Skip to Main Content
IBM Sustainability Software - Ideas Portal


This portal is to open public enhancement requests against the products and services belonging to IBM Sustainability Software. To view all of your ideas submitted to IBM, create and manage groups of Ideas, or create an idea explicitly set to be either visible by all (public) or visible only to you and IBM (private), use the IBM Unified Ideas Portal (https://ideas.ibm.com).


Shape the future of IBM!

We invite you to shape the future of IBM, including product roadmaps, by submitting ideas that matter to you the most. Here's how it works:

Search existing ideas

Start by searching and reviewing ideas and requests to enhance a product or service. Take a look at ideas others have posted, and add a comment, vote, or subscribe to updates on them if they matter to you. If you can't find what you are looking for,

Post your ideas
  1. Post an idea.

  2. Get feedback from the IBM team and other customers to refine your idea.

  3. Follow the idea through the IBM Ideas process.


Specific links you will want to bookmark for future use

Welcome to the IBM Ideas Portal (https://www.ibm.com/ideas) - Use this site to find out additional information and details about the IBM Ideas process and statuses.

IBM Unified Ideas Portal (https://ideas.ibm.com) - Use this site to view all of your ideas, create new ideas for any IBM product, or search for ideas across all of IBM.

ideasibm@us.ibm.com - Use this email to suggest enhancements to the Ideas process or request help from IBM for submitting your Ideas.

ADD A NEW IDEA

All ideas

Showing 5744 of 5744

Rational Team Concert CCM Sequential Approvers

The approvers in the boards of approval tab for Change Requests Work Items in Rational Team Concert CCM should be sequential. E.g. the second approver can only approve after the first one did and so on. The order of approvers shall be editable via...
about 3 years ago in IBM Engineering - Workflow Management / Work Items 1 Not under consideration

Asynchronous automation scripts: Provide a Python example

Regarding Asynchronous automation scripts documentation: https://www.ibm.com/docs/en/mam/7.6.1.2?topic=tasks-adding-scripts-that-run-as-asynchronous-jobs The example in the docs is an MBR script. It would be helpful if a Python example could be pr...
about 3 years ago in IBM MAS - Manage (Base) / System Admin Config/Security 0 Future consideration

Allow For Aging of JRS Report Data in Order to Keep DataBases are as Clean as Possible

So our JRS Scheduler Reports database does not fill up with old data, we would to have the ability to age off old report data.
about 6 years ago in IBM Engineering - Reporting / Unassigned 1 Future consideration

Display information about the latest Maximo Mobile test fix / iFix in Maximo System Information

Currently no changes occur in the system information after deploying Maximo Mobile 8.5 TESTFIX , which makes it a lot trickier to understand whether a certain fix has been applied or not This has been observed in Maximo Mobile for EAM, v8.5 TESTF...
about 3 years ago in IBM MAS - Mobile 1 Functionality already exists

Start/Stop timer for tasks

In WOTRACK and Quick reporting: It would be helpful if there were a start/stop timer for tasks that workers could use to easily start and stop their task labor actuals (with the click of a button). It would be more efficient to use a timer than ma...
about 3 years ago in IBM MAS - Manage (Base) / System Admin Config/Security 0 Future consideration

Performance improvement for loading team area with large number of users

​There is a case where large number of users belong to a particular team area. As the number increases, longer it takes to open it to make some change. Some team area takes more than 40 seconds to open up.Having this improvement, usability will im...
about 6 years ago in IBM Engineering - Foundation/Common Services / Unassigned 1 Future consideration

6.0.6 Upgrade Concern: Diable or Hide the JRS Schedule Screen From All AT&T Users To Protect Server Performance

For the TDP-JRS application we desire to have the ability to block or hide the presentation of the JRS Scheduling screen to all users. This IBM feature 6.0.6 Upgrade Feature, that based on our conversations, we believe allows users to schedule an ...
about 6 years ago in IBM Engineering - Reporting / Unassigned 1 Future consideration

RFE - 6.0.6 Upgrade - for JRS Report Scheduler, allow only select people to use the Scheduler

IBM will be installing a JRS Report Scheduler with the 6.0.6 Upgrade. Based on recent conversations with IBM, our opinion is that:1) there is no way to turn off the new JRS scheduler2) automatically delete old report data3) limit its use to a sele...
about 6 years ago in IBM Engineering - Reporting / Unassigned 1 Future consideration

There is no option to make test environment category as mandatory

Currently, RQM allows the users to generate test environments based on the platform coverage added.However, it allows the user to proceed further with just one option is selected.But, we need an option to make this selection mandatory for the adde...
about 6 years ago in IBM Engineering - Test Management / Usability 3 Not under consideration

CUE - Contractor Pricing Should allow outside labor costs to vary with the filter values just as internal labor

Currently there is no easy way to support estimating outside labor costs when the field conditions change. For example, when digging in rocky soil, the filter values can be used to add additional cost for the additional labor required for this sit...
about 12 years ago in IBM MAS - Utilities 1 Not under consideration