Skip to Main Content
IBM Sustainability Software - Ideas Portal


This portal is to open public enhancement requests against the products and services belonging to IBM Sustainability Software. To view all of your ideas submitted to IBM, create and manage groups of Ideas, or create an idea explicitly set to be either visible by all (public) or visible only to you and IBM (private), use the IBM Unified Ideas Portal (https://ideas.ibm.com).


Shape the future of IBM!

We invite you to shape the future of IBM, including product roadmaps, by submitting ideas that matter to you the most. Here's how it works:

Search existing ideas

Start by searching and reviewing ideas and requests to enhance a product or service. Take a look at ideas others have posted, and add a comment, vote, or subscribe to updates on them if they matter to you. If you can't find what you are looking for,

Post your ideas
  1. Post an idea.

  2. Get feedback from the IBM team and other customers to refine your idea.

  3. Follow the idea through the IBM Ideas process.


Specific links you will want to bookmark for future use

Welcome to the IBM Ideas Portal (https://www.ibm.com/ideas) - Use this site to find out additional information and details about the IBM Ideas process and statuses.

IBM Unified Ideas Portal (https://ideas.ibm.com) - Use this site to view all of your ideas, create new ideas for any IBM product, or search for ideas across all of IBM.

ideasibm@us.ibm.com - Use this email to suggest enhancements to the Ideas process or request help from IBM for submitting your Ideas.

ADD A NEW IDEA

Pinned ideas

PINNED Power BI capability alignment between Desktop vs embedded solution
Requesting Customer: Fraser Property but this would benefit all customers using Envizi Power BI capability Business Impact: The Frasers Property Team have recently explored the use of the embeded PowerBI functionality and have found that there are...
PINNED Enable inventory reservation automatic cron task for specific site
Advantage : Enable the cron for specific site which is necessary. Summary: In Maximo, we have more than 50 Active sites. When we try to enable inventory reservation automatic cron task for specific site, There is no Cron Parameters are available....

All ideas

Showing 5796

Inconsistency in the functionality of Save/Submit work order button when the estimated duration field is made mandatory.

Hello team, When the Estimated duration field is made mandatory in the Create work order and edit work order pages, we see that in the Create WO page the "Save" button is disabled when the Estimated Duration field is removed (made blank), where as...
6 months ago in IBM MAS - Mobile 0 Planned for future release

Support OpenID Connect for federated authentication

For those using Azure Active Directory (AAD) for federated identity and seamless single sign on because of a multi-domain setup, we need to use a more modern authentication protocol than SAML, the OpenID Connect protocol based on OAuth2 is the mos...
about 2 years ago in IBM MAS - Common Services 0 Planned for future release

OCL verification support

Users can write their constraints by OCL(Object Contraint Language) on Contraint model for their model.However, they can't do verification of their models by their constraints.I want Rhapsody support to do verification of their models by constrain...
about 4 years ago in IBM Engineering - Systems Design Rhapsody/RMM / Modeling and UI 0 Future consideration

Limit the Read capability of the ELM applications within a Project Area

NNPP as a customer would like to enhance the visibility and access control on Finer Grain Components. In other words, limit the Read capability of the ELM applications within a Project Area. 1. Improve Usability and Navigation in the Application “...
6 months ago in IBM Engineering - Requirements Management DOORS Next / Feature 0 Future consideration

More finely grained application of Roles and Permissions for artifacts and associated attributes to protect content from "unauthorized" editing.

This would allow the protection of specific content in DNG to the benefit of the team members working in the tool. Protection of "Content" and attributes from inadvertant (or intentional) changes by "unauthorized" team members by role would be des...
over 1 year ago in IBM Engineering - Requirements Management DOORS Next / Usability 0 Future consideration

System Messages Available in Mobile

I would like System messages that I have tied to automation scripts in native Maximo to pop up as they do in the web-application in EAM Maximo Mobile. It would help our process a lot, allowing for a better user experience, better data coming from ...
3 months ago in IBM MAS - Mobile 1 Not under consideration

Asset Inventory Moves - Ability to perform mass move of rotating assets between bins within a storeroom or between storerooms and bins.

Why?Today the process of moving assets from bin to bin within in a storeroom or even between storerooms is a 1 by 1 asset process. This is very time consuming. Who benefits?The customers that benefit most are those that use the inventories to mana...
3 months ago in IBM MAS - Manage (Base) / Supply Chain 1 Needs more information

An API access token can be used by multiple people instead of a API access token per person so a report using an API can be refreshed by multiple people but cannot be accessed by someone who has left the organisation.

The new API access tokens have been introduced to replace the previous method of a username and password. My understanding is that: Each user should have their own API access tokens If that user leaves the organisation then by disabling that user ...
3 months ago in IBM Envizi - ESG Suite / Base Platform 1 Functionality already exists

Allow Openvino support

We would like to request using Openvino to allow lower powered devices the ability to use MVI without a NVidia GPU. We understand there will be less performance but for simple small tasks that might be fine.
3 months ago in IBM MAS - Visual Inspection / MVI Edge 0

When Asset Costing is used the work/job plan material should have the option of how to derive the unit cost

Currently when asset costing is used the work plan materials unit cost will be zero even if all the rotating assets in the storeroom have the same inventory cost. A unit cost should be added (it can easily be missed by the planner) otherwise you a...
3 months ago in IBM MAS - Manage (Base) / Asset/Work Management 2 Future consideration