. The calculation is accurate(Due is same as counted date, which means frequency zero) but when the date is less than the system date it...
over 3 years ago in IBM MAS - Manage (Base) 2 Not under consideration

include editing option to SHARE Personal Tags

One should be able to edit their Personal Tags to become Shared Tags, especially if they have the permissions to create shared tags and shared views. The tagging helps create complex filters that are not available in DNG. The user could save the f...
over 3 years ago in IBM Engineering - Requirements Management DOORS Next / Usability 0 Not under consideration

Please add a Go To Hotkey/keyboard shortcut to bring up the Go To search box

Classic DOORS had a Go To hotkey/shortcut of Ctrl+G available for use in modules to pull up the Go To search box for a specific ID. It was a really great feature of Classic DOORS. Not sure how this one got overlooked, but DNG doesn't have this in ...
over 3 years ago in IBM Engineering - Requirements Management DOORS Next / Usability 0 Not under consideration

Access to Doors OSLC Requirements with Rational Document Builder

We generate a Report with which lists the Object Identifier and Text of DOORS Requirements. To avoid use the doors-client on the server, we want to access the DOORS requirements using DOORS OSLC interface. According to Support, there is no officia...
over 3 years ago in IBM Engineering - Lifecycle Optimization Publishing 1 Not under consideration

Tagging all artifacts which are no longer present after a ReqIf import Not working as expected

Hi Team, There is a new feature (https://www.ibm.com/support/knowledgecenter/en/SSYMRC_7.0.1/com.ibm.rational.rrm.help.doc/topics/t_import_reqif.html) that allows tagging all artifacts which are no longer present after a ReqIf import, which helps ...
over 3 years ago in IBM Engineering - Requirements Management DOORS Next / Documentation 0 Not under consideration

Configurable display of non-working time in Graphical Scheduler

Could a configurable property be added to control the display of shading in the Graphical Gantt view for Scheduler. In some cases the zoom factor on a schedule causes the shading of the non-working time to overwhelm the colorization of the task ba...
over 3 years ago in IBM MAS - Scheduler 1 Not under consideration

Initial Link Validity is Suspect

Unfortunately this is the expected behaviour when setting link validity. Both for it's initial setting and any subsequent changes. "The system automatically sets links to Suspect when artifact contents change." I understand this would be very frus...
over 3 years ago in IBM Engineering - Requirements Management DOORS Next / Feature 0 Not under consideration

Add ability to delete meter readings in Edit Meter Reading History

Users are requesting the ability to delete erroneous meter readings in Edit Meter Reading History. They are unable to modify the meter reading date and therefore need the ability to delete bad records. A conference call was held 10/9/13 with Ed Jo...
about 11 years ago in IBM MAS - Manage (Base) / Integration 2 Not under consideration

Ability to add Pre-conditions to all testcases simultaneously

Currently, in RQM, we have to add pre-condition to testcases -> one testcase at a time -> by opening the testcase in a separate tab and add precondition informationIf the Test Plan has 40 testcases and all testcases have same precondition, i...
over 3 years ago in IBM Engineering - Test Management / Usability 2 Not under consideration