Skip to Main Content
IBM Sustainability Software - Ideas Portal


This portal is to open public enhancement requests against the products and services belonging to IBM Sustainability Software. To view all of your ideas submitted to IBM, create and manage groups of Ideas, or create an idea explicitly set to be either visible by all (public) or visible only to you and IBM (private), use the IBM Unified Ideas Portal (https://ideas.ibm.com).


Shape the future of IBM!

We invite you to shape the future of IBM, including product roadmaps, by submitting ideas that matter to you the most. Here's how it works:

Search existing ideas

Start by searching and reviewing ideas and requests to enhance a product or service. Take a look at ideas others have posted, and add a comment, vote, or subscribe to updates on them if they matter to you. If you can't find what you are looking for,

Post your ideas
  1. Post an idea.

  2. Get feedback from the IBM team and other customers to refine your idea.

  3. Follow the idea through the IBM Ideas process.


Specific links you will want to bookmark for future use

Welcome to the IBM Ideas Portal (https://www.ibm.com/ideas) - Use this site to find out additional information and details about the IBM Ideas process and statuses.

IBM Unified Ideas Portal (https://ideas.ibm.com) - Use this site to view all of your ideas, create new ideas for any IBM product, or search for ideas across all of IBM.

ideasibm@us.ibm.com - Use this email to suggest enhancements to the Ideas process or request help from IBM for submitting your Ideas.

ADD A NEW IDEA

Asset/Work Management

Showing 191 of 5785

Add a "Cancel" status for Inspection results.

If for some reason an Inspection is not able to be completed, it remains in In Progress forever. The only way for an Inspection result to go from In Progress to Completed is if all the required questions are answered. If that is not possible, the ...
over 2 years ago in IBM MAS - Manage (Base) / Asset/Work Management 0 Functionality already exists

Extended drilldown – add possibilty to configure classstructure into it / show tree of assets

Problem The extended drilldown is a good tool to get a hierarchical overview about data. But it has limited options to show information in tree do easily navigate & identify different data. Additionally, when extended drilldown is opened in ap...
4 months ago in IBM MAS - Manage (Base) / Asset/Work Management 2 Not under consideration

Condition Monitoring UI should have option to auto generate WO or not to check box when open WO exists

When adding a point, you should have a simple check box that will allow users to check it if they want the work order to generate if an existing work order exists for that point. Right now the CRON will generate regardless unless you script. Using...
7 months ago in IBM MAS - Manage (Base) / Asset/Work Management 1 Not under consideration

Spare Part Auto Add should not add a part when the issue type is 'RETURN'

Spare Part Auto Add function appears to add parts even when the issue type is 'RETURN' and it should not. When issue is errant and someone goes to fix the asset spare part manually, but someone else later returns the part, the RETURN transaction w...
over 1 year ago in IBM MAS - Manage (Base) / Asset/Work Management 1 Future consideration

Manage Inspection Forms - The system should allow you to create a checklist type form to perform walk through inspections

There are many scenarios where a checklist (table) format inspection can be utilized. Housekeeping uses a Check list to mark if specific tasks were done in a particular day of the week.
over 1 year ago in IBM MAS - Manage (Base) / Asset/Work Management 0 Future consideration

Work Orders (RBA) - Remove the filter field reference to WORKORDERID

In the Work Orders Role Based Application you come to a List view of your work orders and the Filter row is open. On the far-right side next to the Type column header is a filter button that opens a panel on the right. The fields displayed in the ...
5 months ago in IBM MAS - Manage (Base) / Asset/Work Management 0 Planned for future release

Reset units to go on a PM

In the current Maximo configuration, preventive maintenance (PM) work orders can be generated based on a meter based frequency (e.g., every 1500 hours). Some of these PMs are used to change parts at these set frequencies to ensure machine uptime...
5 months ago in IBM MAS - Manage (Base) / Asset/Work Management 0 Future consideration

Maximo needs a Job Plan Central Library

Job Plan Central Library that will include the following requirements:  The definition of a mechanism to create a Central Job Plan Library in Maximo  Ability to assemble Model level Job plans by including sub job plans from library (Similar to ...
over 2 years ago in IBM MAS - Manage (Base) / Asset/Work Management 0 Future consideration

Work Orders (RBA) should show the status with the scrolling set of status memos, memos without the status will be difficult to interpret

In the Work Orders role-based application and when viewing a work order you can change status through the action or by clicking the status bar. The dialog that opens shows a vertical scrolling set of previous status memos with the person who chang...
5 months ago in IBM MAS - Manage (Base) / Asset/Work Management 0 Planned for future release

Allow the ability to create organization or site specific Master PMs

Job Plans could be defined at the System, Organization or Site level but Master PMs are only defined at the System level and therefore, it is not possible to add organization-specific or site-specific Job Plan to a Master PM. This deprives many co...
over 1 year ago in IBM MAS - Manage (Base) / Asset/Work Management 1 Not under consideration