Skip to Main Content
IBM Sustainability Software - Ideas Portal


This portal is to open public enhancement requests against the products and services belonging to IBM Sustainability Software. To view all of your ideas submitted to IBM, create and manage groups of Ideas, or create an idea explicitly set to be either visible by all (public) or visible only to you and IBM (private), use the IBM Unified Ideas Portal (https://ideas.ibm.com).


Shape the future of IBM!

We invite you to shape the future of IBM, including product roadmaps, by submitting ideas that matter to you the most. Here's how it works:

Search existing ideas

Start by searching and reviewing ideas and requests to enhance a product or service. Take a look at ideas others have posted, and add a comment, vote, or subscribe to updates on them if they matter to you. If you can't find what you are looking for,

Post your ideas
  1. Post an idea.

  2. Get feedback from the IBM team and other customers to refine your idea.

  3. Follow the idea through the IBM Ideas process.


Specific links you will want to bookmark for future use

Welcome to the IBM Ideas Portal (https://www.ibm.com/ideas) - Use this site to find out additional information and details about the IBM Ideas process and statuses.

IBM Unified Ideas Portal (https://ideas.ibm.com) - Use this site to view all of your ideas, create new ideas for any IBM product, or search for ideas across all of IBM.

ideasibm@us.ibm.com - Use this email to suggest enhancements to the Ideas process or request help from IBM for submitting your Ideas.

ADD A NEW IDEA

IBM MAS - Oil & Gas / HSE

Showing 16

RBI Support for API 581

Risk-Based Inspection as per API 581 standard is required for O&G industry. Can this be added in the future release?
about 14 hours ago in IBM MAS - Oil & Gas / HSE 0 Submitted

Add a Simple Pre Job Brief / Toolbox talk capability that isn't through the permit that works on Mobile

Not all work orders require a permit but may require a toolbox talk before work begins. Maximo should have the ability to record a toolbox talk that is associated directly to the work order or independent of the work order. This should be availabl...
3 months ago in IBM MAS - Oil & Gas / HSE 0 Planned for future release

Allow non Template Certificates to be used on PMs

Our HSE Group has decided to use Certificates as a central reference to tie the PM's and work orders together at a higher level. This way many PM's can be tied to one Certificate. By doing this we removed the out of the box domain on PM's and work...
2 months ago in IBM MAS - Oil & Gas / HSE 0 Planned for future release

Maximo GenAI operator for troubleshooting oil and gas plants

It is a AI expert system where the RAG generative AI technology can assist the human operator in discovering the plant's units issues and resolve them with least impact on the operational and production costs.
4 months ago in IBM MAS - Oil & Gas / HSE 2 Future consideration

Emissions Management - Location Meters - To be able to enter Specification Details for continuous emissions as you can do for fugitive emissions.

In Emissions Management there are two streams Fugitive (Incident Events) and Continuous (Location Meters) which are likely to share the same set of classifications. In Incidents you can enter the Specification values for an Incident Event, but whi...
6 months ago in IBM MAS - Oil & Gas / HSE 0 Future consideration

Enable PM Revisions similar to Job Plans

Enable Revision on PMs in the same way as revisions exist on Job Plans
over 9 years ago in IBM MAS - Oil & Gas / HSE 1 Planned for future release

Digital Gas compressor converting of gas into liquid state Using appropriate pressure application

Digital heavy duty highly efficient gas compressor converting gas into liquid state under high pressure application for efficient storage in container for easy transportation etc For gas conversion application into liquid state like hydrogen, prop...
about 1 year ago in IBM MAS - Oil & Gas / HSE 1 Not under consideration

PERMITVALIDITY in PLUSGPERMITWORK table should be Decimal

Our client is a Transmission Line company and they are issuing Permits in minutes instead of Hours. e.g. 1 hour 15 mins. The PERMITVALIDITY field in PLUSGPERMITWORK table is of type Integer and thus does not allow entering minutes. Since the line ...
over 3 years ago in IBM MAS - Oil & Gas / HSE 1 Future consideration

Maximo People Delegate

The delegate function from the assigned to the People's application should be assigned the rights of the Person the delegate is holding or acting in the position for. The Group can be a identified as a field in the people's application; current de...
almost 4 years ago in IBM MAS - Oil & Gas / HSE 1 Future consideration

Remove or Modify Error Message for Location Change on MOC (HSE)

Many companies do not use the Safety Critical fields on the Locations and/or MOC objects in Maximo. Having an erroneous message (BMXAO0558E) indicating that these fields will be overwritten, without any method to suppress the warning causes confus...
over 1 year ago in IBM MAS - Oil & Gas / HSE 0 Planned for future release