Skip to Main Content
IBM Sustainability Software - Ideas Portal


This portal is to open public enhancement requests against the products and services belonging to IBM Sustainability Software. To view all of your ideas submitted to IBM, create and manage groups of Ideas, or create an idea explicitly set to be either visible by all (public) or visible only to you and IBM (private), use the IBM Unified Ideas Portal (https://ideas.ibm.com).


Shape the future of IBM!

We invite you to shape the future of IBM, including product roadmaps, by submitting ideas that matter to you the most. Here's how it works:

Search existing ideas

Start by searching and reviewing ideas and requests to enhance a product or service. Take a look at ideas others have posted, and add a comment, vote, or subscribe to updates on them if they matter to you. If you can't find what you are looking for,

Post your ideas
  1. Post an idea.

  2. Get feedback from the IBM team and other customers to refine your idea.

  3. Follow the idea through the IBM Ideas process.


Specific links you will want to bookmark for future use

Welcome to the IBM Ideas Portal (https://www.ibm.com/ideas) - Use this site to find out additional information and details about the IBM Ideas process and statuses.

IBM Unified Ideas Portal (https://ideas.ibm.com) - Use this site to view all of your ideas, create new ideas for any IBM product, or search for ideas across all of IBM.

ideasibm@us.ibm.com - Use this email to suggest enhancements to the Ideas process or request help from IBM for submitting your Ideas.

ADD A NEW IDEA

Pinned ideas

PINNED Enable inventory reservation automatic cron task for specific site
Advantage : Enable the cron for specific site which is necessary. Summary: In Maximo, we have more than 50 Active sites. When we try to enable inventory reservation automatic cron task for specific site, There is no Cron Parameters are available....

IBM MAS - Manage (Base)

Showing 446

Auto-reorder generate SR/WO for in-house fabricated items

Our maintenance technicians often make fabricated parts for certain assets in-house or have an outside service make them for us. These parts are stocked as inventory items and managed with reorder. We'd like for IBM to provide an option in Maximo ...
over 2 years ago in IBM MAS - Manage (Base) / Supply Chain 0 Future consideration

Populating Target Start Date for Meter Based PM Work Orders

The Target Start and Finish dates on a Work Order does not incorporate lead time on work order creation from a meter based PM.
over 9 years ago in IBM MAS - Manage (Base) 3 Future consideration

Create and utilize Failure-Codes Analysis Report Functionality to WO Module and related Applications

The failure codes functionality is a powerful feature of Maximo that enables standardization of failure reporting to Work activities.Although the failure reporting is made easy throughout WO apps (e.g. WOTRACK, Quick Rep.), there is no actual repo...
over 3 years ago in IBM MAS - Manage (Base) 0 Future consideration

Remember my change position when screen is refreshed in non-applet workflow

We use Maximo 7.6.1. When we modify a non-applet workflow, the screen is refreshed. I can't locate my change easily.
over 2 years ago in IBM MAS - Manage (Base) 3 Future consideration

Eliminate the requirement to press the route workflow button again after an Interaction Node to end the WF

After routing a WF whenever an Interaction Node is encountered (i.e. Select Owner) the WF stops and the user has to to press the route workflow button again to finish the WF.
about 12 years ago in IBM MAS - Manage (Base) 3 Future consideration

Provide ability to define global settings in the graphite designer e.g. table row type = compact

the application will allow administrators to define a table's row type as compact. adminstrators may want to set this globally across all their apps. currently administrators have to edit each of the tables in the applications
over 2 years ago in IBM MAS - Manage (Base) / Asset/Work Management 0 Future consideration

Allow common asset meter history across sites

System allows assets to be moved between the sites, but asset meter history remains in the original site. This created a problem for preventive maintenance as there is no meter history in the new site and preventive maintenance is skipped. In addi...
over 7 years ago in IBM MAS - Manage (Base) 0 Future consideration

Option to disable the copy of multiple assets when creating follow-up Work Order

Maximo works in a way, that if you have a Work Order with populated multiple asset section and you create a follow-up Work Order on such Work Order its copies all of the multiple assets from the originator to the follow-up Work Order.The inconveni...
over 1 year ago in IBM MAS - Manage (Base) / Asset/Work Management 0 Future consideration

add a property which allows for the tracking of synchronous interfaces by csv of names, null being all synchronous interfaces

Enable message tracking for a particular REST API interface. This can be done via system properties, but, it will affect globally for inbound messages. This allows us to enable for a specific REST API. It works in conjunction with the current maxi...
over 1 year ago in IBM MAS - Manage (Base) 0 Future consideration

PlusCDueDate calcluation to be corrected

Current calculation for PlusCDueDate is 1. Retrieves all WOs where WorkOrder.AssetNum = ToolTrans.RotAssetNum (note: NOT ToolTrans.AssetNum) WorkOrder.Status != ‘CLOSED', 'COMPLETED', or ‘CANCELED' WorkOrder.WorkType = ‘CAL' or a synonym of ‘CA...
over 6 years ago in IBM MAS - Manage (Base) 1 Future consideration