Skip to Main Content
IBM Sustainability Software - Ideas Portal


This portal is to open public enhancement requests against the products and services belonging to IBM Sustainability Software. To view all of your ideas submitted to IBM, create and manage groups of Ideas, or create an idea explicitly set to be either visible by all (public) or visible only to you and IBM (private), use the IBM Unified Ideas Portal (https://ideas.ibm.com).


Shape the future of IBM!

We invite you to shape the future of IBM, including product roadmaps, by submitting ideas that matter to you the most. Here's how it works:

Search existing ideas

Start by searching and reviewing ideas and requests to enhance a product or service. Take a look at ideas others have posted, and add a comment, vote, or subscribe to updates on them if they matter to you. If you can't find what you are looking for,

Post your ideas
  1. Post an idea.

  2. Get feedback from the IBM team and other customers to refine your idea.

  3. Follow the idea through the IBM Ideas process.


Specific links you will want to bookmark for future use

Welcome to the IBM Ideas Portal (https://www.ibm.com/ideas) - Use this site to find out additional information and details about the IBM Ideas process and statuses.

IBM Unified Ideas Portal (https://ideas.ibm.com) - Use this site to view all of your ideas, create new ideas for any IBM product, or search for ideas across all of IBM.

ideasibm@us.ibm.com - Use this email to suggest enhancements to the Ideas process or request help from IBM for submitting your Ideas.

ADD A NEW IDEA

Pinned ideas

PINNED Enable inventory reservation automatic cron task for specific site
Advantage : Enable the cron for specific site which is necessary. Summary: In Maximo, we have more than 50 Active sites. When we try to enable inventory reservation automatic cron task for specific site, There is no Cron Parameters are available....

IBM MAS - Manage (Base)

Showing 948

Type Ahead hardcoded limit of 10000 should be configurable

Currently the Type Ahead limit is hard coded to 10000 records so we cannot use it effectively on the Locations and Asset fields as we have more than 10000 records. At times users don't find the record in the type ahead thus loosing confidence in t...
over 1 year ago in IBM MAS - Manage (Base) / System Admin Config/Security 3 Not under consideration

PlusCDueDate calcluation to be corrected

Current calculation for PlusCDueDate is 1. Retrieves all WOs where WorkOrder.AssetNum = ToolTrans.RotAssetNum (note: NOT ToolTrans.AssetNum) WorkOrder.Status != ‘CLOSED', 'COMPLETED', or ‘CANCELED' WorkOrder.WorkType = ‘CAL' or a synonym of ‘CA...
over 6 years ago in IBM MAS - Manage (Base) 1 Future consideration

Work planning/scheduling should consider technician qualification

When trying to select the resource to do a job, this needs to be done at a qualifications level. For example, a Technician may have completed/obtained some of the training and qualifications of a high er level and that person should ultimately be ...
over 1 year ago in IBM MAS - Manage (Base) / Asset/Work Management 0 Planned for future release

Combine Take Ownership and Stop Workflow Actions

Combine the 'Take Ownership' and 'Stop Workflow' actions into either a new action or in the Take Ownership action for Work Orders in the Work Order Tracking app.
over 1 year ago in IBM MAS - Manage (Base) / Asset/Work Management 2 Not under consideration

Enhancement/Fix required to prevent duplicate active WF process to avoid creating duplicate assignments for same record.

Enhancement / Fix required to prevent duplicate active workflow process and duplicate workflow assignments for the same record in Maximo workflow(any application).
almost 4 years ago in IBM MAS - Manage (Base) 3 Not under consideration

Master PMs - should be able to standardize all the fields in a PM

We create a master template to be able to standardize and speed up the process. However, not all the fields in a PM are available on the Master PM, so each PM still requires a fair amount of editing before making active. For example, the 3 frequen...
over 2 years ago in IBM MAS - Manage (Base) / Asset/Work Management 0 Future consideration

Add as Spare Part to Asset Template

There's currently a checkbox in Item Master to add a part to the Asset's Spare Parts list when issued to a Work Order w/ an Asset. However, we are trying to manage our Assets' Spare Parts list via Asset Templates. It would make more sense that whe...
over 2 years ago in IBM MAS - Manage (Base) / Asset/Work Management 0 Future consideration

Ability to minimize or maximize a section as per user’s preference

As per standard Maximo functionality, option is available to minimize a section within an application by a user to hide the fields that they may not use. Currently users can minimize or maximize the sections and continue working within the applica...
over 1 year ago in IBM MAS - Manage (Base) / Asset/Work Management 1 Not under consideration

How to register Problem-Cause-Remedy on a WO having multiple Assets

Being the contractor's technician or the Asset Operation Manager, I need to be able to report different sets of Problem-Cause-Remedy on assets on my multi-asset WOs, so that I can ensure that later defect analysis will be based on valid data and d...
over 2 years ago in IBM MAS - Manage (Base) / Asset/Work Management 0 Future consideration

Keeping DB Backup for extended period of time (beyond 1 month) automatically.

This is an Ask from our client. It is useful for the below reason: 1. Investigate any data issue by restoring the older backup, if it is not traceable when it was introduced. 2. Restore lower environment with older backup (say 6 month old). 3. Bui...
over 1 year ago in IBM MAS - Manage (Base) / Asset/Work Management 1 Future consideration