Skip to Main Content
IBM Sustainability Software - Ideas Portal


This portal is to open public enhancement requests against the products and services belonging to IBM Sustainability Software. To view all of your ideas submitted to IBM, create and manage groups of Ideas, or create an idea explicitly set to be either visible by all (public) or visible only to you and IBM (private), use the IBM Unified Ideas Portal (https://ideas.ibm.com).


Shape the future of IBM!

We invite you to shape the future of IBM, including product roadmaps, by submitting ideas that matter to you the most. Here's how it works:

Search existing ideas

Start by searching and reviewing ideas and requests to enhance a product or service. Take a look at ideas others have posted, and add a comment, vote, or subscribe to updates on them if they matter to you. If you can't find what you are looking for,

Post your ideas
  1. Post an idea.

  2. Get feedback from the IBM team and other customers to refine your idea.

  3. Follow the idea through the IBM Ideas process.


Specific links you will want to bookmark for future use

Welcome to the IBM Ideas Portal (https://www.ibm.com/ideas) - Use this site to find out additional information and details about the IBM Ideas process and statuses.

IBM Unified Ideas Portal (https://ideas.ibm.com) - Use this site to view all of your ideas, create new ideas for any IBM product, or search for ideas across all of IBM.

ideasibm@us.ibm.com - Use this email to suggest enhancements to the Ideas process or request help from IBM for submitting your Ideas.

ADD A NEW IDEA

Pinned ideas

PINNED Power BI capability alignment between Desktop vs embedded solution
Requesting Customer: Fraser Property but this would benefit all customers using Envizi Power BI capability Business Impact: The Frasers Property Team have recently explored the use of the embeded PowerBI functionality and have found that there are...
PINNED Enable inventory reservation automatic cron task for specific site
Advantage : Enable the cron for specific site which is necessary. Summary: In Maximo, we have more than 50 Active sites. When we try to enable inventory reservation automatic cron task for specific site, There is no Cron Parameters are available....

All ideas

Showing 2863

Rhapsody Java API - It shall be possible to change the layout of the diagram using java API

It shall be possible to change the layout of the diagram using java API Currently this functionality is available in UI. If you were to right click on a diagram -> Layout ->(Hierarchical/orthogonal/..) such options are available. The same fu...
about 5 years ago in IBM Engineering - Systems Design Rhapsody/RMM / Integrations and APIs 0 Future consideration

System Boundary Box should be returned as Grpahical Parent(Java API) when it is so

We are drawing use case diagrams Now if we have a use case inside system boundary box, then moving the use case also moves System Boundary Box So we would expect that graphical parent(using Java API) of that use case should return System Boundary ...
about 5 years ago in IBM Engineering - Systems Design Rhapsody/RMM / Modeling and UI 0 Future consideration

Property to show stereotypes only from particular packages/profiles and hide all other stereotypes in Stereotpyes dropdown

We want to display stereotypes only from particular packages/profiles and hide all other unnecessary stereotypes in stereotypes dropdown The intended property "Features::General::UsablePredefinedPackagesForShowingStereotypes" which was designed to...
about 5 years ago in IBM Engineering - Systems Design Rhapsody/RMM / Modeling and UI 0 Future consideration

GET training Data API from WDS in order to link/track userID with the query's

Supports Change Management Metrics. Supports end user analytics. Supports First-time-to-fix and Mean-time-to-repair use case analysis.
about 5 years ago in IBM MAS - Assist 1 Future consideration

Control System Usage by user and functionality

It must be possible to govern resource consumption based on user and/or feature/functionality used. It shall be possible to exert this control in an automated way. This applies to all ELM applications incl. CCM, RQM, DNG, AM, GC, LDX, LQE, DCC, JR...
about 5 years ago in IBM Engineering - Foundation/Common Services / Unassigned 3 Future consideration

Windows Server System Drive Integrity (No data written to C: drive)

It must be avoided that application data exhausts all available free space on the system C:-drive.This applies to all ELM applications incl. CCM, RQM, DNG, AM, GC, LDX, LQE, DCC, JRS, JTC, JAS.
about 5 years ago in IBM Engineering - Foundation/Common Services / Administration 3 Future consideration

Caching Proxy support for Web clients and all user-centric applications

Caching proxies need to cache the data of all applications. This has to includes attachments, and all applications that end-users typically work with, i. e. RTC, DNG, RQM, AM, GC, RELM.Currently, caching proxy is limited to Eclipse clients and CCM.
about 5 years ago in IBM Engineering - Foundation/Common Services / Unassigned 3 Future consideration

Ready-for-service flag for all applications

Each application should offer a ready status flag that can be queried from a script or (installation) automation (e. g. a REST call). This flag shall be set once the application has completed all start-up activities after server start. After the f...
about 5 years ago in IBM Engineering - Foundation/Common Services / Installation 3 Future consideration

API to disable refresh of OSLC artifacts in Rhapsody

When a custom plugin is run through the Rhapsody model, a popup of loading Remote Artifacts appears and when the model is large, loading a huge number of elements in order to modify them in a short space of time which in turn leads to too many OSL...
about 5 years ago in IBM Engineering - Systems Design Rhapsody/RMM / Rhapsody Client 0 Future consideration

Scheduler Rotating Tool Issue

Under the resource scheduling section of a Schedule, rotating tools and the quantity available is counted by default to all available in any storeroom per site. The issue is that when you specifically select one storeroom the values are still bein...
about 5 years ago in IBM MAS - Scheduler 2 Future consideration