Skip to Main Content
IBM Sustainability Software - Ideas Portal


This portal is to open public enhancement requests against the products and services belonging to IBM Sustainability Software. To view all of your ideas submitted to IBM, create and manage groups of Ideas, or create an idea explicitly set to be either visible by all (public) or visible only to you and IBM (private), use the IBM Unified Ideas Portal (https://ideas.ibm.com).


Shape the future of IBM!

We invite you to shape the future of IBM, including product roadmaps, by submitting ideas that matter to you the most. Here's how it works:

Search existing ideas

Start by searching and reviewing ideas and requests to enhance a product or service. Take a look at ideas others have posted, and add a comment, vote, or subscribe to updates on them if they matter to you. If you can't find what you are looking for,

Post your ideas
  1. Post an idea.

  2. Get feedback from the IBM team and other customers to refine your idea.

  3. Follow the idea through the IBM Ideas process.


Specific links you will want to bookmark for future use

Welcome to the IBM Ideas Portal (https://www.ibm.com/ideas) - Use this site to find out additional information and details about the IBM Ideas process and statuses.

IBM Unified Ideas Portal (https://ideas.ibm.com) - Use this site to view all of your ideas, create new ideas for any IBM product, or search for ideas across all of IBM.

ideasibm@us.ibm.com - Use this email to suggest enhancements to the Ideas process or request help from IBM for submitting your Ideas.

ADD A NEW IDEA

All ideas

Showing 5797 of 5797

Include preferred links in import project properties

Importing properties from another project does not include preferred links.There are included in project templates, so why not in import project properties?Setting these for each project manually is time consuming and leads to inconsistencies acro...
over 6 years ago in IBM Engineering - Requirements Management DOORS Next / Feature 3 Not under consideration

RQM - Handling of unneeded dashboards

Most users in RQM also have a personal dashboard. After users are no longer active in the RQM, they can be archived. That's over 500 users so far. However, the personal dashboard still exists for these users. Meanwhile over 1400 dashboards have be...
over 6 years ago in IBM Engineering - Test Management / Administration 1 Not under consideration

Linear Tools: Add measure tool to detail menu to measure segments when adding to AssetSpecs or Features for a Linear record

When creating AssetSpec of Feature records for a Linear Maximo Asset a measure tool is needed to add the start and end measures from the map. These values are often provided from field measurements however many times customers would like to perfor...
over 6 years ago in IBM MAS - Spatial 0 Planned for future release

Control the values in Number of items per page

The table view displayed on browsing any test artifact in RQM shows the number of items based on the value selected in "Number of items per page" drop down field.Currently we can only enable/disable the drop down field in the configuration.On enab...
over 6 years ago in IBM Engineering - Test Management / Usability 3 Not under consideration

RQM Rich Text Editor Size

Our team is using RQM to manage test cases. The editor in the test case has a fixed vertical size, while its horizontal size adjusts dynamically with the browser window. The vertical size should adjust to the window size in order to accommodate a ...
over 6 years ago in IBM Engineering - Test Management / Usability 4 Not under consideration

Configurable hierarchical information in tree view of plan

When I am in a sprint plan, (or any plan for that matter), I would like it to be configurable which levels of the hierarchy are presented to me. I don't always need to see the whole hierarchy.
over 6 years ago in IBM Engineering - Workflow Management / Planning 2 Not under consideration

Manage This Project Area History Records

When changing permissions or other settings in the Manage This Project Area for RQM, the History record for those changes prints in XML format. The specific request is for the history record to print in a readable format. Certain history records a...
over 6 years ago in IBM Engineering - Test Management / Administration 1 Not under consideration

Higher Level Configuration to turn off Permanent Delete

In our field, we cannot have any data permanently deleted. We have disabled the permanent delete permissions for our project areas, but admins are still able to change the permissions to enable it. The specific request would be for a server level ...
over 6 years ago in IBM Engineering - Test Management / Administration 1 Not under consideration

RQM edit test plan authorization

System: RQMActor: Admin of RQM Description: Our team is admin of RQM, RTC and Doors applications. We can manage modify work item permissions for user with specific modify case under Manage Project Areas -> (Project Area) -> Permissions->S...
over 6 years ago in IBM Engineering - Test Management / Usability 3 Not under consideration

Common Terms in several Tools

We are using DNG and Rhapsody and need to get a better integrated work process and balance between the tools as well as better support to avoid reduntant information within the tools. Therefore it is of major interest to be able to define Terms th...
over 6 years ago in IBM Engineering - Systems Design Rhapsody/RMM 1 Future consideration