Skip to Main Content
IBM Sustainability Software - Ideas Portal


This portal is to open public enhancement requests against the products and services belonging to IBM Sustainability Software. To view all of your ideas submitted to IBM, create and manage groups of Ideas, or create an idea explicitly set to be either visible by all (public) or visible only to you and IBM (private), use the IBM Unified Ideas Portal (https://ideas.ibm.com).


Shape the future of IBM!

We invite you to shape the future of IBM, including product roadmaps, by submitting ideas that matter to you the most. Here's how it works:

Search existing ideas

Start by searching and reviewing ideas and requests to enhance a product or service. Take a look at ideas others have posted, and add a comment, vote, or subscribe to updates on them if they matter to you. If you can't find what you are looking for,

Post your ideas
  1. Post an idea.

  2. Get feedback from the IBM team and other customers to refine your idea.

  3. Follow the idea through the IBM Ideas process.


Specific links you will want to bookmark for future use

Welcome to the IBM Ideas Portal (https://www.ibm.com/ideas) - Use this site to find out additional information and details about the IBM Ideas process and statuses.

IBM Unified Ideas Portal (https://ideas.ibm.com) - Use this site to view all of your ideas, create new ideas for any IBM product, or search for ideas across all of IBM.

ideasibm@us.ibm.com - Use this email to suggest enhancements to the Ideas process or request help from IBM for submitting your Ideas.

ADD A NEW IDEA

Pinned ideas

PINNED Enable inventory reservation automatic cron task for specific site
Advantage : Enable the cron for specific site which is necessary. Summary: In Maximo, we have more than 50 Active sites. When we try to enable inventory reservation automatic cron task for specific site, There is no Cron Parameters are available....
PINNED Power BI capability alignment between Desktop vs embedded solution
Requesting Customer: Fraser Property but this would benefit all customers using Envizi Power BI capability Business Impact: The Frasers Property Team have recently explored the use of the embeded PowerBI functionality and have found that there are...

All ideas

Showing 2081

[IDz] Merge window: Button Current Change from Right to Left (or Left to Right) should be deactivated once clicked

In the merge window of IDz, after clicking on the button "Copy Current Change from Right to Left (or Left to Right)", we can see the modification in two editors. However this button is still there and clickable if we don't save. In the case of add...
8 months ago in IBM Engineering - Workflow Management / Source Control 1 Not under consideration

Add "Primary Text" to Format Link Display Column

Need to see the linked requirements actual requirements text, not just the name of the requirement in views. It is possible to click on every requirement, but it takes a lot of time. Make it possible to select how to display linked requirements. S...
about 3 years ago in IBM Engineering - Requirements Management DOORS Next / Usability 1 Not under consideration

Restriction in Work Order Tracking

I'd like to be able to restrict the number of Work Orders for a status change from the list view to 1000 instead of 5000. We have users "accidently" complete a ton of work orders from the list view. The latest error was close to 5000 records that ...
about 2 years ago in IBM MAS - Manage (Base) 2 Not under consideration

Many times, I get the id of a work item and I need to go track down which plan it is in. It would be nice to have a history of all the plans that a work item is included in, attached to, etc.

When I'm analyzing work items linked to requirements I need to get to the plan or plans that the work item are part of without having to go dig around to find the info. It would be nice to have the plan as some sort of link on the work item as wel...
4 months ago in IBM Engineering - Workflow Management / Work Items 1 Not under consideration

Move one project from one server to another

So mostly you are starting with a specific set of server. After some time you recognize that it is too small and you are creating new server. So currently it is only possible to add new projects to the new servers. But sometimes it makes sense to ...
4 months ago in IBM Engineering - Foundation/Common Services / Usability 1 Not under consideration

Request to add an option to associate change requests with combined changesets in the EWM client

Currently, there is no option to associate change requests with combined change sets in the EWM Client. When we try to combine change sets in the EWM Client (AEEE), the default option is to associate a work item, not a change request. We would lik...
4 months ago in IBM Engineering - Workflow Management / Source Control 1 Not under consideration

TRIRIGA Reporting - Report Scheduling

Classic TRIRIGA has a Report Scheduling option. Now that our end users are using TRIRIGA Reporting, it would be a great feature to allow an end user to take a TRIRIGA Reporting report and schedule it. So they can tweak a report to their liking, cu...
about 2 years ago in IBM TRIRIGA Reporting 0 Not under consideration

Ability to Configure Which Fields are Available for Inline Editing in Graphical Scheduling

Allow a company to add additional fields that will be available for users to modify using inline editing in Graphical Scheduling.
about 3 years ago in IBM MAS - Scheduler 1 Not under consideration

Add a timeout feature to disconnect Rhapsody from licence server

We are currently using Tokens to manage usage with DOORS + ELM + Rhapsody. We found that tokens are used unnecessarily as users are not closing Rhapsody during the day (Rhapsody can be opened 24/7). So Tokens are never released and it causes the f...
almost 2 years ago in IBM Engineering - Systems Design Rhapsody/RMM / Rhapsody Client 3 Not under consideration

Possibility to do a precise search with the "Find" functionality

Is there no mean to do a precise search with the "Find" functionality, that is to say, do a search on a "word" and have only results with the entire "word" and not results where "word" is just a part of a biggest word.
over 5 years ago in IBM Engineering - Requirements Management DOORS Next / Feature 3 Not under consideration