Skip to Main Content
IBM Sustainability Software - Ideas Portal


This portal is to open public enhancement requests against the products and services belonging to IBM Sustainability Software. To view all of your ideas submitted to IBM, create and manage groups of Ideas, or create an idea explicitly set to be either visible by all (public) or visible only to you and IBM (private), use the IBM Unified Ideas Portal (https://ideas.ibm.com).


Shape the future of IBM!

We invite you to shape the future of IBM, including product roadmaps, by submitting ideas that matter to you the most. Here's how it works:

Search existing ideas

Start by searching and reviewing ideas and requests to enhance a product or service. Take a look at ideas others have posted, and add a comment, vote, or subscribe to updates on them if they matter to you. If you can't find what you are looking for,

Post your ideas
  1. Post an idea.

  2. Get feedback from the IBM team and other customers to refine your idea.

  3. Follow the idea through the IBM Ideas process.


Specific links you will want to bookmark for future use

Welcome to the IBM Ideas Portal (https://www.ibm.com/ideas) - Use this site to find out additional information and details about the IBM Ideas process and statuses.

IBM Unified Ideas Portal (https://ideas.ibm.com) - Use this site to view all of your ideas, create new ideas for any IBM product, or search for ideas across all of IBM.

ideasibm@us.ibm.com - Use this email to suggest enhancements to the Ideas process or request help from IBM for submitting your Ideas.

ADD A NEW IDEA

Pinned ideas

PINNED Enable inventory reservation automatic cron task for specific site
Advantage : Enable the cron for specific site which is necessary. Summary: In Maximo, we have more than 50 Active sites. When we try to enable inventory reservation automatic cron task for specific site, There is no Cron Parameters are available....
PINNED Power BI capability alignment between Desktop vs embedded solution
Requesting Customer: Fraser Property but this would benefit all customers using Envizi Power BI capability Business Impact: The Frasers Property Team have recently explored the use of the embeded PowerBI functionality and have found that there are...

All ideas

Showing 5960

App Links should work in GWW

The App Links in Graphical Work Week (GWW) have been hard-coded, you cannot add new app links although the facility is provided to do so. When entering a new app link, you can test that it works in Graphical Assignment.
over 3 years ago in IBM MAS - Scheduler 2 Future consideration

Cannot Create external Links from Requirement Management to ArchitectureManagement when changeset workflow is enabled in RM a

1.OSLC Link menu is disabled if we do not create a changeset in the Requirement Management Area2.If we create a changeset in RM(OSLC Link menu is enabled) and create a link to the External Project area e.g Architecture Management area then the ext...
almost 5 years ago in IBM Engineering - Requirements Management DOORS Next / Feature 2 Not under consideration

Improved filtering of "module" tags after ReqIF import

We receive requirements from our customer as a ReqIF format. When importing, we have to check to see if any previously sent requirements in our DNG project have been removed in the incoming ReqIF file. This is the only way that we know that our cu...
about 1 year ago in IBM Engineering - Requirements Management DOORS Next / Feature 0 Future consideration

Auto Capture Warning Message

This feature of a pop up warning when remoting into devices would be useful to remind the use to re enable auto capture once model logic or inspections are changed.
about 1 year ago in IBM MAS - Visual Inspection / MVI Mobile 0 Not under consideration

Show "includeSubDomains" in the response headers

Per TS008457578 and the Jazz Development team's response, Jazz does not read the "includeSubDomains" parameter from the configuration file. This is hard-coded in the BridgeFilter file as below: private static String HSTS_HEADER_NAME = "Strict-Tran...
about 1 year ago in IBM Engineering - Foundation/Common Services / Usability 1 Not under consideration

Compare and work of/with changes is bad

After a re-import i tried to find out which changes occur. I looked for this in the change set and start to deliver - after clicking step by step i come to the overview that i can see the dedicated occured changes --> 532changes.The issue here ...
over 3 years ago in IBM Engineering - Requirements Management DOORS Next / Usability 3 Not under consideration

Allow activation and modification of the lease in the same month

Currently TRIRIGA always considers the first day of the Fiscal period as the modification effective date although the modification can happen mid month. In this situation, TRIRIGA does not calculate the Accounting schedules and thereby the JEs cor...
about 6 years ago in IBM TRIRIGA Real Estate & Lease Accounting Management 3 Planned for future release

Execution Variables for Test Plans in ETM

The feature of setting default values of Execution Variables is available in Test Cases and Test Suites, but not in Test Plans. Currently, there is no straight-forward way to run a Test Plan with a set of default Execution Variable values as an en...
almost 5 years ago in IBM Engineering - Test Management / Usability 3 Not under consideration

Link Validity configurable per attribute (Test case)

Closely related to https://ideas.ibm.com/ideas/ENGRMDN-I-2. This is very similar to the functionality in DOORS Next which will be introduced in 7.0.3. Scenario: Test engineers have to adapt specific test case attributes, which do not have any impa...
about 1 year ago in IBM Engineering - Test Management / Test Execution 0 Future consideration

Please add a pod anti-affinity preferredDuringSchedulingIgnoredDuringExecution constraint to the build configs that get generated by Manage

When Manage is deployed with separate cron, mea, report and ui bundles the cron-build, mea-build, report-build and ui-build are started concurrently after the admin build. Our observation is that in OCP 4.12 these 4 builds usually get scheduled on...
about 1 year ago in IBM MAS - Manage (Base) 2 Not under consideration