Skip to Main Content
IBM Sustainability Software - Ideas Portal


This portal is to open public enhancement requests against the products and services belonging to IBM Sustainability Software. To view all of your ideas submitted to IBM, create and manage groups of Ideas, or create an idea explicitly set to be either visible by all (public) or visible only to you and IBM (private), use the IBM Unified Ideas Portal (https://ideas.ibm.com).


Shape the future of IBM!

We invite you to shape the future of IBM, including product roadmaps, by submitting ideas that matter to you the most. Here's how it works:

Search existing ideas

Start by searching and reviewing ideas and requests to enhance a product or service. Take a look at ideas others have posted, and add a comment, vote, or subscribe to updates on them if they matter to you. If you can't find what you are looking for,

Post your ideas
  1. Post an idea.

  2. Get feedback from the IBM team and other customers to refine your idea.

  3. Follow the idea through the IBM Ideas process.


Specific links you will want to bookmark for future use

Welcome to the IBM Ideas Portal (https://www.ibm.com/ideas) - Use this site to find out additional information and details about the IBM Ideas process and statuses.

IBM Unified Ideas Portal (https://ideas.ibm.com) - Use this site to view all of your ideas, create new ideas for any IBM product, or search for ideas across all of IBM.

ideasibm@us.ibm.com - Use this email to suggest enhancements to the Ideas process or request help from IBM for submitting your Ideas.

ADD A NEW IDEA

Clear

Ideas

Showing 25 of 7035

Create a more complete view that presents at the same time the information of "Sand Box - Repository Workspace - Stream"

Create a more complete view that presents at the same time the information of "Workspace - Repository Workspace - Stream" Information to display: Object Name, Repository Workspace Name, Stream Name, version in RW, Version in Stream, Creation Datet...
about 1 year ago in IBM Engineering - Workflow Management / Unassigned 2 Not under consideration

Provide more granular loading options, at the Station and CU level

Currently we can only identify loading at the VERSION level. This does not provide the granularity needed. Request that the ability to select different LOADING at both the STATION and CU line level.
almost 5 years ago in IBM MAS - Utilities 1 Future consideration

Groups of Persons (e.g. CCB Members) Shall Be Pre-Defineable

Fields, which require the input of multiple persons (eg. CCB Team Members) must be able to handle pre-defined sets (e.g. teams) .Reason: Efficiency. Avoid the input of the same people for each singe item.
about 6 years ago in IBM Engineering - Workflow Management / Unassigned 3 Not under consideration

freeze the header and first 3 columns like the function available in Excel

We have many requests for freeze the header and first 3 columns our Maximo Asset Management. When there are a lot of rows and columns, the column titles and AssetNum are not visible when scrolling, which makes it difficult to use. Freeze the hea...
almost 4 years ago in IBM MAS - Utilities 1 Not under consideration

Better controls over Kanban Cycle Time, Lead Time calcuations

Capability Needed: The ability to configure the specific events that cause cycle time calculation to begin and end. Also need to specify separate events for lead time calculation.
over 4 years ago in IBM Engineering - Workflow Management / Unassigned 5 Future consideration

CUE - Contractor Pricing Should allow outside labor costs to vary with the filter values just as internal labor

Currently there is no easy way to support estimating outside labor costs when the field conditions change. For example, when digging in rocky soil, the filter values can be used to add additional cost for the additional labor required for this sit...
about 13 years ago in IBM MAS - Utilities 1 Not under consideration

I would like to create a report to show a relationship between a plan in EWM, a requirement collection in Doors Next and a Test Plan in ETM.

I would like to create a report to show a relationship between a plan in Engineering Workflow Management, a requirement collection in Doors Next and a Test Plan in Engineering Test Management.
over 3 years ago in IBM Engineering - Workflow Management / Unassigned 6 Future consideration

Language Enable Compound Value List Tables

System: Compound Value List Header and List TablesActors: System Administrators & End Users In a multi-language enterprise installation where compound value lists are used users can only see base language descriptions of field entries since th...
over 9 years ago in IBM MAS - Utilities 0 Not under consideration

CU Estimating – Compatible Units Sub-Tab / Excessive Entry Required for Station, etc. (18392 033 000 / 20110908-05)

Prior to T&D 7.1.1, the Compatible Units sub-tab consisted of a Work Sets table and a Compatible Units table. When adding a row to the Compatible Units table, the Station and Work Set would default to the values from the highlighted row on the...
about 14 years ago in IBM MAS - Utilities 3 Not under consideration

Enabling the "View Status History" funnctionality for non calibration assets

When the Status of an Asset is changed, it is not writing to the Asset Status table - View Status History is blank. The "View Status History" functionality does not appear to be enabled for non calibration assets.
almost 12 years ago in IBM MAS - Utilities 1 Functionality already exists