Skip to Main Content
IBM Sustainability Software - Ideas Portal


This portal is to open public enhancement requests against the products and services belonging to IBM Sustainability Software. To view all of your ideas submitted to IBM, create and manage groups of Ideas, or create an idea explicitly set to be either visible by all (public) or visible only to you and IBM (private), use the IBM Unified Ideas Portal (https://ideas.ibm.com).


Shape the future of IBM!

We invite you to shape the future of IBM, including product roadmaps, by submitting ideas that matter to you the most. Here's how it works:

Search existing ideas

Start by searching and reviewing ideas and requests to enhance a product or service. Take a look at ideas others have posted, and add a comment, vote, or subscribe to updates on them if they matter to you. If you can't find what you are looking for,

Post your ideas
  1. Post an idea.

  2. Get feedback from the IBM team and other customers to refine your idea.

  3. Follow the idea through the IBM Ideas process.


Specific links you will want to bookmark for future use

Welcome to the IBM Ideas Portal (https://www.ibm.com/ideas) - Use this site to find out additional information and details about the IBM Ideas process and statuses.

IBM Unified Ideas Portal (https://ideas.ibm.com) - Use this site to view all of your ideas, create new ideas for any IBM product, or search for ideas across all of IBM.

ideasibm@us.ibm.com - Use this email to suggest enhancements to the Ideas process or request help from IBM for submitting your Ideas.

ADD A NEW IDEA

Pinned ideas

PINNED Power BI capability alignment between Desktop vs embedded solution
Requesting Customer: Fraser Property but this would benefit all customers using Envizi Power BI capability Business Impact: The Frasers Property Team have recently explored the use of the embeded PowerBI functionality and have found that there are...
PINNED Enable inventory reservation automatic cron task for specific site
Advantage : Enable the cron for specific site which is necessary. Summary: In Maximo, we have more than 50 Active sites. When we try to enable inventory reservation automatic cron task for specific site, There is no Cron Parameters are available....

All ideas

Showing 2925

Need to be able to use reporting service to show links between Test Plans and Module Views

Currently if you link a Test Plan to a module view there is no way in the Reporting Service to show the trace between the Test plan and the Module View. It simply shows NO relationship not even to the module that the view is part of. This is a cri...
about 2 years ago in IBM Engineering - Requirements Management DOORS Next / Usability 0 Future consideration

Enable Rhapsody Design Manager Client extension to allow Kerberos/SPNEGO SSO authentication on DM server with fallback to bas

Rational Rhapsody Design Manager is a commonly used product that provides environment Software design, development, reporting, and testing for better control of the software development life cycle. Description: Our team is in process of using Rhap...
over 8 years ago in IBM Engineering - Systems Design Rhapsody/RMM / Rhapsody Client 2 Future consideration

Asset availability enhancement

The aim of this RFE is to have a usable integrated solution for asset availability.Today there is an action in Maximo Asset application "Asset Availability" with sub-actions "Define / Manage Maintenance / Operational Schedule" but it's unusable fo...
over 4 years ago in IBM MAS - Manage (Base) 0 Future consideration

[Shifts] Tasks must always be scheduled in the original scheduled shift (Team continuity)

After the first operation of a task is scheduled in one shift, the rest of the task must always be scheduled in that initial shift.
about 2 years ago in IBM MAS - Scheduler 0 Future consideration

[Optim Result] Avoid few (specific threshold) scheduled job for: Specific craft, specific A/C (Multiline) & specific zone

Avoid scheduling small quantity of jobs for specific craft, A/C or Zone to avoid movement or bussiness incoherencies.
about 2 years ago in IBM MAS - Scheduler 0 Future consideration

[Dependencies] Improve Auto relax of dependencies due to actuals when specific job is advanced

If an isolated task, that was planned for the future is advanced (due to some unplanned bussiness requirements), it results in a relaxation of all their predecessors (direct or inherited).
about 2 years ago in IBM MAS - Scheduler 0 Future consideration

[Craft] Activities/Operations with flexible craft

Some operations will have no specific requirement for craft. They can be done by any available craft at the time of scheduling.
about 2 years ago in IBM MAS - Scheduler 1 Future consideration

RTC Query UI is not designed well

RTC Query UI is not designed well and doesn't utilize the entire available space in Query UI.
over 4 years ago in IBM Engineering - Workflow Management / Usability 1 Future consideration

TRIRIGA Reporting: Ability to Link Reports together for an easy toggle - Like Related Reports

We have a lot of queries in the system that have related reports - and some in portal sections. To gain the full effect of the TRIRIGA Reporting features - it would be nice to be able to toggle between reports like we can for related reports. Our ...
about 2 years ago in IBM TRIRIGA Reporting 0 Future consideration

Condition Monitoring Work Order Generation should work the same way as it does for the Cron Task LinearMeasurementWoGenCronTask to eliminate the inconsistency

Maximo Linear allows you to record multiple Gauge or Characteristics meter readings (measurements or observations) taken over a short duration of time. Some of these meter readings may be over the action limits. When using the action Generate Work...
about 2 years ago in IBM MAS - Manage (Base) / Linear 0 Future consideration