Skip to Main Content
IBM Sustainability Software - Ideas Portal


This portal is to open public enhancement requests against the products and services belonging to IBM Sustainability Software. To view all of your ideas submitted to IBM, create and manage groups of Ideas, or create an idea explicitly set to be either visible by all (public) or visible only to you and IBM (private), use the IBM Unified Ideas Portal (https://ideas.ibm.com).


Shape the future of IBM!

We invite you to shape the future of IBM, including product roadmaps, by submitting ideas that matter to you the most. Here's how it works:

Search existing ideas

Start by searching and reviewing ideas and requests to enhance a product or service. Take a look at ideas others have posted, and add a comment, vote, or subscribe to updates on them if they matter to you. If you can't find what you are looking for,

Post your ideas
  1. Post an idea.

  2. Get feedback from the IBM team and other customers to refine your idea.

  3. Follow the idea through the IBM Ideas process.


Specific links you will want to bookmark for future use

Welcome to the IBM Ideas Portal (https://www.ibm.com/ideas) - Use this site to find out additional information and details about the IBM Ideas process and statuses.

IBM Unified Ideas Portal (https://ideas.ibm.com) - Use this site to view all of your ideas, create new ideas for any IBM product, or search for ideas across all of IBM.

ideasibm@us.ibm.com - Use this email to suggest enhancements to the Ideas process or request help from IBM for submitting your Ideas.

ADD A NEW IDEA

Pinned ideas

PINNED Power BI capability alignment between Desktop vs embedded solution
Requesting Customer: Fraser Property but this would benefit all customers using Envizi Power BI capability Business Impact: The Frasers Property Team have recently explored the use of the embeded PowerBI functionality and have found that there are...
PINNED Enable inventory reservation automatic cron task for specific site
Advantage : Enable the cron for specific site which is necessary. Summary: In Maximo, we have more than 50 Active sites. When we try to enable inventory reservation automatic cron task for specific site, There is no Cron Parameters are available....

All ideas

Showing 5910

Need to scope plan to include Category and sub-categories

I need a way to be able to limit the scope of the plan - what is read up from the database - to a category plus its subcategories. I want to use Plan Scope to do this so that it limits how many database items are brought into the plan to improve l...
over 6 years ago in IBM Engineering - Workflow Management / Work Items 2 Not under consideration

Keep display settings

Users usually want to look at more than 20 images at a time, so they have to select a larger number of images not only every time they log in, but also every time they leave and return to a page. Keeping this setting for the duration of a login se...
about 3 years ago in IBM MAS - Visual Inspection 0 Is a defect

If deleting a attribute, his MAXLOOKUPMAP should be deleted to.

If you add a MAXLOOKUPMAP to an attribute in the database configuration and then delete the attribute, the MAXLOOKUPMAP of the attribute remains. These are the steps to recreate the problem: 1. go to the application database configuration 2. open ...
over 1 year ago in IBM MAS - Manage (Base) 0 Future consideration

Enhancement request for proper documentation Model Synchronization profile

Documentation Model Synchronization profile:This is a good feature to have in Rhapsody At present there is only one short documentation in in the below link :https://www.ibm.com/support/knowledgecenter/hr/SSB2MU_8.4.0/com.ibm.rhp.uml.diagrams.doc/...
almost 5 years ago in IBM Engineering - Systems Design Rhapsody/RMM / Documentation 1 Future consideration

VET Add extra information to User correlation output

Description: Currently users can use the custom log message functionality to write a log entry when they start an operation. The entry contains an ID that identifies the user's session. The users can then use the same function to write a closing c...
over 1 year ago in IBM MAS - Manage (Base) / System Admin Config/Security 0 Future consideration

Enhancement request for Operations in an interface should be 'virtual' by default

while adding function to interface class, all functions are marked as abstract not virtual.
almost 5 years ago in IBM Engineering - Systems Design Rhapsody/RMM / Modeling and UI 1 Future consideration

500 image per page option

An active plant can get more than 1000 new images in a data set in day, and having to click through more than 10 pages for a single day is a hassle. It also makes it difficult to compare results across the entire day. An additional option for 500 ...
about 3 years ago in IBM MAS - Visual Inspection 0 Future consideration

Change bounding box color for failed inspections

Currently, all inspected objects have a green box, whether the inspection was a pass or fail. Having this box be a different color would make it easier to tell at a glance which inspections were considered a failure.
about 3 years ago in IBM MAS - Visual Inspection 0 Future consideration

Module Pencil Menue "Set as heading or Content" shall modify artifact type and format according to artifact type definition

Today one can use the comand to change headings into text or requirements. It is a nice way to work, but it is impossible to change an artifact into a diagram, becase the format is not changed. If a user tries to do this, they will create miss-mat...
about 3 years ago in IBM Engineering - Requirements Management DOORS Next / Usability 1 Not under consideration

'Replace in' and 'Replace with' options on RWS in eclipse should be placed away from each other

In Eclipse, When we right click for the options on Repository workspace, we have an option of "Replace in" and "Replace with". As "Replace in" and "Replace with" options are close to each other and makes little difference while reading them Instea...
about 3 years ago in IBM Engineering - Workflow Management / Source Control 1 Future consideration