Skip to Main Content
IBM Sustainability Software - Ideas Portal


This portal is to open public enhancement requests against the products and services belonging to IBM Sustainability Software. To view all of your ideas submitted to IBM, create and manage groups of Ideas, or create an idea explicitly set to be either visible by all (public) or visible only to you and IBM (private), use the IBM Unified Ideas Portal (https://ideas.ibm.com).


Shape the future of IBM!

We invite you to shape the future of IBM, including product roadmaps, by submitting ideas that matter to you the most. Here's how it works:

Search existing ideas

Start by searching and reviewing ideas and requests to enhance a product or service. Take a look at ideas others have posted, and add a comment, vote, or subscribe to updates on them if they matter to you. If you can't find what you are looking for,

Post your ideas
  1. Post an idea.

  2. Get feedback from the IBM team and other customers to refine your idea.

  3. Follow the idea through the IBM Ideas process.


Specific links you will want to bookmark for future use

Welcome to the IBM Ideas Portal (https://www.ibm.com/ideas) - Use this site to find out additional information and details about the IBM Ideas process and statuses.

IBM Unified Ideas Portal (https://ideas.ibm.com) - Use this site to view all of your ideas, create new ideas for any IBM product, or search for ideas across all of IBM.

ideasibm@us.ibm.com - Use this email to suggest enhancements to the Ideas process or request help from IBM for submitting your Ideas.

ADD A NEW IDEA

All ideas

Showing 5799 of 5799

[HW] Share lab ressources accross project areas

Hardware develompent in different product areas typically share lab ressources for efficiency and cost reasons. Therefore it appaers benefical to share those lab ressources with other project areas. This prevents duplication of information (single...
about 1 month ago in IBM Engineering - Test Management / Lab Management 0 Future consideration

Allow non Template Certificates to be used on PMs

Our HSE Group has decided to use Certificates as a central reference to tie the PM's and work orders together at a higher level. This way many PM's can be tied to one Certificate. By doing this we removed the out of the box domain on PM's and work...
about 1 month ago in IBM MAS - Oil & Gas / HSE 0 Planned for future release

The ability to add/update an image to an asset while working on a workorder/inspection

Add the ability to add an image to an Asset/Location from a workorder Ideally this should be something that would be approved by someone who has access to save on the Asset record to prevent inexperienced users from adding the wrong picture to an ...
2 months ago in IBM MAS - Mobile 1 Functionality already exists

In the Service Request application, filter out history records by default as in Work Order Tracking

In the Service Request application, when a user goes into the application and presses the Enter key, all SRs in the system are retrieved, both active and closed/historical. This application has a History? flag in the More Search Fields, but it is ...
2 months ago in IBM MAS - Manage (Base) / Service Desk 0 Under review

Mobile - Remote log collection (for locked down devices/multi user shared devices etc...) alternative to emailing logs to support.

Because the devices are shared multi user devices (we use Android currently) on a Work Profile [https://support.google.com/work/android/answer/6191949?hl=en]. We are limited to specific applications (no email, no text pad etc...). The users do not...
9 months ago in IBM MAS - Mobile 0 Future consideration

Update a stream from a baseline

This enhancement would allow a user to perform an action on a stream which updates it to have the same content as a specified baseline.In particular, this would remove any artifacts in the stream that are not in the baseline, restore any artifacts...
over 1 year ago in IBM Engineering - Requirements Management DOORS Next / Feature 1 Future consideration

Scheduler – Graphical Work Week - Remove the start date filled automatically.

The Scheduler has Work order's in his scope of work that does not have planning dates because it is not a priority. The scheduler wishes to identify them to populate his planning. The scheduler wishes that the schedule dates are not automatically ...
almost 4 years ago in IBM MAS - Scheduler 6 Future consideration

Forgot Password Feature based on Login ID

Raising this against IBM TRIRIGA Platform Version 4.5 The Forgot Password Feature in Platform version 4.5 needs the user to have a unique Email ID in the System. This doesn't work if the User has no Email ID or a Shared Email id that is used again...
about 1 year ago in IBM TRIRIGA Application Platform 1 Not under consideration

Option to see live console log from ETM web UI, while executing Test Script

We are looking for a way to see the console log from ETM web UI end, so that whenever any automated Test Script is running from the source using command line adapter, it should show what all steps it is executing in ETM web and that should be live...
3 months ago in IBM Engineering - Test Management / Test Execution 0 Future consideration

Change mode of floating windows to Read/Write

Currently with Rhapsody v10.0 (Build No. 10.0.0.R00_202402122040 64bit), it is possible to display diagrams in a floating window. However, this window and it diagram is in ReadOnly mode. By changing to Read/Write mode a floating diagram window, it...
6 months ago in IBM Engineering - Systems Design Rhapsody/RMM / Modeling and UI 1 Planned for future release