Skip to Main Content
IBM Sustainability Software - Ideas Portal


This portal is to open public enhancement requests against the products and services belonging to IBM Sustainability Software. To view all of your ideas submitted to IBM, create and manage groups of Ideas, or create an idea explicitly set to be either visible by all (public) or visible only to you and IBM (private), use the IBM Unified Ideas Portal (https://ideas.ibm.com).


Shape the future of IBM!

We invite you to shape the future of IBM, including product roadmaps, by submitting ideas that matter to you the most. Here's how it works:

Search existing ideas

Start by searching and reviewing ideas and requests to enhance a product or service. Take a look at ideas others have posted, and add a comment, vote, or subscribe to updates on them if they matter to you. If you can't find what you are looking for,

Post your ideas
  1. Post an idea.

  2. Get feedback from the IBM team and other customers to refine your idea.

  3. Follow the idea through the IBM Ideas process.


Specific links you will want to bookmark for future use

Welcome to the IBM Ideas Portal (https://www.ibm.com/ideas) - Use this site to find out additional information and details about the IBM Ideas process and statuses.

IBM Unified Ideas Portal (https://ideas.ibm.com) - Use this site to view all of your ideas, create new ideas for any IBM product, or search for ideas across all of IBM.

ideasibm@us.ibm.com - Use this email to suggest enhancements to the Ideas process or request help from IBM for submitting your Ideas.

ADD A NEW IDEA

Pinned ideas

PINNED Power BI capability alignment between Desktop vs embedded solution
Requesting Customer: Fraser Property but this would benefit all customers using Envizi Power BI capability Business Impact: The Frasers Property Team have recently explored the use of the embeded PowerBI functionality and have found that there are...
PINNED Enable inventory reservation automatic cron task for specific site
Advantage : Enable the cron for specific site which is necessary. Summary: In Maximo, we have more than 50 Active sites. When we try to enable inventory reservation automatic cron task for specific site, There is no Cron Parameters are available....

All ideas

Showing 5788 of 5788

Update minimum password complexity settings to comply with CMMC IA.2.078

CMMC has minimum password complexity requirements that aren't satisfied with current password options in DOORS.
about 2 years ago in IBM Engineering - Requirements Management DOORS/DOORS Web Access / Configuration 0 Future consideration

Add View SLA on Asset, CI and Location

The SLA application has tabs to specify Assets, CIs and Locations but there is no way to view SLAs associated with those objects from the objects themselves.
about 12 years ago in IBM MAS - Manage (Base) 2 Not under consideration

Import Junit xml of test results

The junit xml representation of a test result has become a standard in testing frameworks.When a test is run via adapter, the corresponding test framework may produce a junit xml report and this result should be imported be RQM and shown in a huma...
about 4 years ago in IBM Engineering - Test Management / Test Execution 0 Not under consideration

Lightweight Checkout Feature is required in Jenkins RTC plugin

Enhancement IBM Description: Jenkins Build Configuration We are maintaining a separate component for storing Jenkins Files in RTC.We are trying to use Lightweight Checkout Option(Pipeline Script contents directly from SCM without performing full c...
about 4 years ago in IBM Engineering - Workflow Management / Enterprise Extensions 3 Not under consideration

Need to be able to use reporting service to show links between Test Plans and Module Views

Currently if you link a Test Plan to a module view there is no way in the Reporting Service to show the trace between the Test plan and the Module View. It simply shows NO relationship not even to the module that the view is part of. This is a cri...
about 2 years ago in IBM Engineering - Requirements Management DOORS Next / Usability 0 Future consideration

Diagram data should be exported in a format that is compatible with other ReqIF tools

Currently the content of 'Diagram' type artifacts is exported in a tool-specific format, which is understood by DNG only. The diagram data should be provided in a compatible format, e.g. as embedded images of type PNG as specified by the ReqIF sta...
about 6 years ago in IBM Engineering - Requirements Management DOORS Next / Feature 4 Not under consideration

[Shifts] Tasks must always be scheduled in the original scheduled shift (Team continuity)

After the first operation of a task is scheduled in one shift, the rest of the task must always be scheduled in that initial shift.
about 2 years ago in IBM MAS - Scheduler 0 Future consideration

[Optim Result] Avoid few (specific threshold) scheduled job for: Specific craft, specific A/C (Multiline) & specific zone

Avoid scheduling small quantity of jobs for specific craft, A/C or Zone to avoid movement or bussiness incoherencies.
about 2 years ago in IBM MAS - Scheduler 0 Future consideration

[Dependencies] Improve Auto relax of dependencies due to actuals when specific job is advanced

If an isolated task, that was planned for the future is advanced (due to some unplanned bussiness requirements), it results in a relaxation of all their predecessors (direct or inherited).
about 2 years ago in IBM MAS - Scheduler 0 Future consideration

[Craft] Activities/Operations with flexible craft

Some operations will have no specific requirement for craft. They can be done by any available craft at the time of scheduling.
about 2 years ago in IBM MAS - Scheduler 1 Future consideration