Skip to Main Content
IBM Sustainability Software - Ideas Portal


This portal is to open public enhancement requests against the products and services belonging to IBM Sustainability Software. To view all of your ideas submitted to IBM, create and manage groups of Ideas, or create an idea explicitly set to be either visible by all (public) or visible only to you and IBM (private), use the IBM Unified Ideas Portal (https://ideas.ibm.com).


Shape the future of IBM!

We invite you to shape the future of IBM, including product roadmaps, by submitting ideas that matter to you the most. Here's how it works:

Search existing ideas

Start by searching and reviewing ideas and requests to enhance a product or service. Take a look at ideas others have posted, and add a comment, vote, or subscribe to updates on them if they matter to you. If you can't find what you are looking for,

Post your ideas
  1. Post an idea.

  2. Get feedback from the IBM team and other customers to refine your idea.

  3. Follow the idea through the IBM Ideas process.


Specific links you will want to bookmark for future use

Welcome to the IBM Ideas Portal (https://www.ibm.com/ideas) - Use this site to find out additional information and details about the IBM Ideas process and statuses.

IBM Unified Ideas Portal (https://ideas.ibm.com) - Use this site to view all of your ideas, create new ideas for any IBM product, or search for ideas across all of IBM.

ideasibm@us.ibm.com - Use this email to suggest enhancements to the Ideas process or request help from IBM for submitting your Ideas.

ADD A NEW IDEA

Pinned ideas

PINNED Enable inventory reservation automatic cron task for specific site
Advantage : Enable the cron for specific site which is necessary. Summary: In Maximo, we have more than 50 Active sites. When we try to enable inventory reservation automatic cron task for specific site, There is no Cron Parameters are available....
PINNED Power BI capability alignment between Desktop vs embedded solution
Requesting Customer: Fraser Property but this would benefit all customers using Envizi Power BI capability Business Impact: The Frasers Property Team have recently explored the use of the embeded PowerBI functionality and have found that there are...

All ideas

Showing 6079

Allow Web links to be added as attachments

For some users web links are the primary way that they attach documents, especially if they are using sharepoint or other document management systems.
3 months ago in IBM MAS - Mobile 1 Future consideration

We'd like to be able to use PowerReports with updated data in real time

We have been using PowerReports for reporting and find them helpful, but not having them update for 24 hours after the underlying data is updated is very frustrating and slows down our process greatly.
10 months ago in IBM Envizi - ESG Suite / Base Platform 3 Not under consideration

Be able to move test executions retrospectively

The idea is to be able to move test executions retrospectively. For example after a standalone execution, into a specific test plan or into a specific test suite execution record. This is needed so that test suite execution report (for example)is ...
10 months ago in IBM Engineering - Test Management / Test Execution 0 Future consideration

Usage of PUB scrips in RPE by scriptname and not by ID

If you are going to use javascript from PUB (assets --> scripts) in RPE the you can add a javascript with content similar to that: <Script src= "library://api/scripts/104"></Script>. Unfortunately you have to use the key instead of ...
almost 2 years ago in IBM Engineering - Lifecycle Optimization Publishing / Unassigned 6 Future consideration

PM Forecasts do not reflect Dynamic

It seems the PM Forecasts remain being calculated as static. I tested it with two PMs having the same Job Plan assigned to it, with different Total Work Units assigned on Job Plan Sequence. Forecast Costs, when calculated, came up as identical.Her...
over 4 years ago in IBM MAS - Manage (Base) 3 Future consideration

Improve runtime visibility of Repotools scripts

The repotools scripts used during the ELM version migration processes should show the approximate time remaining to complete and the percentage already completed for the task.
over 2 years ago in IBM Engineering - Foundation/Common Services / Systems Engineering 1 Not under consideration

Bulk deletion of cross application links

Hello team, The enhancement idea is to have the feature to bulk delete the links from selected artifacts. The cross application of deletion of links is currently not possible in bulk.
over 1 year ago in IBM Engineering - Requirements Management DOORS Next / Feature 0 Future consideration

To capture GPS coordinates from the map (for emmergency SR creation)

Maximo Anywhere can capture and record the GPS location only for the physical place, where the field engineer is. Other GPS location (like behind the river, for example) Maximo Anywhere is not able capture and record at all. The Maximo Anywhere re...
over 3 years ago in IBM MAS - Mobile 1 Not under consideration

Export Compare Configuration for specific Module or Change Set

The 7.0.2 release includes a compare configuration report, which looks super promising. Does this report give the ability to only export a give module? The options appear to only include as specific as Artifacts, which I imagine includes all artif...
over 3 years ago in IBM Engineering - Requirements Management DOORS Next / Usability 0 Not under consideration

Add ability to set the JDBC minimum connection pool size

It is possible to set the maximum connection pool size using the parameter maxconnpoolsize. However there is no corresponding parameter for the minimum connection pool size defined in the TRIRIGA custom resource definition.It is therefore not poss...
3 months ago in IBM TRIRIGA Application Platform 1 Future consideration