Skip to Main Content
IBM Sustainability Software - Ideas Portal


This portal is to open public enhancement requests against the products and services belonging to IBM Sustainability Software. To view all of your ideas submitted to IBM, create and manage groups of Ideas, or create an idea explicitly set to be either visible by all (public) or visible only to you and IBM (private), use the IBM Unified Ideas Portal (https://ideas.ibm.com).


Shape the future of IBM!

We invite you to shape the future of IBM, including product roadmaps, by submitting ideas that matter to you the most. Here's how it works:

Search existing ideas

Start by searching and reviewing ideas and requests to enhance a product or service. Take a look at ideas others have posted, and add a comment, vote, or subscribe to updates on them if they matter to you. If you can't find what you are looking for,

Post your ideas
  1. Post an idea.

  2. Get feedback from the IBM team and other customers to refine your idea.

  3. Follow the idea through the IBM Ideas process.


Specific links you will want to bookmark for future use

Welcome to the IBM Ideas Portal (https://www.ibm.com/ideas) - Use this site to find out additional information and details about the IBM Ideas process and statuses.

IBM Unified Ideas Portal (https://ideas.ibm.com) - Use this site to view all of your ideas, create new ideas for any IBM product, or search for ideas across all of IBM.

ideasibm@us.ibm.com - Use this email to suggest enhancements to the Ideas process or request help from IBM for submitting your Ideas.

ADD A NEW IDEA

Pinned ideas

PINNED Power BI capability alignment between Desktop vs embedded solution
Requesting Customer: Fraser Property but this would benefit all customers using Envizi Power BI capability Business Impact: The Frasers Property Team have recently explored the use of the embeded PowerBI functionality and have found that there are...
PINNED Enable inventory reservation automatic cron task for specific site
Advantage : Enable the cron for specific site which is necessary. Summary: In Maximo, we have more than 50 Active sites. When we try to enable inventory reservation automatic cron task for specific site, There is no Cron Parameters are available....

All ideas

Showing 5785 of 5785

Unable to get complementary set report in JRS

We are find hard time to achieve one of our customer usecase in Jazz Report Builder. The requirement is basically user has prepared following two reports Set 1Data source: LQE with configurationsLimit the scope: L2 Requirements Project AreaChoose ...
over 1 year ago in IBM Engineering - Requirements Management DOORS Next 1 Not under consideration

Link to Reviews: Links to reviews are shown independent of the current GC context from artifact point of view.

For a give module/artifact all reviews links are shown independent of the context the review were created in (see attachments). Request: constrain the link list to reviews, which were created in the current context, only.
over 1 year ago in IBM Engineering - Requirements Management DOORS Next / Usability 0 Future consideration

Consider Project Area Associations for linking between Project Areas

Consider Project Area Associations for Traceability: Currently, traces from an Item in an config management enabled RM project area to config management enabled project areas in other applications, e.g. QM, are only possible if the RM and the QM p...
over 1 year ago in IBM Engineering - Requirements Management DOORS Next / Integrations 0 Future consideration

Allow for the deletion of the last remain line on a PO with a revision created by the MIF using IFace tables.

Currently when POs are revised with the MIF, Maximo does not allow the deletion of the last line. Since PO revisions are handled by the MIF as lines in the incoming revision are compared against current lines, it is assumed that if a PO comes in w...
about 3 years ago in IBM MAS - Manage (Base) / Integration 0 Future consideration

Enhancement request for proper documentation Model Synchronization profile

Documentation Model Synchronization profile:This is a good feature to have in Rhapsody At present there is only one short documentation in in the below link :https://www.ibm.com/support/knowledgecenter/hr/SSB2MU_8.4.0/com.ibm.rhp.uml.diagrams.doc/...
over 4 years ago in IBM Engineering - Systems Design Rhapsody/RMM / Documentation 1 Future consideration

Ability to filter Module Comments

When a module is reviewed that has 30 comments in it. Its not particularly easy to only see the ones you added. So adding the ability to filter them would enhance the product. If this feature isn’t implemented the user will need to either scroll u...
about 3 years ago in IBM Engineering - Requirements Management DOORS Next 0 Not under consideration

Quich Search should behave the same way across each CLM application (treatment of special characteres)

Quick Search does not currently behave the same way across each CLM application. Given lucene is the technology, it should be implemented the same way by CCM, RM, QM. An example is underscores - the RM application made a change in 6.0.4 to no long...
over 6 years ago in IBM Engineering - Foundation/Common Services / Usability 2 Not under consideration

Enhancement request for Operations in an interface should be 'virtual' by default

while adding function to interface class, all functions are marked as abstract not virtual.
over 4 years ago in IBM Engineering - Systems Design Rhapsody/RMM / Modeling and UI 1 Future consideration

DNG-RTC integration extension

DNG-RTC integration should be extended to allow to link a Module type artifact to not only Development/Test plans but to every types in CCM, such as Text type artifacts
over 6 years ago in IBM Engineering - Requirements Management DOORS Next / Feature 3 Not under consideration

Saved Query public at site level

Saved Queries which are made pubic is visible by all user from all site. It should be at site level, which means if a saved query is made public, it should be visible from that perticular site.
about 11 years ago in IBM MAS - Manage (Base) 2 Not under consideration