Skip to Main Content
IBM Sustainability Software - Ideas Portal


This portal is to open public enhancement requests against the products and services belonging to IBM Sustainability Software. To view all of your ideas submitted to IBM, create and manage groups of Ideas, or create an idea explicitly set to be either visible by all (public) or visible only to you and IBM (private), use the IBM Unified Ideas Portal (https://ideas.ibm.com).


Shape the future of IBM!

We invite you to shape the future of IBM, including product roadmaps, by submitting ideas that matter to you the most. Here's how it works:

Search existing ideas

Start by searching and reviewing ideas and requests to enhance a product or service. Take a look at ideas others have posted, and add a comment, vote, or subscribe to updates on them if they matter to you. If you can't find what you are looking for,

Post your ideas
  1. Post an idea.

  2. Get feedback from the IBM team and other customers to refine your idea.

  3. Follow the idea through the IBM Ideas process.


Specific links you will want to bookmark for future use

Welcome to the IBM Ideas Portal (https://www.ibm.com/ideas) - Use this site to find out additional information and details about the IBM Ideas process and statuses.

IBM Unified Ideas Portal (https://ideas.ibm.com) - Use this site to view all of your ideas, create new ideas for any IBM product, or search for ideas across all of IBM.

ideasibm@us.ibm.com - Use this email to suggest enhancements to the Ideas process or request help from IBM for submitting your Ideas.

ADD A NEW IDEA

Pinned ideas

PINNED Power BI capability alignment between Desktop vs embedded solution
Requesting Customer: Fraser Property but this would benefit all customers using Envizi Power BI capability Business Impact: The Frasers Property Team have recently explored the use of the embeded PowerBI functionality and have found that there are...
PINNED Enable inventory reservation automatic cron task for specific site
Advantage : Enable the cron for specific site which is necessary. Summary: In Maximo, we have more than 50 Active sites. When we try to enable inventory reservation automatic cron task for specific site, There is no Cron Parameters are available....

All ideas

Showing 5785 of 5785

DNG :Links showing up but can't remove them

The link may have been deleted from artifact, but not 100% certain. And it shows "The artifact cannot be found. It might be deleted or archived, you might not have permission to access it or might not be visible in this configuration." on mouse cl...
over 4 years ago in IBM Engineering - Requirements Management DOORS Next / Feature 2 Not under consideration

Automation Script Advanced Search screen needs fields for searching launch points and code

The Advanced Search dialog in the Automation Scripts application needs to support searching for code snippets and launch points out of the box. It only takes a few minutes to use App Designer to add fields for searching the LAUNCHPOINTTYPE, OBJECT...
over 2 years ago in IBM MAS - Manage (Base) / System Admin Config/Security 2 Future consideration

Provide Capability to Present Questions in the Tabular/Grid Format Layout in the Inspection Form

Hi team, We have come across a requirement for the inspection form where the customer would like to have inspection forms questions to be presented in the tabular or a grid format. Work around to achieve this is laying down those questions in the ...
over 1 year ago in IBM MAS - Mobile 1 Not under consideration

Additional attributes for filters like Satisfied By or Satisfies etc

Currently we are exporting the DNG module in entire in excel and we are filtering the artifacts which has some values for few attributes like Satisfies By, Satisfies, Validated By etc. If we were able to filter before generating the report out of ...
over 1 year ago in IBM Engineering - Requirements Management DOORS Next / Feature 1 Future consideration

Dynamic Job Plans should allow to enter job plan duration that is less than 1 minute.

There are some inspections that last only few seconds but overall it takes minutes to complete them all because there is hundreds of them in a batch. If they get one minute each then total time is much longer than real inspection time. For example...
over 1 year ago in IBM MAS - Manage (Base) / Asset/Work Management 1 Not under consideration

Compare Configuration for Reviews

The current compare configuration tool generates differences for the entire component, which often causes the tool to run very slowly and discourages its use by end-user. It would be useful if there was an option within a review to generate a comp...
over 3 years ago in IBM Engineering - Requirements Management DOORS Next / Usability 0 Not under consideration

Ability to Pause DNG Rebase to withstand a server restart.

A Full Rebase of DNG resources can take 5 to 7 days preventing any other type of maintenance which would include a server restart. It would be nice to have this similar to the way LQE indexing can be paused.
over 3 years ago in IBM Engineering - Requirements Management DOORS Next / Usability 0 Not under consideration

'Show in Rhapsody'-function in RMM does not set correct global context in Rhapsody

If executing 'Show in Rhapsody', the context in Rhapsody is not re-set or no warning occurs that the global context is inconsistent. See attachments. Expection: the correct context is set correctly and if not compatible (component check) the user ...
over 4 years ago in IBM Engineering - Systems Design Rhapsody/RMM / Web Client 0 Future consideration

Spilit "Require Workspaces to Be Caught Up Before Delivery" preconditon

Stream and workspace two distinct concepts/objects in RTC. Streams are long lived and where as workspaces are short lived used by each developer for personal work which is delivered to team stream. The existing precondition "Require Workspaces to ...
over 3 years ago in IBM Engineering - Workflow Management / Source Control 2 Future consideration

Update table properties

update table properties so that user can visualize in the "test cases" not only TCER Count but the actual ID and TCER
11 months ago in IBM Engineering - Test Management / Administration 0 Future consideration