Skip to Main Content
IBM Sustainability Software - Ideas Portal


This portal is to open public enhancement requests against the products and services belonging to IBM Sustainability Software. To view all of your ideas submitted to IBM, create and manage groups of Ideas, or create an idea explicitly set to be either visible by all (public) or visible only to you and IBM (private), use the IBM Unified Ideas Portal (https://ideas.ibm.com).


Shape the future of IBM!

We invite you to shape the future of IBM, including product roadmaps, by submitting ideas that matter to you the most. Here's how it works:

Search existing ideas

Start by searching and reviewing ideas and requests to enhance a product or service. Take a look at ideas others have posted, and add a comment, vote, or subscribe to updates on them if they matter to you. If you can't find what you are looking for,

Post your ideas
  1. Post an idea.

  2. Get feedback from the IBM team and other customers to refine your idea.

  3. Follow the idea through the IBM Ideas process.


Specific links you will want to bookmark for future use

Welcome to the IBM Ideas Portal (https://www.ibm.com/ideas) - Use this site to find out additional information and details about the IBM Ideas process and statuses.

IBM Unified Ideas Portal (https://ideas.ibm.com) - Use this site to view all of your ideas, create new ideas for any IBM product, or search for ideas across all of IBM.

ideasibm@us.ibm.com - Use this email to suggest enhancements to the Ideas process or request help from IBM for submitting your Ideas.

ADD A NEW IDEA

Pinned ideas

PINNED Power BI capability alignment between Desktop vs embedded solution
Requesting Customer: Fraser Property but this would benefit all customers using Envizi Power BI capability Business Impact: The Frasers Property Team have recently explored the use of the embeded PowerBI functionality and have found that there are...
PINNED Enable inventory reservation automatic cron task for specific site
Advantage : Enable the cron for specific site which is necessary. Summary: In Maximo, we have more than 50 Active sites. When we try to enable inventory reservation automatic cron task for specific site, There is no Cron Parameters are available....

All ideas

Showing 5322

work centers - map voice or speech to text for work order tracking

work centers - map speech to text for work order tracking. Users leverage devices to detect voice/speech to text for filling out work order details.
about 5 years ago in IBM MAS - Spatial 0 Planned for future release

Enabling the "View Status History" funnctionality for non calibration assets

When the Status of an Asset is changed, it is not writing to the Asset Status table - View Status History is blank. The "View Status History" functionality does not appear to be enabled for non calibration assets.
over 10 years ago in IBM MAS - Utilities 1 Functionality already exists

Flight Data in FLB application has not draft status

In Flight Log Book application, when adding a new Flight Data, only status active is allowed (plus closed). In this status, departure and arrival time or meter readings introduced are applied to the aircraft or assets. We would like to have the po...
about 5 years ago in IBM MAS - Aviation 0 Future consideration

Give stylesheet control over font face when publishing from DNG using RRDG

I need to have control over the font face that is published from DNG when using the More Actions > Generate Report for View feature in the DNG web UI. Right now, the advanced DNG property publish.Font determines the font face of all published d...
about 5 years ago in IBM Engineering - Requirements Management DOORS Next / Feature 3 Not under consideration

Artifact and configuration context-sensitive reporting from RQM Web UI

Like DNG users are able to publish from the web UI using uploaded Rational Publishing Engine templates and those reports are automatically configured for the current DNG module and the current configuration context, I would like RQM to provide a w...
about 5 years ago in IBM Engineering - Test Management / Reporting 2 Not under consideration

RQM Browse List - Needs Ability to Update Lock Attribute in Bulk

We need to be able to lock or unlock multiple artifacts in the Browse list view.
about 5 years ago in IBM Engineering - Test Management / Usability 2 Not under consideration

Need ability to exclude common jobs from Repeat and Recent Repairs

Common tasks that are regullarly repeated should have an option to allow them to be excluded for Repeat and Recent repairs.
over 10 years ago in IBM MAS - Transportation 1 Future consideration

Restrict who can apply e-Signatures to DNG baselines

In DNG v 6.0.6 iFix004 we now can setup e-signatures of project baselines. Even though it is featured that more than one user can e-sign, customer requests the ability to restrict who can e-sign.
about 5 years ago in IBM Engineering - Requirements Management DOORS Next / Feature 3 Not under consideration

Audit Trail for Changes to Test Result

For Test Results, we need the ability to capture changes made to any data entered in the Test Result after the fact. If any user would update a test step pass/fail, or attachment, or Actual Result entry either after execution is complete or going ...
about 5 years ago in IBM Engineering - Test Management / Usability 3 Not under consideration

JAS Authentication authenticates via pop-up

This RFE is regarding JAS When connecting Jazz applications with JAS, all (re-)authentication is done using pop-ups.This has several disadvantages:- if a pop-up blocker is enabled these authentication method cannot be performed- if you have a "lon...
about 5 years ago in IBM Engineering - Foundation/Common Services / Unassigned 5 Not under consideration