Skip to Main Content
IBM Sustainability Software - Ideas Portal


This portal is to open public enhancement requests against the products and services belonging to IBM Sustainability Software. To view all of your ideas submitted to IBM, create and manage groups of Ideas, or create an idea explicitly set to be either visible by all (public) or visible only to you and IBM (private), use the IBM Unified Ideas Portal (https://ideas.ibm.com).


Shape the future of IBM!

We invite you to shape the future of IBM, including product roadmaps, by submitting ideas that matter to you the most. Here's how it works:

Search existing ideas

Start by searching and reviewing ideas and requests to enhance a product or service. Take a look at ideas others have posted, and add a comment, vote, or subscribe to updates on them if they matter to you. If you can't find what you are looking for,

Post your ideas
  1. Post an idea.

  2. Get feedback from the IBM team and other customers to refine your idea.

  3. Follow the idea through the IBM Ideas process.


Specific links you will want to bookmark for future use

Welcome to the IBM Ideas Portal (https://www.ibm.com/ideas) - Use this site to find out additional information and details about the IBM Ideas process and statuses.

IBM Unified Ideas Portal (https://ideas.ibm.com) - Use this site to view all of your ideas, create new ideas for any IBM product, or search for ideas across all of IBM.

ideasibm@us.ibm.com - Use this email to suggest enhancements to the Ideas process or request help from IBM for submitting your Ideas.

ADD A NEW IDEA

All ideas

Showing 2831

Enable Rhapsody Design Manager Client extension to allow Kerberos/SPNEGO SSO authentication on DM server with fallback to bas

Rational Rhapsody Design Manager is a commonly used product that provides environment Software design, development, reporting, and testing for better control of the software development life cycle. Description: Our team is in process of using Rhap...
over 8 years ago in IBM Engineering - Systems Design Rhapsody/RMM / Rhapsody Client 2 Future consideration

Add capability to filter requirements in a module whether they are part of a specific collection

If using both collections and modules to define properties of an artifact / requirement it would be helpful to filter in a module only for artifacts, which are part of a specific collection. For example you want to filter a module for requirements...
about 2 years ago in IBM Engineering - Requirements Management DOORS Next / Feature 0 Future consideration

laborhours must be edited or deleted

after entering hours in maximo mobile this records can not be edited or deleted. our technician are used to maximo classic where they are capable to do so. either because they entered wrong values or they choose the wrong workorder. either way if ...
about 2 years ago in IBM MAS - Mobile 0 Future consideration

[Shifts] Task exclusivity for shifts

The idea is to have a task pre-decleared to only be performed during a specific shift.
about 2 years ago in IBM MAS - Scheduler 1 Future consideration

[Optim Result] Include Resources KPIs in Optimizer extract

Provide in the Optimizer extract KPIs to track the craft and the zone usage after obtaining the optimization result.
about 2 years ago in IBM MAS - Scheduler 0 Future consideration

Request "Split Work" functionality currently in GS to be added to GA

Currently Graphical Scheduler has the ability to Split Work. This same functionality should be extended to Graphical Assignment in the Work view tab.
over 4 years ago in IBM MAS - Scheduler 2 Future consideration

Control Panel: add Transparency to Diagram Tools and Common and Free Shapes

Add a Transparency Level to each Diagram Tool and Common and Free Shape on the Control Panel. This feature will allow a background picture (e.g., JPEG) to be placed on a control panel, and then have Diagram Tools and Common and Free Shapes placed ...
over 4 years ago in IBM Engineering - Systems Design Rhapsody/RMM / Modeling and UI 1 Future consideration

[Execution] On-hold workload management

When many tasks are blocked/onhold at the end of the shift, not enough job might provided due to delay of successors until the completion of the blocked predecessors. The solution to this issue might be linked to the use of logic/feasible flags in...
about 2 years ago in IBM MAS - Scheduler 0 Future consideration

[Execution] In Progress management

The operations that have the "In progress" status, are always scheduled at the beginning of the next shift. However, two improvements are proposed: 1-Using the remaining duration and rescheduling the operation equal to the duration of a predefine...
about 2 years ago in IBM MAS - Scheduler 0 Future consideration

Limit maximum delay between predecessor Successor

Task A is predecessor of Task B. Therefore, with this feature the user establishes that Task B must be performed within a certain maximum time interval after the end/start of Task A.
about 2 years ago in IBM MAS - Scheduler 0 Future consideration