Skip to Main Content
IBM Sustainability Software - Ideas Portal


This portal is to open public enhancement requests against the products and services belonging to IBM Sustainability Software. To view all of your ideas submitted to IBM, create and manage groups of Ideas, or create an idea explicitly set to be either visible by all (public) or visible only to you and IBM (private), use the IBM Unified Ideas Portal (https://ideas.ibm.com).


Shape the future of IBM!

We invite you to shape the future of IBM, including product roadmaps, by submitting ideas that matter to you the most. Here's how it works:

Search existing ideas

Start by searching and reviewing ideas and requests to enhance a product or service. Take a look at ideas others have posted, and add a comment, vote, or subscribe to updates on them if they matter to you. If you can't find what you are looking for,

Post your ideas
  1. Post an idea.

  2. Get feedback from the IBM team and other customers to refine your idea.

  3. Follow the idea through the IBM Ideas process.


Specific links you will want to bookmark for future use

Welcome to the IBM Ideas Portal (https://www.ibm.com/ideas) - Use this site to find out additional information and details about the IBM Ideas process and statuses.

IBM Unified Ideas Portal (https://ideas.ibm.com) - Use this site to view all of your ideas, create new ideas for any IBM product, or search for ideas across all of IBM.

ideasibm@us.ibm.com - Use this email to suggest enhancements to the Ideas process or request help from IBM for submitting your Ideas.

ADD A NEW IDEA

Pinned ideas

PINNED Enable inventory reservation automatic cron task for specific site
Advantage : Enable the cron for specific site which is necessary. Summary: In Maximo, we have more than 50 Active sites. When we try to enable inventory reservation automatic cron task for specific site, There is no Cron Parameters are available....
PINNED Power BI capability alignment between Desktop vs embedded solution
Requesting Customer: Fraser Property but this would benefit all customers using Envizi Power BI capability Business Impact: The Frasers Property Team have recently explored the use of the embeded PowerBI functionality and have found that there are...

All ideas

Showing 5797 of 5797

Improper multiplication of a Timeline item in RQM reports

When accessing the reports menu in RQM, the Iteration listing of the Timeline is displaying replications of the same name, with only one iteration with that name registered. Clicking on a Test Plan multiplies the multiplication. Correction is requ...
about 6 years ago in IBM Engineering - Test Management / Integrations 3 Not under consideration

Reduce the number of steps for Merge Operation

The Merge Operation has too many steps/clicks making it user unfriendly
about 6 years ago in IBM Engineering - Test Management / Usability 1 Not under consideration

Ability to create multiple standard contracts at one time

Ability to create multiple standard contracts at one time by using a tool (such as Excel or a portal within Tririga) to prepare multiple records at once, have an error validation, and then finally create the records in mass
about 6 years ago in IBM TRIRIGA Capital Projects Management 2 Future consideration

Need to be able to add additional columns (All attributes) for test Cases section under the Test Suite Perspective

Problem description:Test Cases viewed from Test plans give an option to add additional columns for all custom attributes and categories.Test Cases when viewed from Test Suites does not allow custom attributes and categories but only allows 11 buil...
about 6 years ago in IBM Engineering - Test Management / Usability 1 Not under consideration

Track Joint Use poles and billing

Utilities need to track joint use attachments and billing charges for their poles and for their attachments to other poles.
about 12 years ago in IBM MAS - Utilities 2 Future consideration

RQM Reports / Queries - One line description

Description column /field able to enable /visible in filter for Test Artifacts (Test Plan, Test Case, Test Scripts etc, )in RQM
about 6 years ago in IBM Engineering - Test Management / Reporting 2 Not under consideration

Enhancement of RQM Command Line Adapter

When use the Command Line Adapter for automated testing, only the Test Case result code can be returned to RQM along with a attachment from test execution console. There are no Test Steps and respective result code/actual result available in RQM.
about 6 years ago in IBM Engineering - Test Management / Usability 2 Not under consideration

Add an option to DNG to Reqif export empty / blank values like in DOORS

Users are transferring Reqif files to other teams or suppliers regularly. If an artifact's attribute has to be reset, an empty value is assigned to this attribute. However, as DNG does not include empty attribute in the Reqif export file, when the...
about 6 years ago in IBM Engineering - Requirements Management DOORS Next / Feature 3 Not under consideration

Add domains to spec fields on Asset List tab.

Add domains to spec fields on Asset List tab. User can't bring up a lookup domain that's associated with the specification from the List tab.
about 12 years ago in IBM MAS - Manage (Base) 1 Not under consideration

Query Based Detail Report page breaks cause report to take many pages

In Maximo 7.1.1.5 we could create query based reports that linked to the Planned Labor table to show crafts, and it would display all of the records on a single page or just a few without unnecessary page breaks. Now in Maximo 7.5.0.2, we have to ...
over 12 years ago in IBM MAS - Manage (Base) 2 Not under consideration