Skip to Main Content
IBM Sustainability Software - Ideas Portal


This portal is to open public enhancement requests against the products and services belonging to IBM Sustainability Software. To view all of your ideas submitted to IBM, create and manage groups of Ideas, or create an idea explicitly set to be either visible by all (public) or visible only to you and IBM (private), use the IBM Unified Ideas Portal (https://ideas.ibm.com).


Shape the future of IBM!

We invite you to shape the future of IBM, including product roadmaps, by submitting ideas that matter to you the most. Here's how it works:

Search existing ideas

Start by searching and reviewing ideas and requests to enhance a product or service. Take a look at ideas others have posted, and add a comment, vote, or subscribe to updates on them if they matter to you. If you can't find what you are looking for,

Post your ideas
  1. Post an idea.

  2. Get feedback from the IBM team and other customers to refine your idea.

  3. Follow the idea through the IBM Ideas process.


Specific links you will want to bookmark for future use

Welcome to the IBM Ideas Portal (https://www.ibm.com/ideas) - Use this site to find out additional information and details about the IBM Ideas process and statuses.

IBM Unified Ideas Portal (https://ideas.ibm.com) - Use this site to view all of your ideas, create new ideas for any IBM product, or search for ideas across all of IBM.

ideasibm@us.ibm.com - Use this email to suggest enhancements to the Ideas process or request help from IBM for submitting your Ideas.

ADD A NEW IDEA

My ideas

Showing 5750

Reservation Space Groups with Exchange Integration

Reservation Space Groups are not part of Exchange Integration which will be an issue for clients who uses Reservation Space groups and would like to go with Exchange Integration. Please add Reservation Space groups to the Exchange Integration.
over 1 year ago in IBM TRIRIGA Workplace Experience 2 Future consideration

make EWM server installable from a RPM

In order to install an EWM server on Red Hat Enterprise Linux (among others) we need a RPM. So it would be useful for IBM to provide one or more RPMs on jazz.net in order to install an EWM server and its optional components : CCM, JTS, DCC, etc. T...
almost 3 years ago in IBM Engineering - Workflow Management / Installation 1 Not under consideration

Include in the artefact history the version/baseline information

Current situation: The artefact history does not include any version/baseline information and it is difficult to track modifications based on a version of an artefact; only possible by checking the Modified date. Required situation/Proposal: The a...
11 months ago in IBM Engineering - Test Management / Usability 1 Future consideration

Allow Light and Quit Options duing Barcode Scanning

When using the barcode scanner, there is no option to quit and return to the previous screen. A barcode must be scanned in order to return. The barcode capability is sometimes connected to a search, so it then must search for a record that doesn't...
almost 7 years ago in IBM MAS - Mobile 0 Planned for future release

Enable inventory reservation automatic cron task for specific site

Advantage : Enable the cron for specific site which is necessary. Summary: In Maximo, we have more than 50 Active sites. When we try to enable inventory reservation automatic cron task for specific site, There is no Cron Parameters are available....
over 2 years ago in IBM MAS - Manage (Base) 3 Future consideration

Setup AP/LDAP groups for DOORS Next project area to assign access for groups (not just individual user)

We want to add LDAP/AD group directly in the project area and giving access to groups (like Team_A, Team_B).We have hundreds of users in same project area and divided to different sub groups (each group can contain tens of persons). Its' impossibl...
over 3 years ago in IBM Engineering - Requirements Management DOORS Next / Administration 2 Not under consideration

Re-labelling of Annonated Data Set

Currently, the only way to re-label annonated data set in the GUI is to go into individual image and rename a specific "object", which does not make sense for huge data set. There's 2 work arounds regarding this.1) Using of command line with "visi...
about 3 years ago in IBM MAS - Visual Inspection 1 Functionality already exists

Allow ETM (and potentially EWM) to reference DNG Terms so projects (via a GC) can have a single repository of terms/acronyms etc

Currently projects invest in creating DOORS Next collections of terms, acronyms and reference documents (all DOORS Next glossary terms). The functionality to type and use control Space to lookup already defined terms is incredibly useful with DOOR...
about 2 years ago in IBM Engineering - Test Management / Integrations 0 Future consideration

DNG-RTC WorkItem Linkage in using GCM

When you set a link between DNG and RTC in using GCM, the link will be set to the deliverable linked to the local stream of DNG.Since this uses the GCM stream, the deliverables associated with the global configuration stream should be linked.When ...
over 3 years ago in IBM Engineering - Requirements Management DOORS Next / Feature 1 Not under consideration

[IDz] Merge window: Button Current Change from Right to Left (or Left to Right) should be deactivated once clicked

In the merge window of IDz, after clicking on the button "Copy Current Change from Right to Left (or Left to Right)", we can see the modification in two editors. However this button is still there and clickable if we don't save. In the case of add...
8 months ago in IBM Engineering - Workflow Management / Source Control 1 Not under consideration