Skip to Main Content
IBM Sustainability Software - Ideas Portal


This portal is to open public enhancement requests against the products and services belonging to IBM Sustainability Software. To view all of your ideas submitted to IBM, create and manage groups of Ideas, or create an idea explicitly set to be either visible by all (public) or visible only to you and IBM (private), use the IBM Unified Ideas Portal (https://ideas.ibm.com).


Shape the future of IBM!

We invite you to shape the future of IBM, including product roadmaps, by submitting ideas that matter to you the most. Here's how it works:

Search existing ideas

Start by searching and reviewing ideas and requests to enhance a product or service. Take a look at ideas others have posted, and add a comment, vote, or subscribe to updates on them if they matter to you. If you can't find what you are looking for,

Post your ideas
  1. Post an idea.

  2. Get feedback from the IBM team and other customers to refine your idea.

  3. Follow the idea through the IBM Ideas process.


Specific links you will want to bookmark for future use

Welcome to the IBM Ideas Portal (https://www.ibm.com/ideas) - Use this site to find out additional information and details about the IBM Ideas process and statuses.

IBM Unified Ideas Portal (https://ideas.ibm.com) - Use this site to view all of your ideas, create new ideas for any IBM product, or search for ideas across all of IBM.

ideasibm@us.ibm.com - Use this email to suggest enhancements to the Ideas process or request help from IBM for submitting your Ideas.

ADD A NEW IDEA

Pinned ideas

PINNED Enable inventory reservation automatic cron task for specific site
Advantage : Enable the cron for specific site which is necessary. Summary: In Maximo, we have more than 50 Active sites. When we try to enable inventory reservation automatic cron task for specific site, There is no Cron Parameters are available....
PINNED Power BI capability alignment between Desktop vs embedded solution
Requesting Customer: Fraser Property but this would benefit all customers using Envizi Power BI capability Business Impact: The Frasers Property Team have recently explored the use of the embeded PowerBI functionality and have found that there are...

All ideas

Showing 5910

Provide warning message during asset location move impacting over 100 asset locations.

All sites using assets with locations (see Abbott Maximo Production Log issue# 486)
over 2 years ago in IBM MAS - Manage (Base) / Asset/Work Management 1 Future consideration

X-Marks the Spot (XMTS) – Identify via a map where the work order is spatially located

• Given the XMTS scenario is to plot the work order actual location, the initial map should be the device location rather than the current work order feature location (which can be completely wrong for CM work raised in call centre). • The solutio...
over 2 years ago in IBM MAS - Mobile 1 Not under consideration

Ability to have satellite base maps on the device

• The solution should allow the loading of multiple TPKs and satellite base maps and provide a switch between them.
over 2 years ago in IBM MAS - Mobile 2 Future consideration

IBM RQM offline application needs to be work in SSO (JAS) environment

RQM Offline Application unable to connect with RQM server : - We are trying to use the RQM offline application in order to execute the test scripts offline. But after installing the same, We are not able to connect RQM server from application. We ...
over 5 years ago in IBM Engineering - Test Management / Integrations 1 Not under consideration

Adding the PM number to the PM Work order generation log

When Maximo runs the PM cron and generates workorders, the output is written to a log file. When PMs don't generate due to an error, the log contains the error message but not the PM associated with the error. This makes to very difficult to deter...
almost 11 years ago in IBM MAS - Manage (Base) 2 Not under consideration

Move Calendar - The ability to block certain days/date from being chosen within the move request is not provided.

Requestors can choose any day for a move. At the present time, regions can set up MOVE CALENDARS which outline days of week where move activity can happen. Calendars also provide the ability to set capacity limits on the number of moves allowed on...
almost 11 years ago in IBM TRIRIGA Space Management 3 Planned for future release

Better error messages to indicate out of tmp space or missing files

This request is to have better error logging or messages that actually help to determine what the problem is instead of having to decipher failure of many extraneous, but connected parts of z/os - such as language environment or ISPF or SYSLOG or ...
over 5 years ago in IBM Engineering - Workflow Management / Usability 3 Not under consideration

RQM: display additional test case information during test execution.

Scenario 1 - During execution of a test case WITHOUT a test script the following Test Case sections are shown:1) Test Description2) Pre-Condition3) Expected Results4) Post-Condition Scenario 2 - With a linked Test Script only the following section...
over 5 years ago in IBM Engineering - Test Management / Unassigned 1 Not under consideration

Easier way to change order of Test Case in a Test Plan

Sometimes the sequence of Tests Cases in a list is not as desired, then RQM users need to change it to fit on the execution needing, perhaps depending of how long the list looks like, the way available is not performatic.
over 5 years ago in IBM Engineering - Test Management / Usability 1 Not under consideration

Test steps and expected results are located at the different pages

Test steps and expected results are located at the different pages, user has to click back and forward to check the test steps and the expectation for the specific step, when executing test cases from RQM.
over 5 years ago in IBM Engineering - Test Management / Usability 3 Not under consideration