Skip to Main Content
IBM Sustainability Software - Ideas Portal


This portal is to open public enhancement requests against the products and services belonging to IBM Sustainability Software. To view all of your ideas submitted to IBM, create and manage groups of Ideas, or create an idea explicitly set to be either visible by all (public) or visible only to you and IBM (private), use the IBM Unified Ideas Portal (https://ideas.ibm.com).


Shape the future of IBM!

We invite you to shape the future of IBM, including product roadmaps, by submitting ideas that matter to you the most. Here's how it works:

Search existing ideas

Start by searching and reviewing ideas and requests to enhance a product or service. Take a look at ideas others have posted, and add a comment, vote, or subscribe to updates on them if they matter to you. If you can't find what you are looking for,

Post your ideas
  1. Post an idea.

  2. Get feedback from the IBM team and other customers to refine your idea.

  3. Follow the idea through the IBM Ideas process.


Specific links you will want to bookmark for future use

Welcome to the IBM Ideas Portal (https://www.ibm.com/ideas) - Use this site to find out additional information and details about the IBM Ideas process and statuses.

IBM Unified Ideas Portal (https://ideas.ibm.com) - Use this site to view all of your ideas, create new ideas for any IBM product, or search for ideas across all of IBM.

ideasibm@us.ibm.com - Use this email to suggest enhancements to the Ideas process or request help from IBM for submitting your Ideas.

ADD A NEW IDEA

Pinned ideas

PINNED Power BI capability alignment between Desktop vs embedded solution
Requesting Customer: Fraser Property but this would benefit all customers using Envizi Power BI capability Business Impact: The Frasers Property Team have recently explored the use of the embeded PowerBI functionality and have found that there are...
PINNED Enable inventory reservation automatic cron task for specific site
Advantage : Enable the cron for specific site which is necessary. Summary: In Maximo, we have more than 50 Active sites. When we try to enable inventory reservation automatic cron task for specific site, There is no Cron Parameters are available....

All ideas

Showing 2862

Rhapsody Gateway Export issue: unknown method DOORSFind

"Unknown method named DOORSFind in class reference". Gateway does not give any clue from where this issue coming.
over 3 years ago in IBM Engineering - Systems Design Rhapsody/RMM / Other 2 Future consideration

Calender widget for reports

Create a calendar view from a report. The date is in the table of the report and the display is a selected column in the report.
over 3 years ago in IBM Engineering - Workflow Management / Reporting 1 Future consideration

Show only components containing RPYX files in the designs explorer view in EWM RMM Design Explorer view

Currently in Rhapsody Model Manager (RMM) web view, under the CCM application, Designs/Design Explorer view, all the components are listed irrespective of whether the component has a RPYX file or not. This exploration is meaningful only from those...
over 3 years ago in IBM Engineering - Systems Design Rhapsody/RMM / Modeling and UI 3 Future consideration

Support of Proxy Ports in dataflow of Sequence diagram both manually in rhapsody and via Java API

Flow Port is deprecated, now our models are full of proxy ports. So we need support of adding proxy ports to dataflow in sequence diagram To automate diagram creation we need support of adding same via java api as well
over 3 years ago in IBM Engineering - Systems Design Rhapsody/RMM / Modeling and UI 1 Future consideration

Free forms shall be changed in a hierarchical way to front/back

Currently the free forms can only be set to back or front. This is working in diagrams where elements don't have a hierarchy. So for elements within a hierarchy like actions within an ActionBlock it is not working anymore. So it would be good to s...
over 3 years ago in IBM Engineering - Systems Design Rhapsody/RMM / Modeling and UI 0 Future consideration

Prevent Liability from being Remeasured

On a lease record, if the FMV of the asset is changed, or the Full Impairment box is checked, it should prevent the Liability from being remeasured, even if the IBR is updated on the Accounting Revise/Contractual Factors screen by mistake.
over 3 years ago in IBM TRIRIGA Real Estate & Lease Accounting Management 3 Future consideration

Configure Diff merge and Beyond compare at the same time

In RTC client, we need the ability to configure diff merge and beyond compare at the same time so that we can use both tools for different file extensions without switching between the configurations.
over 3 years ago in IBM Engineering - Workflow Management / Integrations 1 Future consideration

Scoped Enumeration in Animation

Enhance Request to support scoped Enumeration and to use it in Animation.I want the following behavior.- User can use the literal of an enumeration whose name is as same as the name of literal of another enumeration.- The behavior is as same as C+...
over 3 years ago in IBM Engineering - Systems Design Rhapsody/RMM / Modeling and UI 0 Future consideration

Provide easy way to add many users to project area

RTC Project Area increases sometime for some reasons, for instance, security requirement.Many users shall be assigned to P.Area every time P.Area is created. Adding users to P.Area with existing GUI is hard work and may become a cause of mistake. ...
over 10 years ago in IBM Engineering - Foundation/Common Services / Unassigned 3 Future consideration

RQA: Update "Issues Found by RQA" even when it cannot score the artifact.

There are times when RQA cannot score an artifact for WHATEVER reason (for example - a graphic). Since the widget tells us that the artifact cannot be scored - a standard expression should be entered into the "Issues Found by RQA" (if we are in an...
over 3 years ago in IBM Engineering - Requirements Quality Assistant / Scoring 0 Future consideration