Skip to Main Content
IBM Sustainability Software - Ideas Portal


This portal is to open public enhancement requests against the products and services belonging to IBM Sustainability Software. To view all of your ideas submitted to IBM, create and manage groups of Ideas, or create an idea explicitly set to be either visible by all (public) or visible only to you and IBM (private), use the IBM Unified Ideas Portal (https://ideas.ibm.com).


Shape the future of IBM!

We invite you to shape the future of IBM, including product roadmaps, by submitting ideas that matter to you the most. Here's how it works:

Search existing ideas

Start by searching and reviewing ideas and requests to enhance a product or service. Take a look at ideas others have posted, and add a comment, vote, or subscribe to updates on them if they matter to you. If you can't find what you are looking for,

Post your ideas
  1. Post an idea.

  2. Get feedback from the IBM team and other customers to refine your idea.

  3. Follow the idea through the IBM Ideas process.


Specific links you will want to bookmark for future use

Welcome to the IBM Ideas Portal (https://www.ibm.com/ideas) - Use this site to find out additional information and details about the IBM Ideas process and statuses.

IBM Unified Ideas Portal (https://ideas.ibm.com) - Use this site to view all of your ideas, create new ideas for any IBM product, or search for ideas across all of IBM.

ideasibm@us.ibm.com - Use this email to suggest enhancements to the Ideas process or request help from IBM for submitting your Ideas.

ADD A NEW IDEA

My ideas

Showing 5836 of 5836

Extended drilldown – add possibilty to configure classstructure into it / show tree of assets

Problem The extended drilldown is a good tool to get a hierarchical overview about data. But it has limited options to show information in tree do easily navigate & identify different data. Additionally, when extended drilldown is opened in ap...
5 months ago in IBM MAS - Manage (Base) / Asset/Work Management 2 Not under consideration

Possibility of defining “Validated by” link constraints between ERM and ETM

See the screenshot "2024-07-09 12_34_01-Window.png". The QM Test Case 364 validate the RM artifacts 45130, 43907, 43390 and 43391 45130 is a "Heading" artifact 43907 is an "Information" artifact 43390 and 43391 are "Requirement" artifacts In our i...
5 months ago in IBM Engineering - Test Management / Administration 0 Future consideration

Code Review status dependency on Work Item status

Why is it useful? Effective EWM v7.x: Ø the Code Review Tool doesn’t leverage the work item’s lifecycle status or its approval mechanism like it did with the older RTC v6.x. Ø the Code Review Tool has its own in-built independent approval mechanis...
7 months ago in IBM Engineering - Workflow Management / Work Items 1 Future consideration

Start Inspection from Map and track progress on the map

With spatial, there is the possibility to work more from the map. We often work with multiple assets on one work order (Multiassetlocci). For example, inspection of traffic signs. We want to be able to start the inspection (WO is generated with th...
about 1 year ago in IBM MAS - Spatial / Spatial 0 Planned for future release

Track progress WO of assets on the map

With spatial there is the possibility to work more from the map. We often work with multiple assets on 1 work order (Multi asset loc). For example, cleaning traffic signs. We want to be able to mark the progress from the map (MULTIASSETLOCCI.PROGR...
about 1 year ago in IBM MAS - Spatial / Spatial 0 Planned for future release

Manage Inspection Forms - The system should allow you to create a checklist type form to perform walk through inspections

There are many scenarios where a checklist (table) format inspection can be utilized. Housekeeping uses a Check list to mark if specific tasks were done in a particular day of the week.
over 1 year ago in IBM MAS - Manage (Base) / Asset/Work Management 0 Future consideration

Flag to Identify that a Purchase Requisition (PR) was Generated by Reorder

System: 7.6.1 Description: Currently Maximo is configured to be able to run the reorder automatically via cron task or to run the reorder manually. When those are generated, the only thing that identifies that the PR was generated by reorder is vi...
about 5 years ago in IBM MAS - Manage (Base) / Supply Chain 2 Planned for future release

Rethink the Self Service Center search engine to ensure the search engine just search among offering and ignore all incident, service request tickets

Here is something that causes some problems in the 7.6.1.3 version of Control desk and possibly since a longer time. Because outside of Control Desk application, the search engine of the Self Service Center currently fetches all incident, service ...
over 2 years ago in IBM MAS - Maximo IT 9 Not under consideration

Create work order or service request to Maximo Manage from a detected failure image, the actual version look like is not connected at all.

In the actual version of visual inspection, you only can create data sets and models, then use in mobile, but when you detected a failure you cannot create a work order to Manage Maximo or even a service request.
over 2 years ago in IBM MAS - Visual Inspection / MVI 4 Planned for future release

Change report scheduling date dialogue box to allow for annual report scheduling

The date schedule dialogue box for report scheduling in all applications is less detailed than in other places in Maximo (escalations, cron task instances), and does not allow for annually scheduled reports, such as run on May 15th every year.
over 3 years ago in IBM MAS - Manage (Base) 1 Future consideration