Skip to Main Content
IBM Sustainability Software - Ideas Portal


This portal is to open public enhancement requests against the products and services belonging to IBM Sustainability Software. To view all of your ideas submitted to IBM, create and manage groups of Ideas, or create an idea explicitly set to be either visible by all (public) or visible only to you and IBM (private), use the IBM Unified Ideas Portal (https://ideas.ibm.com).


Shape the future of IBM!

We invite you to shape the future of IBM, including product roadmaps, by submitting ideas that matter to you the most. Here's how it works:

Search existing ideas

Start by searching and reviewing ideas and requests to enhance a product or service. Take a look at ideas others have posted, and add a comment, vote, or subscribe to updates on them if they matter to you. If you can't find what you are looking for,

Post your ideas
  1. Post an idea.

  2. Get feedback from the IBM team and other customers to refine your idea.

  3. Follow the idea through the IBM Ideas process.


Specific links you will want to bookmark for future use

Welcome to the IBM Ideas Portal (https://www.ibm.com/ideas) - Use this site to find out additional information and details about the IBM Ideas process and statuses.

IBM Unified Ideas Portal (https://ideas.ibm.com) - Use this site to view all of your ideas, create new ideas for any IBM product, or search for ideas across all of IBM.

ideasibm@us.ibm.com - Use this email to suggest enhancements to the Ideas process or request help from IBM for submitting your Ideas.

ADD A NEW IDEA

IBM Engineering - Workflow Management

Showing 271

Changing the column width in EWM works different to DNG and to office standard.

The DNG or Microsoft Office way for changing the column with would be fine. Changing the size of one column should not interfere to the column size of any other column. See attached video.
over 2 years ago in IBM Engineering - Workflow Management / Usability 1 Future consideration

Add support for “chunking” build result processing

In some circumstances there are so many build results saved up that the deleteBuildResult ant task runs out of storage trying to download, process and prune all of the results. This failure happens at the worst time: when processing the worst of t...
over 2 years ago in IBM Engineering - Workflow Management / Build 1 Future consideration

Restriction to user from downloading Work Item's attachment

Work Item has facility to upload the file as an attachment (e.g. txt, pdf, word document, etc.), which contains the most important information of the organization. In order to ensure the data security it is necessary that the attachments should be...
over 2 years ago in IBM Engineering - Workflow Management / Work Items 1 Future consideration

Need to scope plan to include Category and sub-categories

I need a way to be able to limit the scope of the plan - what is read up from the database - to a category plus its subcategories. I want to use Plan Scope to do this so that it limits how many database items are brought into the plan to improve l...
almost 3 years ago in IBM Engineering - Workflow Management / Planning 2 Future consideration

I would like to create a report to show a relationship between a plan in EWM, a requirement collection in Doors Next and a Test Plan in ETM.

I would like to create a report to show a relationship between a plan in Engineering Workflow Management, a requirement collection in Doors Next and a Test Plan in Engineering Test Management.
almost 3 years ago in IBM Engineering - Workflow Management / Unassigned 6 Future consideration

As a plan view creator I want to be able to use wildcard search for filled against attribute when creating a color tag

Currently, when you create color parameter for filled against, you can only pick up the filled against attribute. But when you have many different attributes, it could be useful to be able to select many values using wildcard search (all values ma...
almost 3 years ago in IBM Engineering - Workflow Management / Planning 1 Future consideration

Preserve the component flow scope between different workspaces or defining the configuration at workspace/stream level or exporting the selection for reuse.

I would like to have a feature that creating a workspace for different streams with the same components present in both the streams. Use case: Defines the scope of components for a stream from the workspace. When a new workspace is created using a...
about 3 years ago in IBM Engineering - Workflow Management / Source Control 1 Future consideration

Implement an option to limit the number of files attached to a work item.

The possibility of limiting the number of attachments in a work item will facilitate the management of attached files, the management of the space occupied by the attachments and will make the workflow more agile.
about 3 years ago in IBM Engineering - Workflow Management 1 Future consideration

Brickable Queries

Sometimes it is necessary for projects to create plenty of queries. Often makes it sense that some queries contain a more major view and some queries expand this major view to a more specific one. This makes it currently necessary to create one ma...
about 3 years ago in IBM Engineering - Workflow Management 3 Future consideration

Dedicated Permission for creating Workitem Template

Need a dedicated permission to save work-item templates without enabling "Modify Process Specification". With this permission, a user can edit other work-item details too like modify role definitions, permissions assigned to roles, define operatio...
about 3 years ago in IBM Engineering - Workflow Management 1 Future consideration