Skip to Main Content
IBM Sustainability Software - Ideas Portal


This portal is to open public enhancement requests against the products and services belonging to IBM Sustainability Software. To view all of your ideas submitted to IBM, create and manage groups of Ideas, or create an idea explicitly set to be either visible by all (public) or visible only to you and IBM (private), use the IBM Unified Ideas Portal (https://ideas.ibm.com).


Shape the future of IBM!

We invite you to shape the future of IBM, including product roadmaps, by submitting ideas that matter to you the most. Here's how it works:

Search existing ideas

Start by searching and reviewing ideas and requests to enhance a product or service. Take a look at ideas others have posted, and add a comment, vote, or subscribe to updates on them if they matter to you. If you can't find what you are looking for,

Post your ideas
  1. Post an idea.

  2. Get feedback from the IBM team and other customers to refine your idea.

  3. Follow the idea through the IBM Ideas process.


Specific links you will want to bookmark for future use

Welcome to the IBM Ideas Portal (https://www.ibm.com/ideas) - Use this site to find out additional information and details about the IBM Ideas process and statuses.

IBM Unified Ideas Portal (https://ideas.ibm.com) - Use this site to view all of your ideas, create new ideas for any IBM product, or search for ideas across all of IBM.

ideasibm@us.ibm.com - Use this email to suggest enhancements to the Ideas process or request help from IBM for submitting your Ideas.

ADD A NEW IDEA

Pinned ideas

PINNED Power BI capability alignment between Desktop vs embedded solution
Requesting Customer: Fraser Property but this would benefit all customers using Envizi Power BI capability Business Impact: The Frasers Property Team have recently explored the use of the embeded PowerBI functionality and have found that there are...
PINNED Enable inventory reservation automatic cron task for specific site
Advantage : Enable the cron for specific site which is necessary. Summary: In Maximo, we have more than 50 Active sites. When we try to enable inventory reservation automatic cron task for specific site, There is no Cron Parameters are available....

All ideas

Showing 5785

Display the label of work item attributes (if set) in error messages for Required Attributes For Type and State

When you receive an error message about a required attribute not set, the attribute name is used. This is OK if the name of the attribute and the label of the attribute are the same, but is confusing if the label has been set to something more con...
almost 2 years ago in IBM Engineering - Workflow Management / Work Items 1 Not under consideration

Modify Scheduler/Optimiser to support job/location based constraints e.g. security checks

Modify scheduler so that additional location/resource related constraints are checked when scheduling work. Some locations will have location specific constraints that are not directly related to the work being undertaken but are general restricti...
almost 9 years ago in IBM MAS - Scheduler 3 Future consideration

ReqIF obfuscator for diagnostics

During ReqIf import we ran into multiple issues. The logs and demonstration did not provide enough information for support to solve the issue. Support require a copy of the ReqIF file. Since the data has classified information we cannot do so. It ...
over 1 year ago in IBM Engineering - Requirements Management DOORS Next / Feature 0 Future consideration

Provision to copy baseline link from the dialogue box shown after baseline creation

When a baseline is crated ,we get a dialogue box saying "Baseline is created successfully." If we can also have an option to copy baseline link from there ,it saves much time. Useful when we provide Baseline links for reviews Note: Currently ,we h...
over 1 year ago in IBM Engineering - Requirements Management DOORS Next / Usability 0 Future consideration

Type System Change History

Type System Property Changes must be tracked and made visible to determine who made what change when.
almost 4 years ago in IBM Engineering - Requirements Management DOORS Next / Administration 0 Not under consideration

Adding navigation to ERM wireframe components

System: IBM Engineering Requirements Management DOORS Next Actor: Wireframe offered by doors next has feature lagging of navigation IBM Engineering Requirements Management DOORS Next which provides feature to create mock screen does not have featu...
about 3 years ago in IBM Engineering - Requirements Management DOORS Next / Feature 2 Not under consideration

Improve Workflow Designer to all allow disablement of out of data processes

Workflow designer is very inconsistent with allowing process to be disabled, even when the main process revision that they are attached to is disabled. This was reported to IBM on the referenced case as a problem with Application Designer, and the...
almost 4 years ago in IBM MAS - Manage (Base) 1 Future consideration

Installation should select latest version of compiler

Just now the installer leaves a factoryC++.prp file with many versions of VS listed, but doesn't even default to the latest...even when it know which versions of VS are installed. This should be selectable at install time.
8 months ago in IBM Engineering - Systems Design Rhapsody/RMM / Rhapsody Client 1 Future consideration

Maximo Mobile Inspection - Inspection signature does not display correctly.

Maximo Mobile Inspection - Inspection signature not displaying correctly. The signature is not displaying at all, if typed on the left of the form in the inspection form. The component does not detect in which region the signature is made, and the...
8 months ago in IBM MAS - Mobile 0 Is a defect

Need a tool or feature to fix type system inconsistencies

LQE RB Reports don't resolve when RDF URI Conflicts exist within ELM Properties. During Report Creation Time, conflicts appear on the screen for report builders. These conflicts should never be allowed to coexist in the same ELM instance. No provi...
8 months ago in IBM Engineering - Requirements Management DOORS Next / Administration 1 Future consideration